Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 64 Add closets to finished basement rooms, upgrade elec, add tempered glass shower enclosure, add non bearing wall between rec room study. R-1-70 zone sfd. Tmb kb ![]() ![]() Permit status: Closed | Completion date: July 1, 2011 | Current use: Residential | Permit id: Bld2011-02111 | |||||
SCORE 59 Elec work for basement remodel ![]() ![]() Permit type: Electrical | Permit status: Closed | Completion date: May 25, 2011 | Current use: Residential | Permit id: Bld2011-02173 | |||||
SCORE 59 Install water softener, 1 floor drain, and distrobution piping for basement remodel ![]() Permit type: Plumbing | Permit status: Inspections | Completion date: April 21, 2011 | Current use: Residential | Permit id: Bld2011-02252 |