Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Remove existing plaster from ceiling and wals, install 1 2" gypsum wall board on walls and ceiling, install new hardwood floors throughout, replace with new all windows, interior exterior doors into existing openings, all work to conform to ez alterations permit standards Date: August 29, 2017 Contractor: P And P Construction Llc Client: Css Investments Llc | Permit type: Alteration permit | Permit status: Active | Completion date: October 30, 2017 | Permit id: 812162 | |||||
SCORE 90 2 full bath and 1. 5 bath and kitchen sink (sfd) Date: September 22, 2017 Contractor: Coffelt Contracting Client: Css Investments Llc | Permit type: Plumbing permit | Permit status: Active | Completion date: October 30, 2017 | Permit id: 818506 | |||||
SCORE 100 New electrical wiring thorughout with recepts, switches, lights, fixtures, 120v interconnected smoke detectors and co detectors along with a new 200amp service complete with meter, panel & grounding as per 2008 nec (south district) Date: October 17, 2017 Contractor: Abraham Buyag Client: Css Investments Llc | Permit type: Electrical permit | Permit status: Active | Completion date: October 17, 2017 | Permit id: 824423 | |||||
SCORE 82 Install 90,0 btu warm air heater, 90% eff, warm air heater with 2 ton a c with duct work Date: November 16, 2017 Contractor: P And P Construction Llc Client: Css Investments Llc | Permit type: Mechanical permit | Permit status: Active | Completion date: November 16, 2017 | Permit id: 830847 |