Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Two geotechnical borings, b3 and b4, will be drilled to a depth of 25 feet or refusal with hollow stem augers. No monitoring well will be installed. Waste will be containerized in 55-gallon drums, tested and disposed of with cut soils and demolition debris during construction. Borehole will be tremie-grouted with 2 lb bentonite: 1 gallon water slurry upon completion. The closest intersection is w street, nw and foxhall rd, nw. Date: December 22, 2014 Client: Felipe Paraud | Applicant: Marc Tschibelu | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500087 | |||||
SCORE 80 Two geotechnical borings, b3 and b4, will be drilled to a depth of 25 feet or refusal with hollow stem augers. No monitoring well will be installed. Waste will be containerized in 55-gallon drums, tested and disposed of with cut soils and demolition debris during construction. Borehole will be tremie-grouted with 2 lb bentonite: 1 gallon water slurry upon completion. The closest intersection is w street, nw and foxhall rd, nw. Date: December 22, 2014 Contractor: Marc Tschibelu Client: Felipe Paraud | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500087 |