Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Installation of new rooftop cooling unit. New framing work to be completed by quinlan construction. Date: April 16, 2004 Contractor: Mtech Mechanical Technologies Client: Land Cottonwood | Applicant: Mtech Mechanical Technologies | Permit type: Mechanical | Permit status: N&v | Current use: Research & deve | |||||
SCORE 100 Install electrical circuit for air conditioner. Date: April 13, 2004 Contractor: Core Electric Inc Client: Land Cottonwood | Applicant: Core Electric, Inc. | Permit type: Electrical | Permit status: Cmp | Completion date: February 29, 2008 | Current use: Office - admini | |||||
SCORE 96 Fire alarm system Date: September 6, 2000 Contractor: Lord And Reynolds Elec Cont Inc Client: Cottonwood Land And Farms Ltd | Applicant: Lord & Reynolds Elec Cont Inc | Permit type: Fire | Permit status: Cmp | Completion date: September 27, 2000 | Current use: Office - techni | |||||
SCORE 95 Fire sprinkler - building addition Date: August 16, 2000 Contractor: Master Plumbers Inc Client: Cottonwood Land And Farms Ltd | Applicant: Master Plumbers Inc | Permit type: Fire | Permit status: Cmp | Completion date: September 27, 2000 | Current use: Office - techni | |||||
SCORE 95 Install a new 21 lb capacity passenger elevator. Date: August 10, 2000 Contractor: Otis Elevator Company Client: Cottonwood Land And Farms Ltd | Applicant: Otis Elevator Company | Permit type: Elevator | Permit status: Cmp | Completion date: October 5, 2000 | Current use: Commercial/reta | |||||
SCORE 96 Temp. Construction power Date: May 9, 2000 Contractor: Lord And Reynolds Elec Cont Inc Client: Cottonwood Land And Farms Ltd | Applicant: Lord & Reynolds Elec Cont Inc | Permit type: Electrical | Permit status: Cmp | Completion date: September 12, 2000 | Current use: Single family d | |||||
SCORE 95 Installation of wall and door in breakroom on first floor. Client: Land Cottonwood | Applicant: Quinlan Construction Inc | Permit type: Building | Permit status: Cmp | Completion date: October 19, 2007 | Current use: Research & deve | |||||
SCORE 95 Tenant remodel - for changes to offices, corridors, and related electrical (no new lights) for manufacturing of led lights inchalbeo technologiesinch. Includes mechanical to relocate diffusers and some gas line work. Client: Land Cottonwood | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 14, 2010 | Current use: Manufacturing, | |||||
SCORE 100 Scope of work letter for albeo relocate 6 sprinklers for new tennant finish Date: August 11, 2010 Contractor: Fire Defense Inc Client: Land Cottonwood | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: September 13, 2010 | Current use: Warehousing, ex | |||||
SCORE 65 Expansion of existing albeo technologies space. Removal of office areas, installation of one new door and associated electrical work. Client: Investment Flatiron | Applicant: Investment Flatiron | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 6, 2012 | Current use: Manufacturing, | |||||
SCORE 95 Interior non-loading bearing demolition work -- no occupancy allowed until separate tenant finish permit is obtained. Date: January 5, 2012 Contractor: Quinlan Construction Inc Client: Investment Flatiron | Applicant: Quinlan Construction Inc | Permit type: Demolition | Permit status: Cmp | Completion date: July 9, 2012 | Current use: Office - techni | |||||
SCORE 95 Tenant expansion into adjacent area -- remodel of 736 sf to reconfigure interior walls for relocated offices for administrative reseach and development areas, redesigned reception area. Utilize existing lighting in most areas -- new lighting in one area (see rcp page). Relocate add switches & outlets. Relocate sink, minor mechanical (relocate diffusers) Client: Investment Flatiron | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 6, 2012 | Current use: Manufacturing, | |||||
SCORE 95 Demolition permit for interior non-structural elements, finish materials, carpet, flooring & millwork, tenant remodel by pmt2012-02088. Date: May 1, 2012 Contractor: Quinlan Construction Inc Client: Investment Flatiron | Applicant: Quinlan Construction Inc | Permit type: Demolition | Permit status: Cmp | Completion date: July 9, 2012 | Current use: Research & deve | |||||
SCORE 100 Scope of work letter for albeo technologies phase 1 addition and relocation of 5 sprinkler heads for new tennant finish Date: May 4, 2012 Contractor: Fire Defense Inc Client: Investment Flatiron | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: June 18, 2012 | Current use: Office - profes | |||||
SCORE 100 Scope of work letter for albeo technologies phase 2 addition relocation of 8 sprinkler heads Date: May 21, 2012 Contractor: Fire Defense Inc Client: Investment Flatiron | Applicant: Fire Defense, Inc | Permit type: Fire | Permit status: Iss | Current use: Office - techni | |||||
SCORE 95 Tenant remodel for nature serve. To include relocation of walls, minor electrical and mechanical work and relocation of plumbing fixtures. Client: Investment Flatiron | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 5, 2012 | Current use: Office - techni | |||||
SCORE 95 Partial tear-off and overlay of 256 squares on a low slope roof -- remove existing ballast over a metal roof system, remove existing epdm membrane, replace epdm, reinstall ballast. Date: October 9, 2012 Contractor: Black Roofing Inc Client: Investment Flatiron | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: December 19, 2012 | Current use: Office - admini | |||||
SCORE 100 Fs - sowl - add 4 pendent spk heads and relocate 5 pendent spk heads. Date: October 19, 2012 Contractor: Fire Defense Inc Client: Investment Flatiron | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: November 5, 2012 | Current use: Office - admini | |||||
SCORE 95 Installation of a replacement rtu -- 13 seer minimum. Provide service outlet per nec and ifgc Date: May 9, 2013 Contractor: Timberline Mechanical Systems Client: Investment Flatiron | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: June 3, 2013 | Current use: Office - techni | |||||
SCORE 95 Tenant interior remodel for histotox to create new laboratory and office space for biomedical firm. Client: Investment Flatiron | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 25, 2015 | Current use: Office - techni | |||||
SCORE 95 Tenant interior remodel of office suite. Client: Investment Flatiron | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 14, 2015 | Current use: Office - admini | |||||
SCORE 95 Tenant interior remodel of technical office space. Scope includes addition of rtu, reconfiguration of office space, removal of two bathrooms, and addition of breakroom. Includes assoc, mepfoots. Client: Investment Flatiron | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 18, 2014 | Current use: Office - techni | |||||
SCORE 100 Fs - tf for office space Date: September 5, 2014 Contractor: Freedom Fire Protection Llc Client: Investment Flatiron | Applicant: Freedom Fire Protection, Llc | Permit type: Fire | Permit status: Iss | Current use: Office - admini | |||||
SCORE 100 Fs - sowl - inchrelocate 5 pendent sprinklers fo the office remodelinch Date: October 7, 2014 Contractor: Freedom Fire Protection Llc Client: Investment Flatiron | Applicant: Freedom Fire Protection, Llc | Permit type: Fire | Permit status: Cmp | Completion date: December 9, 2014 | Current use: Office - admini | |||||
SCORE 100 Fa - tf for histotox Date: October 17, 2014 Contractor: Trident Security Systems Client: Investment Flatiron | Applicant: Trident Security Systems | Permit type: Fire | Permit status: Cmp | Completion date: December 9, 2014 | Current use: Office - admini | |||||
SCORE 100 Fa - tf for romax Date: October 20, 2014 Contractor: Trident Security Systems Client: Investment Flatiron | Applicant: Trident Security Systems | Permit type: Fire | Permit status: Iss | Current use: Office - admini | |||||
SCORE 100 Fs - tf for romax Date: October 22, 2014 Contractor: Freedom Fire Protection Llc Client: Investment Flatiron | Applicant: Freedom Fire Protection, Llc | Permit type: Fire | Permit status: Iss | Current use: Office - admini | |||||
SCORE 95 Replacement of split system rtu, furnace 93% - 1 stage, cu 3. 5 ton 14 seer. Date: November 21, 2014 Contractor: Timberline Mechanical Systems Client: Investment Flatiron | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: March 30, 2015 | Current use: Existing | |||||
SCORE 95 Tenant interior remodel to install commercial kitchen for catering services company. Client: Investment Flatiron | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 6, 2015 | Current use: Manufacturing, | |||||
SCORE 83 Suite 2 - tenant remodel (2,289sf) to exisiting professional office space. Scope of work includes partial demo of existing space and subsequent renovation to establish two new conference rooms and replace existing break-room mill-work. Includes associated meps. Client: Investment Flatiron | Applicant: Amanda Johnson | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 4, 2015 | Current use: Office - profes | |||||
SCORE 100 Fa - es - add rps and notification devices to existing sk system. Date: February 11, 2015 Contractor: Trident Security Systems Client: Investment Flatiron | Applicant: Trident Security Systems | Permit type: Fire | Permit status: Iss | Current use: Office - admini | |||||
SCORE 93 Interior, non-structural demolition permit in association with pmt2015-00216 Date: February 24, 2015 Contractor: Alcorn Construction Inc Client: Investment Flatiron | Applicant: Alcorn Construction Inc | Permit type: Demolition | Permit status: Cmp | Completion date: March 18, 2015 | Current use: Office - admini | |||||
SCORE 99 Fa - add one h s ::: add two strobes ::: relocate two notification devices Date: March 27, 2015 Contractor: Fire Alarm System Technologies Inc Client: Investment Flatiron | Applicant: Fire Alarm System Technologies Inc | Permit type: Fire | Permit status: Cmp | Completion date: June 5, 2015 | Current use: Office - admini | |||||
SCORE 95 Fs - tf for office space. Date: April 14, 2015 Contractor: Abc Fire Protection Inc Client: Investment Flatiron | Applicant: Abc Fire Protection Inc | Permit type: Fire | Permit status: Iss | Current use: Office - admini | |||||
SCORE 95 Hood x2 for spice cabinet :::if building is equipped throughout with a fire alarm system, hoods must interface (licensed fire alarm contractor required::: Date: April 17, 2015 Contractor: Colorado West Fire Protection Client: Investment Flatiron | Applicant: Colorado West Fire Protection | Permit type: Fire | Permit status: Cmp | Completion date: June 4, 2015 | Current use: Restaurant, exi | |||||
SCORE 100 Fs - tf for space age life Date: April 21, 2015 Contractor: Freedom Fire Protection Llc Client: Investment Flatiron | Applicant: Freedom Fire Protection, Llc | Permit type: Fire | Permit status: Cmp | Completion date: June 5, 2015 | Current use: Restaurant, exi | |||||
SCORE 95 Interior, non-structural demolition of interior walls for dispay of space for future tenants. Date: April 27, 2015 Contractor: Quinlan Construction Inc Client: Investment Flatiron | Applicant: Quinlan Construction Inc | Permit type: Demolition | Permit status: Iss | Current use: Office - profes | |||||
SCORE 95 New electric wall sign for incha spice of lifeinch. Date: May 25, 2015 Contractor: Keith Hawks Signs Inc Client: Investment Flatiron | Applicant: Keith Hawks Signs Inc | Permit type: Sign | Permit status: Cmp | Completion date: August 19, 2015 | Current use: Restaurant, exi | |||||
SCORE 95 Construction of a new trash enclosure. Date: August 3, 2015 Contractor: Quinlan Construction Inc Client: Investment Flatiron | Applicant: Quinlan Construction Inc | Permit type: Fence | Permit status: Iss | Current use: Commercial/reta | |||||
SCORE 95 Re-image of existing monument sign with non-illuminated sleeve over existing sign. New sign to contain address, flatirion park branding and multi-tenant identification. Permit type: Sign | Permit status: Iss | Current use: Existing | Permit id: Pmt2016-00633 | |||||
SCORE 95 Direct replacement of four rooftop units wth 4-ton, 15 seer units. Same size and location. Client: Investment Flatiron | Permit type: Mechanical | Permit status: Cmp | Completion date: August 2, 2016 | Current use: Existing | Permit id: Pmt2016-02778 | |||||
Bore 66foot for new comcast service to 2108 55th st. Date: September 27, 2016 Client: Investment Flatiron | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-04499 | |||||
SCORE 95 Installation of a replacement rtu -- 13 seer minimum. Provide service outlet per nec and ifgc Client: Investment Flatiron | Permit type: Mechanical | Permit status: Cmp | Completion date: June 3, 2013 | Current use: Office - technical, existing | Permit id: Pmt2013-02024 | |||||
SCORE 96 Temp. Construction power Client: Cottonwood Land And Farms Ltd | Permit type: Electrical | Permit status: Cmp | Completion date: September 12, 2000 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-01891 | |||||
SCORE 95 Tenant interior remodel for histotox to create new laboratory and office space for biomedical firm. Client: Investment Flatiron | Permit type: Building, electrical, mechanical, plumbing, flood not required | Permit status: Cmp | Completion date: March 25, 2015 | Current use: Office - technical, tenant remodel | Permit id: Pmt2014-03089 | |||||
SCORE 95 Tenant interior remodel of office suite. Client: Investment Flatiron | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: January 14, 2015 | Current use: Office - administrative, tenant remodel | Permit id: Pmt2014-03695 | |||||
SCORE 95 Tenant interior remodel of technical office space. Scope includes addition of rtu, reconfiguration of office space, removal of two bathrooms, and addition of breakroom. Includes assoc, mepfoots. Client: Investment Flatiron | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: December 18, 2014 | Current use: Office - technical, tenant remodel | Permit id: Pmt2014-04086 | |||||
SCORE 95 Fs - tf for office space Client: Investment Flatiron | Permit type: Fire | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2014-04144 | |||||
SCORE 95 Fs - sowl - inchrelocate 5 pendent sprinklers fo the office remodelinch Client: Investment Flatiron | Permit type: Fire | Permit status: Cmp | Completion date: December 9, 2014 | Current use: Office - administrative, existing | Permit id: Pmt2014-04602 | |||||
SCORE 100 Fa - tf for histotox Client: Investment Flatiron | Permit type: Fire | Permit status: Cmp | Completion date: December 9, 2014 | Current use: Office - administrative, existing | Permit id: Pmt2014-04764 | |||||
SCORE 100 Fa - tf for romax Client: Investment Flatiron | Permit type: Fire | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2014-04804 | |||||
SCORE 95 Fs - tf for romax Client: Investment Flatiron | Permit type: Fire | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2014-04857 | |||||
SCORE 95 Replacement of split system rtu, furnace 93% - 1 stage, cu 3. 5 ton 14 seer. Client: Investment Flatiron | Permit type: Mechanical | Permit status: Cmp | Completion date: March 30, 2015 | Current use: Existing | Permit id: Pmt2014-05310 | |||||
SCORE 95 Tenant interior remodel to install commercial kitchen for catering services company. Client: Investment Flatiron | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: May 6, 2015 | Current use: Manufacturing, tenant remodel | Permit id: Pmt2014-05465 | |||||
SCORE 95 Tenant expansion into adjacent area -- remodel of 736 sf to reconfigure interior walls for relocated offices for administrative reseach and development areas, redesigned reception area. Utilize existing lighting in most areas -- new lighting in one area (see rcp page). Relocate add switches & outlets. Relocate sink, minor mechanical (relocate diffusers) Client: Investment Flatiron | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: July 6, 2012 | Current use: Manufacturing, tenant remodel | Permit id: Pmt2012-02088 | |||||
SCORE 95 Scope of work letter for albeo technologies phase 1 addition and relocation of 5 sprinkler heads for new tennant finish Client: Investment Flatiron | Permit type: Fire | Permit status: Cmp | Completion date: June 18, 2012 | Current use: Office - professional, existing | Permit id: Pmt2012-02144 | |||||
SCORE 95 Scope of work letter for albeo technologies phase 2 addition relocation of 8 sprinkler heads Client: Investment Flatiron | Permit type: Fire | Permit status: Iss | Current use: Office - technical, existing | Permit id: Pmt2012-02379 | |||||
SCORE 95 Tenant remodel for nature serve. To include relocation of walls, minor electrical and mechanical work and relocation of plumbing fixtures. Client: Investment Flatiron | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: November 5, 2012 | Current use: Office - technical, tenant remodel | Permit id: Pmt2012-04432 | |||||
SCORE 95 Partial tear-off and overlay of 256 squares on a low slope roof -- remove existing ballast over a metal roof system, remove existing epdm membrane, replace epdm, reinstall ballast. Client: Investment Flatiron | Permit type: Roofing | Permit status: Cmp | Completion date: December 19, 2012 | Current use: Office - administrative, existing | Permit id: Pmt2012-04915 | |||||
SCORE 95 Fs - sowl - add 4 pendent spk heads and relocate 5 pendent spk heads. Client: Investment Flatiron | Permit type: Fire | Permit status: Cmp | Completion date: November 5, 2012 | Current use: Office - administrative | Permit id: Pmt2012-05048 | |||||
SCORE 95 Tenant remodel - for changes to offices, corridors, and related electrical (no new lights) for manufacturing of led lights inchalbeo technologiesinch. Includes mechanical to relocate diffusers and some gas line work. Client: Land Cottonwood | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: September 14, 2010 | Current use: Manufacturing, tenant remodel | Permit id: Pmt2010-02221 | |||||
SCORE 95 Scope of work letter for albeo relocate 6 sprinklers for new tennant finish Client: Land Cottonwood | Permit type: Fire | Permit status: Cmp | Completion date: September 13, 2010 | Current use: Warehousing, existing | Permit id: Pmt2010-03266 | |||||
SCORE 95 Installation of wall and door in breakroom on first floor. Client: Land Cottonwood | Permit type: Building | Permit status: Cmp | Completion date: October 19, 2007 | Current use: Research & development, tenant remodel | Permit id: Pmt2007-02460 | |||||
Expansion of existing albeo technologies space. Removal of office areas, installation of one new door and associated electrical work. Date: December 8, 2011 Value: $1,700 Client: Investment Flatiron | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 6, 2012 | Current use: Manufacturing, tenant remodel | Permit id: Pmt2011-05332 | |||||
SCORE 93 Suite 2 - tenant remodel (2,289sf) to exisiting professional office space. Scope of work includes partial demo of existing space and subsequent renovation to establish two new conference rooms and replace existing break-room mill-work. Includes associated meps. Client: Investment Flatiron | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: May 4, 2015 | Current use: Office - professional, tenant remodel | Permit id: Pmt2015-00216 | |||||
SCORE 100 Fa - es - add rps and notification devices to existing sk system. Client: Investment Flatiron | Permit type: Fire | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2015-00434 | |||||
SCORE 99 Fa - add one h s ::: add two strobes ::: relocate two notification devices Client: Investment Flatiron | Permit type: Fire | Permit status: Cmp | Completion date: June 5, 2015 | Current use: Office - administrative, existing | Permit id: Pmt2015-01081 | |||||
SCORE 95 Fs - tf for office space. Client: Investment Flatiron | Permit type: Fire | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2015-01099 | |||||
SCORE 95 Hood x2 for spice cabinet :::if building is equipped throughout with a fire alarm system, hoods must interface (licensed fire alarm contractor required::: Client: Investment Flatiron | Permit type: Fire | Permit status: Cmp | Completion date: June 4, 2015 | Current use: Restaurant, existing | Permit id: Pmt2015-01390 | |||||
SCORE 95 Fs - tf for space age life Client: Investment Flatiron | Permit type: Fire | Permit status: Cmp | Completion date: June 5, 2015 | Current use: Restaurant, existing | Permit id: Pmt2015-01438 | |||||
SCORE 95 New electric wall sign for incha spice of lifeinch. Client: Investment Flatiron | Permit type: Sign | Permit status: Cmp | Completion date: August 19, 2015 | Current use: Restaurant, existing | Permit id: Pmt2015-01561 | |||||
SCORE 95 Construction of a new trash enclosure. Client: Investment Flatiron | Permit type: Fence | Permit status: Cmp | Completion date: December 18, 2015 | Current use: Commercial/retail, existing | Permit id: Pmt2015-02845 | |||||
SCORE 74 Installation of a 3 cfm exhaust fan, venting a point of use enclosure, for non-continuous use. New roof penetration per engineerfoots specifications. Client: Flatiron Gpif | Permit type: Mechanical | Permit status: Cmp | Completion date: May 22, 2017 | Current use: Office - technical, existing | Permit id: Pmt2017-01492 | |||||
SCORE 95 Install a new 21 lb capacity passenger elevator. Client: Cottonwood Land And Farms Ltd | Permit type: Elevator | Permit status: Cmp | Completion date: October 5, 2000 | Current use: Commercial/retail, existing | Permit id: Pmt2000-03325 | |||||
SCORE 95 Fire sprinkler - building addition Client: Cottonwood Land And Farms Ltd | Permit type: Fire | Permit status: Cmp | Completion date: September 27, 2000 | Current use: Office - technical, existing | Permit id: Pmt2000-03371 | |||||
SCORE 96 Fire alarm system Client: Cottonwood Land And Farms Ltd | Permit type: Fire | Permit status: Cmp | Completion date: September 27, 2000 | Current use: Office - technical, existing | Permit id: Pmt2000-03651 | |||||
SCORE 95 Install electrical circuit for air conditioner. Client: Land Cottonwood | Permit type: Electrical | Permit status: Cmp | Completion date: February 29, 2008 | Current use: Office - administrative, existing | Permit id: Pmt2004-01337 | |||||
SCORE 95 Installation of new rooftop cooling unit. New framing work to be completed by quinlan construction. Client: Land Cottonwood | Permit type: Mechanical | Permit status: N&v | Current use: Research & development, existing | Permit id: Pmt2004-01388 |