Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: August 11, 2016 Client: Alpha Pa Iii Llc | Permit status: Active | Permit id: 706553 | |||||
Alteration permit Date: August 11, 2016 Client: Alpha Pa Iii Llc | Permit status: Active | Permit id: 706553 | |||||
SCORE 99 For interior level 2 alteration to include alterations existing bathroom to accessible bathroom as per plans. For exterior facade repairs as per plans. Separate permits require for all mechanical, electrical and plumbing work. Date: August 11, 2016 Contractor: Penstone Building Corp Client: Alpha Pa Iii Llc | Permit type: Alteration permit | Permit status: Active | Completion date: November 13, 2017 | Permit id: 706553 | |||||
SCORE 100 Removing all pvc piping, rough in for a cast iron and copper piping rough in for a powder room 1st floor along with kitchen on 2nd floor. All installations in accordance with 2004 ppc Date: November 10, 2017 Contractor: Allen E Kensil Client: Alpha Pa Iii Llc | Permit type: Plumbing permit | Permit status: Active | Completion date: November 17, 2017 | Permit id: 831353 | |||||
SCORE 100 Replace 200amp service entrance cable,replace outlets,switches and 3 distribution in basement per 2008 nec (sfd) Date: October 20, 2017 Contractor: Ade Electric Client: Alpha Pa Iii Llc | Permit type: Electrical permit | Permit status: Active | Completion date: October 20, 2017 | Permit id: 825619 | |||||
SCORE 61 Level ii interior alterations to create a shell commercial space (use registration and fit-out permits required prior to occupancy) with accessible toilet room on the first floor of an existing building as per approved plans. Building not required to be sprinklered at this time. Separate permits required for any mep work Date: October 25, 2017 Contractor: Nordco General Contractors Client: Alpha Pa Iii Llc | Permit type: Alteration permit | Permit status: Active | Completion date: November 17, 2017 | Permit id: 822124 |