Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Pressure vessel Date: July 12, 2012 Permit status: Issued | Current use: Commercial | Permit id: 12045-10000-001 | |||||
SCORE 92 Htu-4 heat exchanger (e-1972) foundation and pipe supports Permit type: Nonbldg-new | Permit status: Permit finaled | Current use: Commercial | Permit id: 10020-10000-008 | |||||
SCORE 83 New foundation (16 caissons) and steel platform to support electrical Permit type: Nonbldg-new | Permit status: Permit finaled | Current use: Commercial | Permit id: 09010-40001-020 | |||||
SCORE 97 Install a 7. 5mva, 13. 8kv:2. 4kv step down transformer in substation #10 Date: August 18, 2011 Contractor: Bruce Permit type: Electrical | Permit status: Issued | Current use: Commercial | Permit id: 11041-10001-097 | |||||
SCORE 99 Excavate & backfill for new mat foundation. Permit type: Grading | Permit status: Issued | Current use: Commercial | Permit id: 09030-10000-047 | |||||
SCORE 98 Supplemental permit to exempt the requirements of methane mitigation s Permit type: Nonbldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 09010-10001-013 | |||||
SCORE 65 Add structural bracing at existing structural rack/ cable support; 5x Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 11016-10000-088 | |||||
SCORE 78 Fire sprinkler Date: April 24, 2012 Contractor: Josh Ess Permit status: Permit expired | Current use: Commercial | Permit id: 10043-40004-012 | |||||
SCORE 100 Electrical Date: October 22, 2012 Contractor: Andrew Permit status: Permit finaled | Current use: Commercial | Permit id: 12041-40000-251 | |||||
SCORE 59 Replace 1 ton water cooled chiller unit, pumps, and ventilation fans Date: October 3, 2011 Contractor: Bruce Panting Permit type: Hvac | Permit status: Permit finaled | Current use: Commercial | Permit id: 11044-10000-101 | |||||
SCORE 99 Install a new amp circuit for a pre-fabricated gas analyzimg equipm Date: August 5, 2011 Contractor: Mark Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 10041-10000-163 | |||||
SCORE 98 Industrial equipment tower Date: July 23, 2012 Contractor: Gregory Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 11020-40002-026 | |||||
Electrical Date: October 29, 2010 Permit status: Permit finaled | Current use: Commercial | Permit id: 10041-40000-216 | |||||
SCORE 59 Supplemental to 11020-10000-026 revise design for shoring system. Permit type: Nonbldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 11020-10001-026 | |||||
SCORE 56 Expansion of a petrochemical plant. Addition of transformers, switchg Date: August 14, 2012 Contractor: Clyde Boothe Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 12041-10000-142 | |||||
Installation of a state of california permitted pre-manufactured build Date: May 26, 2011 Value: $500,000 Permit type: Bldg-new | Permit status: Cofo issued | Current use: Commercial | Permit id: 09010-10000-022 | |||||
SCORE 98 Electrical Date: June 26, 2012 Contractor: Lori Brown Permit status: Issued | Current use: Special equipment | Permit id: 12041-90000-148 | |||||
SCORE 59 Simplified method "c" methane gas venting system for a modular storage Date: December 23, 2011 Contractor: Russel Boone Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 11042-10000-226 | |||||
SCORE 59 Proposed 4- 5/8" max. High retaining walls to surround fire hydrant Permit type: Nonbldg-new | Permit status: Permit finaled | Current use: Commercial | Permit id: 11020-10000-007 | |||||
SCORE 78 Fire sprinkler Date: November 22, 2011 Contractor: Josh Ess Permit status: Permit finaled | Current use: Commercial | Permit id: 10043-40001-012 | |||||
SCORE 56 Proposed removal and recompaction per approved soils report prepared b Permit type: Grading | Permit status: Issued | Current use: Commercial | Permit id: 11030-10000-019 | |||||
SCORE 98 Proposed removal and recompaction as required by approved soil report Permit type: Grading | Permit status: Permit finaled | Current use: Commercial | Permit id: 10030-10000-091 | |||||
SCORE 98 Shallow mat foundation for prefabricated shelter for electrical equipm Permit type: Bldg-new | Permit status: Permit finaled | Current use: Commercial | Permit id: 09010-10000-014 | |||||
SCORE 59 Tesoro, new underground 2. 4 kv line. Partially in the cities of carso Date: March 19, 2012 Contractor: Gene White Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 11041-10000-221 | |||||
SCORE 56 Removal and recompaction for structure under building permit# 09010-40 Permit type: Grading | Permit status: Permit expired | Current use: Commercial | Permit id: 10030-40000-015 | |||||
SCORE 100 Electrical Date: March 7, 2012 Contractor: Roger Theroux Permit status: Permit finaled | Current use: Special equipment | Permit id: 12041-90000-051 | |||||
SCORE 89 New steel equipment platform (8ft x 8ft x 43. 5ft) with foundation (12f Permit type: Nonbldg-new | Permit status: Issued | Current use: Commercial | Permit id: 11020-40000-015 | |||||
SCORE 98 Install new concrete foundation pad approx. 13 ft x 12 ft. For mechan Permit type: Nonbldg-new | Permit status: Permit finaled | Current use: Commercial | Permit id: 09010-10000-013 | |||||
Supplemental to permit # 09010-10000-02278 to transfer permit to contr Date: September 7, 2011 Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 09010-40001-022 | |||||
SCORE 56 Install concrete foundation for state approved pump enclosure, two fue Permit type: Nonbldg-new | Permit status: Issued | Current use: Commercial | Permit id: 10020-10000-029 | |||||
Plumbing Date: September 7, 2011 Permit status: Permit finaled | Current use: Commercial | Permit id: 10042-40001-017 | |||||
SCORE 98 This supplemental permit is to exempt methane hazard mitigation in the Date: March 21, 2011 Contractor: Mark Newman Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 09010-10001-017 | |||||
SCORE 99 Install a new amp circuit for a pre-fabricated gas analyzimg equipm Date: March 29, 2011 Contractor: Mark Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 10041-10000-163 | |||||
SCORE 59 Excavation & backfill for retaining walls under 11020-10000-00791. (9 Permit type: Grading | Permit status: Issued | Current use: Commercial | Permit id: 11030-10000-017 | |||||
SCORE 65 Revisions to foundation details Permit type: Bldg-alter/repair | Permit status: Permit expired | Current use: Commercial | Permit id: 11016-10001-088 | |||||
SCORE 98 Proposed 10. 17 x 18. 33 mechanical equpment foundation pad only. Permit type: Nonbldg-new | Permit status: Permit expired | Current use: Commercial | Permit id: 11020-10000-026 | |||||
SCORE 56 Plan check for undeground fire lines, fire hydrants and fixed monitori Date: May 17, 2010 Contractor: Maria Mcgraw Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 09043-10000-020 | |||||
SCORE 62 Electrical Date: November 30, 2011 Contractor: Michael Layton Permit status: Permit finaled | Current use: Commercial | Permit id: 11041-90000-254 | |||||
SCORE 56 Install pipe supports on propane rack on concrete caisson Permit type: Nonbldg-new | Permit status: Issued | Current use: Commercial | Permit id: 11020-10000-026 | |||||
SCORE 98 Installation of a 13 x 16 mat foundation for equipment (fiberglass Permit type: Nonbldg-new | Permit status: Permit finaled | Current use: Commercial | Permit id: 10010-10000-015 | |||||
SCORE 78 Underground fire piping and private hydrants for tsoro refinery phase- Date: May 9, 2012 Contractor: Josh Ess Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 10043-10000-018 | |||||
SCORE 78 Tsoro refinery pase-3 fire protection (underground piping, fire hydra Date: May 23, 2011 Contractor: Josh Ess Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 10043-10000-012 | |||||
Install fire sprinkler (water spray) system around truck loading rack Date: April 3, 2012 Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 11043-10000-030 | |||||
Site preparation. Soil remove and recompaction. Date: September 13, 2011 Value: $250 Permit type: Grading | Permit status: Issued | Current use: Commercial | Permit id: 11030-10000-043 | |||||
SCORE 100 Electrical Date: August 18, 2011 Contractor: Roger Theroux Permit status: Permit closed | Current use: Special equipment | Permit id: 11041-90000-175 | |||||
SCORE 59 Plan check power for electrical equipment in an prefabricated enclosur Date: March 31, 2010 Contractor: Craig Theron Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 09041-10000-238 | |||||
SCORE 59 Replacement of existing cooling tower, chiller, pumps and exhaust fans Permit type: Bldg-alter/repair | Permit status: Permit expired | Current use: Commercial | Permit id: 11016-10000-172 | |||||
SCORE 98 Recompact soils above concrete mat. Max. Depth 6. 10 cu. Yd. Permit type: Grading | Permit status: Permit closed | Current use: Commercial | Permit id: 12030-10000-038 | |||||
SCORE 100 Hvac Date: February 29, 2012 Contractor: Russell Wright Permit status: Permit finaled | Current use: Commercial | Permit id: 12044-90000-020 | |||||
SCORE 56 New pump and equipment foundations. Permit type: Nonbldg-new | Permit status: Permit expired | Current use: Commercial | Permit id: 11020-10000-007 | |||||
SCORE 56 Ti - refinery location - project is located in a classified location. Date: March 31, 2010 Contractor: Omar Zuniga Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 09041-10000-244 | |||||
SCORE 98 Construct concrete mat foundation at grade (13x13) for prefabricate Permit type: Bldg-new | Permit status: Permit finaled | Current use: Commercial | Permit id: 09010-10000-017 | |||||
Installation of a state of california permitted pre-manufactured build Date: May 26, 2011 Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 10041-10000-017 | |||||
SCORE 56 Plan check for replacement of undeground fire lines, fire hydrants and Date: November 8, 2010 Contractor: Maria Mcgrew Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 09043-10000-024 | |||||
SCORE 99 Site grading for new mat foundation. Permit type: Grading | Permit status: Permit finaled | Current use: Commercial | Permit id: 09030-10000-041 | |||||
SCORE 65 Grading: max. 5 ft vertical cut / backfill for proposed 139"x50" an Permit type: Grading | Permit status: Permit finaled | Current use: Commercial | Permit id: 12030-10000-001 | |||||
One fire monitor platform. Date: April 16, 2012 Value: $75,000 Permit type: Nonbldg-new | Permit status: Cofo issued | Current use: Commercial | Permit id: 10020-10000-024 | |||||
New foundation for transformer. Date: August 31, 2012 Value: $30,000 Permit type: Nonbldg-new | Permit status: Cofo issued | Current use: Commercial | Permit id: 12020-40000-015 | |||||
SCORE 59 New one story electrical equipment room. Permit type: Bldg-new | Permit status: Cofo issued | Current use: Commercial | Permit id: 09010-40000-020 | |||||
SCORE 56 Install kva ups equipment at hbd bldg. To supply loads at separate Date: July 31, 2012 Contractor: Scottie Dinh Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 12041-10000-034 | |||||
SCORE 92 New foundation for fire water tank (100ft diameter x 52 ft height). Permit type: Nonbldg-new | Permit status: Issued | Current use: Commercial | Permit id: 12020-40000-012 | |||||
SCORE 92 Installation of additional - pipe and cable tray supports (ps-2 th Permit type: Nonbldg-new | Permit status: Issued | Current use: Commercial | Permit id: 10020-10000-015 | |||||
SCORE 97 Supplemental permit to permit # 09020-30000-01831 to change contractor Date: June 15, 2011 Contractor: Donald Permit type: Bldg-alter/repair | Permit status: Permit expired | Current use: Commercial | Permit id: 09020-30001-018 | |||||
SCORE 97 Install a new shelterin tesoro refinary for a new gas emission analyze Date: June 8, 2012 Contractor: John Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 12041-10000-090 | |||||
SCORE 59 Industrial equipment tower Permit type: Nonbldg-new | Permit status: Cofo issued | Current use: Commercial | Permit id: 11020-10000-026 | |||||
SCORE 56 Add 2 hp motor starters to an existing outdoor switchrack, in a haz Date: August 5, 2011 Contractor: Giovanni Parra Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 09041-10000-214 | |||||
SCORE 63 Modify existing pipe support structure. Permit type: Nonbldg-alter/repair | Permit status: Permit expired | Current use: Commercial | Permit id: 12026-40000-000 | |||||
SCORE 98 From a switchrack in class i div 2 area , provide power to a analyzer Date: April 21, 2010 Contractor: Mark Newman Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 09041-10000-121 | |||||
SCORE 98 Grading permit for r&r for proposed equipment foundation pad footing. Permit type: Grading | Permit status: Permit expired | Current use: Commercial | Permit id: 11030-10000-057 | |||||
SCORE 59 Plan check for state approved building installation. Includes onsite w Date: May 26, 2011 Contractor: Angelo Ciccaiello Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 10042-10000-017 | |||||
SCORE 56 Approval of structural analysis for existing (29) power poles to suppo Permit type: Nonbldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 11026-10000-001 | |||||
SCORE 63 Construct new 15x concrete pad for equipment support. Permit type: Nonbldg-new | Permit status: Issued | Current use: Commercial | Permit id: 11020-40000-021 | |||||
SCORE 98 Electrical Date: November 1, 2012 Contractor: Raymond Permit status: Permit finaled | Current use: Commercial | Permit id: 12041-40000-262 | |||||
SCORE 98 Electrical Date: July 25, 2014 Contractor: Lori Brown Permit status: Issued | Current use: Special equipment | Permit id: 14041-90000-201 | |||||
SCORE 85 Re-roof with class a or b material weighing less than 6 pounds per sq. Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 15016-30000-130 | |||||
SCORE 97 Supplemental to permit # 12020-40000-012 to transfer permit to contr Date: August 19, 2013 Contractor: John Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 12020-40001-012 | |||||
SCORE 65 New equipment pad Permit type: Nonbldg-new | Permit status: Permit finaled | Current use: Commercial | Permit id: 13020-40000-020 | |||||
SCORE 90 Plumbing Date: March 22, 2016 Contractor: John Klein Permit status: Permit finaled | Current use: Commercial | Permit id: 16042-10000-056 | |||||
SCORE 61 Plancheck for power. Ugrade main office power distribuition mcc-88. At Date: November 14, 2014 Contractor: Bill Kuhns Permit type: Electrical | Permit status: Issued | Current use: Commercial | Permit id: 14041-10000-154 | |||||
SCORE 97 Replace an existing fire pump system in the north plant of tesoro refi Date: March 20, 2013 Contractor: Angelo Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 11041-10000-002 | |||||
SCORE 97 Electrical Date: March 5, 2015 Contractor: Ted Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-40000-064 | |||||
SCORE 100 Electrical Date: January 26, 2016 Contractor: Roger Theroux Permit status: Issued | Current use: Special equipment | Permit id: 16041-90000-027 | |||||
SCORE 81 Hvac Date: February 1, 2013 Contractor: Andrew Perez Permit status: Issued | Current use: Commercial | Permit id: 13044-40000-011 | |||||
SCORE 99 Electrical Date: December 15, 2014 Contractor: Jason Permit status: Issued | Current use: Commercial | Permit id: 14041-40000-345 | |||||
Non-hillside grading permit for cut, backfill, and 95% recompaction fo Date: March 20, 2013 Value: $820 Permit type: Grading | Permit status: Issued | Current use: Commercial | Permit id: 11030-10000-015 | |||||
SCORE 99 Hvac Date: March 17, 2016 Contractor: Hratch Arezouyan Permit status: Issued | Current use: Commercial | Permit id: 15044-10001-012 | |||||
SCORE 92 New equipment pad and platform. Permit type: Nonbldg-new | Permit status: Issued | Current use: Commercial | Permit id: 13020-40000-014 | |||||
SCORE 86 Fire sprinkler Date: June 18, 2013 Contractor: John Vincent Permit status: Permit expired | Current use: Commercial | Permit id: 09043-40003-012 | |||||
SCORE 100 Electrical Date: April 10, 2013 Contractor: Roger Theroux Permit status: Permit finaled | Current use: Special equipment | Permit id: 13041-90000-091 | |||||
SCORE 86 Approved plans were expired. (original job description:plan check for Date: July 17, 2013 Contractor: John Vincent Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 13043-10000-022 | |||||
SCORE 64 New concrete equipment foundation pad to support v2419 clay filter tan Permit type: Nonbldg-new | Permit status: Permit finaled | Current use: Commercial | Permit id: 14020-30000-023 | |||||
SCORE 67 Supplemental to 15020-40000-02528 to revise equipment pad to 24. 5 to Permit type: Nonbldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 15020-40001-025 | |||||
SCORE 84 Installation of new steel framed walkway; the frames will be lifted in Permit type: Nonbldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 14026-10000-004 | |||||
SCORE 61 Replace existing ups system with new (2) 60kva ups and (2) 75 kva tran Date: June 19, 2015 Contractor: Mario Zuniga Permit type: Electrical | Permit status: Issued | Current use: Commercial | Permit id: 15041-10000-074 | |||||
SCORE 64 Non-building support to support new heat exchanger Permit type: Nonbldg-new | Permit status: Permit finaled | Current use: Commercial | Permit id: 14020-30000-013 | |||||
SCORE 92 Foundation for mmc (motor control center) and metering station and sup Permit type: Nonbldg-new | Permit status: Issued | Current use: Commercial | Permit id: 14020-40000-026 | |||||
SCORE 78 Tsoro refinery pase-5 fire protection (underground piping, fire hydra Date: March 20, 2013 Contractor: Josh Ess Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 10043-10000-027 | |||||
Electrical Date: May 21, 2013 Permit status: Permit expired | Current use: Special equipment | Permit id: 13041-10000-132 | |||||
SCORE 100 Electrical Date: October 8, 2015 Contractor: Roger Theroux Permit status: Issued | Current use: Special equipment | Permit id: 15041-90000-335 | |||||
SCORE 100 Fire sprinkler Date: February 4, 2013 Contractor: Nicholas Permit status: Permit finaled | Current use: Commercial | Permit id: 13043-40000-003 | |||||
SCORE 100 Electrical Date: November 12, 2015 Contractor: Roger Theroux Permit status: Issued | Current use: Special equipment | Permit id: 15041-90000-380 | |||||
New foundation for support of new switchrack extension for oil refiner Date: October 15, 2015 Value: $50,000 Permit type: Nonbldg-new | Permit status: Issued | Current use: Commercial | Permit id: 15020-10000-027 | |||||
SCORE 98 Electrical Date: September 9, 2014 Contractor: Steven Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-40000-246 | |||||
SCORE 61 Plan check for power. Addition of (7) lighting fixtures and 1 rec outl Date: May 15, 2015 Contractor: Orlado Medina Sy Permit type: Electrical | Permit status: Issued | Current use: Commercial | Permit id: 14041-10000-323 | |||||
SCORE 61 Adding feeder to power switchrack. Plan check for power only. Date: September 22, 2015 Contractor: Orlando Sy Permit type: Electrical | Permit status: Issued | Current use: Commercial | Permit id: 15041-10000-108 | |||||
SCORE 67 New equipment pad Permit type: Nonbldg-new | Permit status: Issued | Current use: Commercial | Permit id: 15020-40000-025 | |||||
Install 8 new max. 5ft high and max. 29ft long retaining walls for fir Date: March 20, 2013 Value: $24,000 Permit type: Nonbldg-new | Permit status: Permit finaled | Current use: Commercial | Permit id: 10020-10000-027 | |||||
SCORE 98 Electrical Date: October 7, 2013 Contractor: Lori Brown Permit status: Permit finaled | Current use: Special equipment | Permit id: 13041-90000-278 | |||||
SCORE 95 Install new 100a 480v service switchrack and related conduit for biosp Date: April 21, 2014 Contractor: Naresh Patel Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-10000-286 | |||||
SCORE 70 New concrete pad for mechanical equipment and pipe support Permit type: Nonbldg-new | Permit status: Issued | Current use: Commercial | Permit id: 16020-10000-005 | |||||
SCORE 86 Supplemental to 11030-10000-01948 to transfer contractor of record. Date: September 6, 2013 Contractor: John Vincent Permit type: Bldg-alter/repair | Permit status: Permit closed | Current use: Commercial | Permit id: 11030-40001-019 | |||||
Fire sprinkler Date: January 29, 2014 Permit status: Permit finaled | Current use: Commercial | Permit id: 14043-10000-003 | |||||
SCORE 100 Electrical Date: July 29, 2014 Contractor: Roger Theroux Permit status: Issued | Current use: Special equipment | Permit id: 14041-90000-203 | |||||
SCORE 95 Construct (2) new electrical equiptment panel supports & (1) conduit Permit type: Nonbldg-new | Permit status: Issued | Current use: Commercial | Permit id: 13020-10000-024 | |||||
SCORE 61 Relocation of an existing 250hp well pump in a refinery. Non hazardou Date: December 8, 2015 Contractor: Dilip Hinorani Permit type: Electrical | Permit status: Issued | Current use: Commercial | Permit id: 15041-10000-316 | |||||
SCORE 61 Adding a 480v 600a sectionextension to an existing switchrack located Date: October 15, 2015 Contractor: Iqa Solutions Permit type: Electrical | Permit status: Issued | Current use: Commercial | Permit id: 15041-10000-179 | |||||
SCORE 100 Electrical Date: March 18, 2013 Contractor: Roger Permit status: Permit finaled | Current use: Commercial | Permit id: 12041-40001-292 | |||||
SCORE 59 Electrical Date: May 21, 2013 Contractor: Fire And Pump Service Group Permit status: Permit expired | Current use: Special equipment | Permit id: 13041-10000-132 | |||||
SCORE 64 Elevator Date: October 21, 2016 Contractor: Pamela Blondin Permit status: Issued | Current use: Commercial | Permit id: 16046-10001-016 | |||||
SCORE 86 Electrical Date: August 26, 2016 Contractor: California Spectra Instrumentation Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-40001-345 | |||||
SCORE 90 Non-hillside grading permit for cut, backfill, and 95% recompaction fo Permit type: Grading | Permit status: Issued | Current use: Commercial | Permit id: 11030-10000-015 | |||||
SCORE 86 New foundation for support of new switchrack extension for oil refiner Permit type: Nonbldg-new | Permit status: Issued | Current use: Commercial | Permit id: 15020-10000-027 | |||||
SCORE 90 Install 8 new max. 5ft high and max. 29ft long retaining walls for fir Permit type: Nonbldg-new | Permit status: Permit finaled | Current use: Commercial | Permit id: 10020-10000-027 | |||||
SCORE 90 Fire sprinkler Date: January 29, 2014 Contractor: Irwin Industries Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 14043-10000-003 | |||||
SCORE 84 Shelter in classified/hazardous area. Equipement on skid to be tested Date: August 9, 2013 Contractor: John Tryon Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-10000-006 | |||||
SCORE 84 Install one high resistance grounding unit, transformer size at 1288kv Date: February 3, 2016 Contractor: John Tryon Permit type: Electrical | Permit status: Issued | Current use: Commercial | Permit id: 15041-10000-188 | |||||
SCORE 65 Installing a 12 kva, 15kv/480v 3 phase power distribution transforme Date: December 8, 2015 Contractor: Roger Villamil Permit type: Electrical | Permit status: Issued | Current use: Special equipment | Permit id: 15041-10000-316 | |||||
SCORE 95 Construct 5 fnd pad for pipe support/fire spinkler system/water spray Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 13016-10000-045 | |||||
SCORE 70 Replace existing gas/electric a/c unit with new chiler system. Date: December 7, 2015 Contractor: Ryan Maglinao Permit type: Hvac | Permit status: Issued | Current use: Commercial | Permit id: 15044-10000-012 | |||||
SCORE 61 Adding a 480v 600a sectionextension to an existing switchrack located Date: October 15, 2015 Contractor: Iqa Solutions Permit status: Permit expired | Current use: Commercial | Permit id: 15041-10000-179 | |||||
SCORE 66 Alteration of various existing non-building frames for misc. Pipe supp Permit status: Issued | Current use: Commercial | Permit id: 16020-30000-039 | |||||
SCORE 56 Pc for power. Medium voltage. Installing 4 new motors for tesoro refine Date: November 30, 2017 Contractor: Sherjeel Dehda Permit status: Issued | Current use: Commercial | Permit id: 16041-10000-112 | |||||
SCORE 56 Remove (2) existing equipment concrete pads and install (1) new conc Permit status: Issued | Current use: Commercial | Permit id: 17020-10000-032 | |||||
SCORE 100 Date: December 14, 2017 Contractor: Roger Theroux Permit status: Issued | Current use: Special equipment | Permit id: 17041-90000-449 | |||||
SCORE 100 Date: November 12, 2015 Contractor: Roger Theroux Permit status: Permit expired | Current use: Special equipment | Permit id: 15041-90000-380 | |||||
SCORE 66 Two foundation (13 x 8 & 11 x 13) pads for electrical switch racks Permit status: Issued | Current use: Commercial | Permit id: 17020-30000-030 | |||||
SCORE 98 Date: July 30, 2014 Contractor: Lori Brown Permit status: Permit expired | Current use: Special equipment | Permit id: 14041-90000-205 | |||||
SCORE 85 Re-roof with class a or b material weighing less than 6 pounds per sq. Permit status: Issued | Current use: Commercial | Permit id: 15016-30000-130 | |||||
SCORE 100 Date: February 4, 2013 Contractor: Nicholas Permit status: Permit finaled | Current use: Commercial | Permit id: 13043-40000-003 | |||||
SCORE 86 New foundation for support of new switchrack extension for oil refiner Permit status: Issued | Current use: Commercial | Permit id: 15020-10000-027 | |||||
SCORE 59 Construct walkway extension to (e) air cooler platform with added new Permit status: Issued | Current use: Commercial | Permit id: 16026-10000-003 | |||||
SCORE 98 Date: September 9, 2014 Contractor: Steven Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-40000-246 | |||||
SCORE 61 Plan check for power. Addition of (7) lighting fixtures and 1 rec outl Date: May 15, 2015 Contractor: Orlado Medina Sy Permit status: Issued | Current use: Commercial | Permit id: 14041-10000-323 | |||||
SCORE 61 Adding feeder to power switchrack. Plan check for power only. Date: September 22, 2015 Contractor: Orlando Sy Permit status: Issued | Current use: Commercial | Permit id: 15041-10000-108 | |||||
SCORE 67 New equipment pad Permit status: Issued | Current use: Commercial | Permit id: 15020-40000-025 | |||||
SCORE 90 Install 8 new max. 5ft high and max. 29ft long retaining walls for fir Permit status: Permit finaled | Current use: Commercial | Permit id: 10020-10000-027 | |||||
SCORE 98 Date: October 7, 2013 Contractor: Lori Brown Permit status: Permit finaled | Current use: Special equipment | Permit id: 13041-90000-278 | |||||
SCORE 95 Install new 100a 480v service switchrack and related conduit for biosp Date: April 21, 2014 Contractor: Naresh Patel Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-10000-286 | |||||
SCORE 81 Date: March 8, 2013 Contractor: Andrew Perez Permit status: Permit finaled | Current use: Commercial | Permit id: 11043-10000-005 | |||||
SCORE 84 Shelter in classified hazardous area. Equipement on skid to be tested Date: August 9, 2013 Contractor: John Tryon Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-10000-006 | |||||
SCORE 64 Date: October 21, 2016 Contractor: Pamela Blondin Permit status: Permit finaled | Current use: Commercial | Permit id: 16046-10001-016 | |||||
SCORE 56 Replace 2400v motor controller and refeed 2 motors. Pc for power syste Date: October 5, 2017 Contractor: Rick Rossier Permit status: Issued | Current use: Commercial | Permit id: 17041-10000-202 | |||||
SCORE 70 New concrete pad for mechanical equipment and pipe support Permit status: Issued | Current use: Commercial | Permit id: 16020-10000-005 | |||||
SCORE 86 Supplemental to 11030-10000-01948 to transfer contractor of record. Date: September 6, 2013 Contractor: John Vincent Permit status: Permit closed | Current use: Commercial | Permit id: 11030-40001-019 | |||||
SCORE 90 Date: January 29, 2014 Contractor: Irwin Industries Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 14043-10000-003 | |||||
SCORE 95 Construct (2) new electrical equiptment panel supports & (1) conduit Permit status: Issued | Current use: Commercial | Permit id: 13020-10000-024 | |||||
SCORE 84 Install one high resistance grounding unit, transformer size at 1288kv Date: February 3, 2016 Contractor: John Tryon Permit status: Issued | Current use: Commercial | Permit id: 15041-10000-188 | |||||
SCORE 100 Date: July 29, 2014 Contractor: Roger Theroux Permit status: Permit expired | Current use: Special equipment | Permit id: 14041-90000-203 | |||||
SCORE 59 Date: June 7, 2013 Contractor: Fire And Pump Service Group Permit status: Permit expired | Current use: Commercial | Permit id: 13041-10000-150 | |||||
SCORE 61 Relocation of an existing 250hp well pump in a refinery. Non hazardou Date: December 8, 2015 Contractor: Dilip Hinorani Permit status: Issued | Current use: Commercial | Permit id: 15041-10000-316 | |||||
SCORE 100 Date: March 18, 2013 Contractor: Roger Permit status: Permit finaled | Current use: Commercial | Permit id: 12041-40001-292 | |||||
SCORE 61 Replace existing ups system with new (2) 60kva ups and (2) 75 kva tran Date: June 19, 2015 Contractor: Mario Zuniga Permit status: Permit expired | Current use: Commercial | Permit id: 15041-10000-074 | |||||
SCORE 97 Supplemental to permit # 12020-40000-012 to transfer permit to contr Date: August 19, 2013 Contractor: John Permit status: Permit finaled | Current use: Commercial | Permit id: 12020-40001-012 | |||||
SCORE 65 New equipment pad Permit status: Permit finaled | Current use: Commercial | Permit id: 13020-40000-020 | |||||
SCORE 90 Date: March 22, 2016 Contractor: John Klein Permit status: Permit finaled | Current use: Commercial | Permit id: 16042-10000-056 | |||||
SCORE 97 Replace an existing fire pump system in the north plant of tesoro refi Date: March 20, 2013 Contractor: Angelo Permit status: Permit finaled | Current use: Commercial | Permit id: 11041-10000-002 | |||||
SCORE 97 Date: March 5, 2015 Contractor: Ted Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-40000-064 | |||||
SCORE 100 Date: January 26, 2016 Contractor: Roger Theroux Permit status: Issued | Current use: Special equipment | Permit id: 16041-90000-027 | |||||
SCORE 65 Installing a 12 kva, 15kv 480v 3 phase power distribution transforme Date: December 8, 2015 Contractor: Roger Villamil Permit status: Permit finaled | Current use: Special equipment | Permit id: 15041-10000-316 | |||||
SCORE 86 Date: August 26, 2016 Contractor: California Spectra Instrumentation Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-40001-345 | |||||
SCORE 66 Foundation & pipe support for htu-4 unit. Permit status: Issued | Current use: Commercial | Permit id: 16020-30000-027 | |||||
SCORE 90 Non-hillside grading permit for cut, backfill, and 95% recompaction fo Permit status: Issued | Current use: Commercial | Permit id: 11030-10000-015 | |||||
SCORE 99 Date: March 17, 2016 Contractor: Hratch Arezouyan Permit status: Issued | Current use: Commercial | Permit id: 15044-10001-012 | |||||
SCORE 92 New equipment pad and platform. Permit status: Issued | Current use: Commercial | Permit id: 13020-40000-014 | |||||
SCORE 86 Date: June 18, 2013 Contractor: John Vincent Permit status: Permit expired | Current use: Commercial | Permit id: 09043-40003-012 | |||||
SCORE 99 Date: December 15, 2014 Contractor: Jason Permit status: Permit closed | Current use: Commercial | Permit id: 14041-40000-345 | |||||
SCORE 100 Date: April 10, 2013 Contractor: Roger Theroux Permit status: Permit finaled | Current use: Special equipment | Permit id: 13041-90000-091 | |||||
SCORE 86 Approved plans were expired. (original job description:plan check for Date: July 17, 2013 Contractor: John Vincent Permit status: Permit finaled | Current use: Commercial | Permit id: 13043-10000-022 | |||||
SCORE 95 Construct 5 fnd pad for pipe support fire spinkler system water spray Permit status: Issued | Current use: Commercial | Permit id: 13016-10000-045 | |||||
SCORE 59 Construct support structure for elevated vessel Permit status: Issued | Current use: Commercial | Permit id: 16020-10000-025 | |||||
SCORE 70 Replace existing gas electric a c unit with new chiler system. Date: December 7, 2015 Contractor: Ryan Maglinao Permit status: Issued | Current use: Commercial | Permit id: 15044-10000-012 | |||||
SCORE 64 New concrete equipment foundation pad to support v2419 clay filter tan Permit status: Permit finaled | Current use: Commercial | Permit id: 14020-30000-023 | |||||
SCORE 67 Supplemental to 15020-40000-02528 to revise equipment pad to 24. 5 to Permit status: Issued | Current use: Commercial | Permit id: 15020-40001-025 | |||||
SCORE 84 Installation of new steel framed walkway; the frames will be lifted in Permit status: Permit finaled | Current use: Commercial | Permit id: 14026-10000-004 | |||||
SCORE 64 Non-building support to support new heat exchanger Permit status: Permit finaled | Current use: Commercial | Permit id: 14020-30000-013 | |||||
SCORE 92 Foundation for mmc (motor control center) and metering station and sup Permit status: Issued | Current use: Commercial | Permit id: 14020-40000-026 | |||||
SCORE 78 Tsoro refinery pase-5 fire protection (underground piping, fire hydra Date: March 20, 2013 Contractor: Josh Ess Permit status: Permit finaled | Current use: Commercial | Permit id: 10043-10000-027 | |||||
SCORE 61 Plancheck for power. Ugrade main office power distribuition mcc-88. At Date: November 14, 2014 Contractor: Bill Kuhns Permit status: Permit expired | Current use: Commercial | Permit id: 14041-10000-154 | |||||
SCORE 66 Foundation & pipe support for hcu electrical unit & misc. Supports. Permit status: Issued | Current use: Commercial | Permit id: 16020-30000-027 | |||||
SCORE 100 Date: October 8, 2015 Contractor: Roger Theroux Permit status: Issued | Current use: Special equipment | Permit id: 15041-90000-335 |