Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Wellington mhp 21a Date: December 30, 2010 Permit status: Closed | Permit id: 10-05990 | |||||
SCORE 100 Wellington mhp 21a Client: Wellington Mhp 21a | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-05990 | Parcel: 80353 | |||||
SCORE 100 Wellington mhp 21a Client: Wellington Mhp 21a | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-05990 | Parcel: 80353 | |||||
SCORE 95 Wellington mhp 21a Client: Wellington Mhp 21a | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-05990 | Parcel: 80353 | |||||
SCORE 100 Wellington mhp 21a Client: Wellington Mhp 21a | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-05990 | Parcel: 80353 | |||||
October 20, 20 10:10:24 am kneel. Wellington mhp 21a - reference master approval and fees under 09-61 except for me permit. Location: airport rd to wellington mhp; december 22, 20 10:16:44 am jfortner. Premise # redacted phone number0; december 30, 20 12:23: pm kneel. Wellington mhp 21a - reference master approval 09-6160.; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck perm Permit type: Permits - historical | Permit status: Closed | Permit id: 10-05990 | Parcel: 80353 | |||||
Wellington mhp 21a Date: December 30, 2010 Value: $96,734 Permit type: Historical | Permit status: Closed | Permit id: 10-05990 | |||||
SCORE 95 Wellington mhp 21a Client: Wellington Mhp 21a | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-05990 | Parcel: 80353 | |||||
October 20, 20 10:10:24 am kneel. Wellington mhp 21a - reference master approval and fees under 09-61 except for me permit. Location: airport rd to wellington mhp; december 22, 20 10:16:44 am jfortner. Premise # redacted phone number0; december 30, 20 12:23: pm kneel. Wellington mhp 21a - reference master approval 09-6160.; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck perm Date: December 30, 2010 Permit type: Permits - historical | Permit status: Closed | Permit id: 10-05990 | Parcel: 80353 |