Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 T/o exist roof on house and install torch down on flat areas remove exist tile on pitched area,install fiberglass base sheet and reinstall the same tile Applicant: Levin Carolyn | Permit status: Finaled | Completion date: December 27, 2012 | Permit id: 1212140025 | |||||
SCORE 98 T/o exist roof on garage and install torch down on flat area remove exist tile on pitched area,install fiberglass base sheet and reinstall the same tile Applicant: Levin Carolyn | Permit status: Finaled | Completion date: December 27, 2012 | Permit id: 1212140026 | |||||
Replace 2 windows at kitchen,same size and location. Date: December 30, 2013 Value: $500 Applicant: Same As Owner | Permit status: Finaled | Completion date: February 7, 2014 | Permit id: 1312300035 | |||||
SCORE 98 Upgrade electric service to 2 amp. Date: January 2, 2013 Contractor: Doll Electric Service Applicant: Camacho Oscar J | Permit status: Finaled | Completion date: May 10, 2013 | Permit id: 1301020023 | |||||
Rescess electrical box (200amps) Date: May 16, 2014 Applicant: Same As Owner | Permit status: Permisud | Permit id: 1405160021 | |||||
SCORE 100 Copper re-pipe w/12 fix.,replace main water service. Date: September 23, 2003 Contractor: Henrik Plumbing Inc Applicant: Henrik Plumbing | Permit status: Finaled | Completion date: September 25, 2003 | Permit id: 0309230013 |