Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Certificate of occupancy to replace #71017, issued to the incorrect owner. Date: January 23, 2008 Contractor: Target Building Construction Permit type: Administrative permit | Permit status: Completed | Completion date: January 23, 2008 | Permit id: 128167 | |||||
Temporary certificate of occupancy floors 2 through 6 Date: October 26, 2007 Permit type: Administrative permit | Permit status: Completed | Completion date: November 14, 2007 | Permit id: 111881 | |||||
SCORE 100 Amend permit #71017 for two fire rated shaft. Date: October 9, 2007 Contractor: Target Building Construction Client: Mx, Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 26, 2007 | Permit id: 107264 | |||||
SCORE 100 Install one amp, 3-phase line for exterior a c unit in seal tight. In accordance with 2005 nec Date: July 11, 2008 Contractor: Sommerville William Client: Mx, Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: August 6, 2008 | Permit id: 163173 | |||||
Install wall mounted air condition unit and brackett as per plans Date: June 27, 2008 Client: Mx, Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: June 10, 2011 | Permit id: 161471 | |||||
SCORE 100 Remove (2) single gang meter sockets, replace with (2)-three phase meter sockets. Install (1)-175 amp- three phase breaker disconnect. Replace (1) 2 amp disconnect with a 2 amp main breaker panel for a c unit. In accordance with 2005 nec Date: July 11, 2008 Contractor: Sommerville William Client: Mx, Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: August 6, 2008 | Permit id: 163517 | |||||
SCORE 100 Alterations to stair tower Date: October 18, 2007 Contractor: Target Building Construction Client: Mx, Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: October 26, 2007 | Permit id: 102941 | |||||
SCORE 100 Install one amp-three phase line for inside a c unit on 3rd floor. Install line through exising emt conduit. In accordance with 2005 nec Date: July 11, 2008 Contractor: Sommerville William Client: Mx, Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: August 6, 2008 | Permit id: 163977 | |||||
SCORE 100 Temporary permit to replace ten water damaged breakers, (3)pole-1 amp 4 amps. Temp building up on generator for 15 hours. Replace all breakers in basement hall panel, all due to water damage. Price includes 5 kva generator and wire... In accordance with 2005 nec Date: July 9, 2009 Contractor: Sommerville William Client: Mx, Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: September 3, 2010 | Permit id: 198746 | |||||
SCORE 100 Demolition, obsolete fire department connection at the front of building new connection has been installed Date: May 12, 2009 Contractor: Metropolitan Fire Protection Client: Mx, Lp | Permit type: Suppression permit | Permit status: Expired | Completion date: June 5, 2009 | Permit id: 215288 | |||||
SCORE 100 Interior demolition non bearing partitions Date: March 27, 2007 Contractor: Target Building Construction Client: Mx, Lp | Permit type: Demolition permit | Permit status: Completed | Completion date: July 11, 2007 | Permit id: 64850 | |||||
SCORE 100 3 lts, 26 sinks, 18 wc, 18 lavs, 1 urinal Date: May 24, 2007 Contractor: Nagellavin Inc Client: Mx, Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 26, 2007 | Permit id: 68857 | |||||
SCORE 100 Interior renovations for medical offices, as per plans. Date: June 12, 2007 Contractor: Target Building Construction Client: Mx, Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: December 3, 2007 | Permit id: 71017 | |||||
SCORE 65 Run feeders from existing svs to panels on each fl. Except 2nd, which is occupied. Install lts, recepts, & hvac. The existing 16 amp svs will not be changed. The existing fire pump will not be changed. (fire alarm system) (cc dist) Date: June 22, 2007 Contractor: Craig Carilla Client: Mx, Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: June 22, 2007 | Permit id: 83285 | |||||
SCORE 82 Voice data workstation cabling & jacks. Date: July 20, 2007 Contractor: H B Frazer Co Client: Mx, Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: September 25, 2008 | Permit id: 90759 | |||||
SCORE 61 Remove replace hvac ductwork & diffusers as per plans Date: July 30, 2007 Contractor: Indoor Quality Services Inc Client: Mx, Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 3, 2007 | Permit id: 80960 | |||||
SCORE 100 Installation of sprinkler system as per plan Date: July 16, 2007 Contractor: A And S Sprinkler Co Inc Permit type: Suppression permit | Permit status: Completed | Completion date: October 2, 2009 | Permit id: 81858 | |||||
SCORE 100 Demo and remove stucco down to old brick face rewire and install new stucco. Date: June 17, 2009 Contractor: Target Building Construction Permit type: Alteration permit | Permit status: Completed | Completion date: November 19, 2009 | Permit id: 221625 | |||||
SCORE 100 Use change for office space for medical practice Date: May 23, 2007 Contractor: Target Building Construction Permit type: Use permit | Permit status: Completed | Completion date: May 23, 2007 | Permit id: 78357 |