Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Electrical permit Date: June 29, 2012 Client: Newmuis Kyle | Permit status: Expired | Permit id: 414111 | |||||
Plumbing permit Date: June 12, 2012 Client: Newmuis Kyle | Permit status: Completed | Permit id: 410359 | |||||
Zoning permit Date: June 25, 2012 Client: Newmuis Kyle | Permit status: Completed | Permit id: 411103 | |||||
Alteration permit Date: July 27, 2012 Client: Newmuis Kyle | Permit status: Completed | Permit id: 418737 | |||||
Mechanical permit Date: July 23, 2012 Client: Newmuis Kyle | Permit status: Completed | Permit id: 417743 | |||||
Alteration permit Date: July 27, 2012 Client: Newmuis Kyle | Permit status: Completed | Permit id: 418737 | |||||
Plumbing permit Date: June 12, 2012 Client: Newmuis Kyle | Permit status: Completed | Permit id: 410359 | |||||
Mechanical permit Date: July 23, 2012 Client: Newmuis Kyle | Permit status: Completed | Permit id: 417743 | |||||
Zoning permit Date: June 25, 2012 Client: Newmuis Kyle | Permit status: Completed | Permit id: 411103 | |||||
Electrical permit Date: June 29, 2012 Client: Newmuis Kyle | Permit status: Expired | Permit id: 414111 | |||||
SCORE 98 Rough-in 2 1 2 baths and kitchen sink and laundry tub Date: June 12, 2012 Contractor: Richard Bennett Client: Newmuis Kyle | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 22, 2013 | Permit id: 410359 | |||||
Erection of a roof deck located on the second floor rear portion of a single family dwelling with wood staircase from the second floor rear deck to a third floor roof deck as shown on submitted plan. Date: June 25, 2012 Client: Newmuis Kyle | Permit type: Zoning permit | Permit status: Completed | Completion date: June 25, 2012 | Permit id: 411103 | |||||
SCORE 98 Rewire to existing 1 amp panel thru out as per nec 2008 (sfd) Date: June 29, 2012 Contractor: David Bell Client: Newmuis Kyle | Permit type: Electrical permit | Permit status: Expired | Completion date: January 3, 2013 | Permit id: 414111 | |||||
Applicant is for a roof deck located on the 2nd floor rear on the 2nd floor rear portion of the building with wod staircase from the 2nd floor rear deck to another deck on the 3rd floor roof.-sfd Date: July 20, 2012 Client: Newmuis Kyle | Permit type: Alteration permit | Permit status: Completed | Completion date: January 2, 2013 | Permit id: 414970 | |||||
SCORE 91 Install one 3-ton hvac unit (90,0 btu) - sfd Date: July 23, 2012 Contractor: Igor Sourotkine Client: Newmuis Kyle | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 2, 2013 | Permit id: 417743 | |||||
Stucco front, rear and alley way of sfd. Stucco_-_exterior plaster. Installation of these materials shall be in compliance with astmc926 and astmc1063 and the provisions of this code. R703. 6. 1 lath. All lath and lath attachments shall be of corrosion- resistant materials. Expanded metal or woven wire lath shall be attached with 1-1 2-inch-long (38 mm), 11 gage nails having a 7 16-inch (11. 1 mm) head, or 7 8-inch-long (22. 2 mm), 16 gage staples, spaced at no more than 6 inches (152 mm), or as otherwise approved. Contact inspector at district office for wall inspection prior to starting work. Date: July 27, 2012 Client: Newmuis Kyle | Permit type: Alteration permit | Permit status: Completed | Completion date: June 3, 2014 | Permit id: 418737 | |||||
Demo and renovate a single family row home three stories, new flooring, kitchen, bathrooms, repair windows, upgrade electric, repair damaged cement, paint interior and exterior, replace doors interior and exterior - additional permits are required for electrical, plumbing, suppression, ductwork. Stucco exterior walls. 15 square feet of interior alterations - single family dwelling - applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated feb. 2007. Deviations from this standard will result in the revocation of this permit and imposition of further penalties. Licensed contractor to be listed on permit separate permits required for plumbing, electric and hvac. Call inspector at district office at least 24 hours prior to starting work. Date: June 7, 2012 Client: Newmuis Kyle | Permit type: Alteration permit | Permit status: Completed | Completion date: February 4, 2013 | Permit id: 409698 |