Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: December 12, 2013 Client: Marp Pa Llc | Permit status: Expired | Permit id: 510923 | |||||
Electrical permit Date: December 19, 2013 Client: Marp Pa Llc | Permit status: Completed | Permit id: 512054 | |||||
Mechanical permit Date: December 20, 2013 Client: Marp Pa Llc | Permit status: Completed | Permit id: 512327 | |||||
Plumbing permit Date: December 30, 2013 Client: Marp Pa Llc | Permit status: Expired | Permit id: 513185 | |||||
Electrical permit Date: December 19, 2013 Client: Marp Pa Llc | Permit status: Completed | Permit id: 512054 | |||||
Alteration permit Date: December 23, 2013 Client: Marp Pa Llc | Permit status: Completed | Permit id: 512772 | |||||
Plumbing permit Date: December 30, 2013 Client: Marp Pa Llc | Permit status: Completed | Permit id: 513185 | |||||
Mechanical permit Date: December 20, 2013 Client: Marp Pa Llc | Permit status: Completed | Permit id: 512327 | |||||
SCORE 91 3-pcs bath, kitchen sink, pex & water heater (sfd) Date: December 30, 2013 Contractor: Kevin J Wright Client: Marp Pa Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 18, 2017 | Permit id: 513185 | |||||
SCORE 100 Installation of (1) hvac unit (including ductwork accessories). Sfd Date: December 20, 2013 Contractor: Ss Mechanicals Hvac Client: Marp Pa Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: April 18, 2016 | Permit id: 512327 | |||||
SCORE 86 200amp service and rewire with smoke detectors per 2008 nec (sfd) Date: December 19, 2013 Contractor: Linder Electrical And Mechanic Client: Marp Pa Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: April 29, 2015 | Permit id: 512054 | |||||
SCORE 86 Reframe rear bay and stucco finish, replace two window in existing opening Date: December 12, 2013 Contractor: Daren Linder Client: Marp Pa Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: April 18, 2016 | Permit id: 509882 | |||||
SCORE 86 Interior alterations to include drywall throughout, moisture resistant drywall in the bathroom and kitchen, new windows and doors in existing opening. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated january 2011. Deviation from the standard will result in revocation of this permit and imposition of further penalties. Separate permits required for plumbing, electrical and mechanical work Date: December 12, 2013 Contractor: Daren Linder Client: Marp Pa Llc | Permit type: Alteration permit | Permit status: Expired | Completion date: June 28, 2016 | Permit id: 510923 | |||||
SCORE 67 Masonry front wall with veneer - remove existing brick front wall, 4 square feet. Frame new front wall with 2 x 6 studs and plywood sheathing. New framing to be structurally fastened to existing party walls and inspected prior to starting brickwork. Foundation wall to extend to first floor at 8 inch width. Start 4 inch brick veneer at first floor level, install brick ties every 32 inches, vertical and horizontal. Physically tie in every 4 feet at adjoining wall. Windows and door same location. Install capping, flashing and weep holes as per code requirements. Obtain a sidewalk closure report prior to the start of work. Call building inspector for an intial inspection prior to the start of work. Date: December 23, 2013 Contractor: Toshy Construction Client: Marp Pa Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: April 16, 2015 | Permit id: 512772 |