Plumbing permit Date: January 21, 2016 Client: Zhang Chang Lan | Permit status: Completed | Permit id: 656496 | |||||
Alteration permit Date: July 21, 2015 Client: Zhang Chang Lan | Permit status: Completed | Permit id: 612201 | |||||
Mechanical permit Date: February 23, 2016 Client: Zhang Chang Lan | Permit status: Completed | Permit id: 670814 | |||||
Alteration permit Date: February 8, 2016 Client: Zhang Chang Lan | Permit status: Completed | Permit id: 668455 | |||||
Electrical permit Date: November 2, 2015 Client: Zhang Chang Lan | Permit status: Completed | Permit id: 639262 | |||||
Use permit Date: February 12, 2015 Client: Zhang Chang Lan | Permit status: Completed | Permit id: 590432 | |||||
Plumbing permit Date: September 18, 2015 Client: Zhang Chang Lan | Permit status: Completed | Permit id: 639927 | |||||
Plumbing permit Date: September 18, 2015 Client: Zhang Chang Lan | Permit status: Completed | Permit id: 639927 | |||||
Plumbing permit Date: January 21, 2016 Client: Zhang Chang Lan | Permit status: Completed | Permit id: 656496 | |||||
Alteration permit Date: February 8, 2016 Client: Zhang Chang Lan | Permit status: Completed | Permit id: 668455 | |||||
Mechanical permit Date: February 23, 2016 Client: Zhang Chang Lan | Permit status: Completed | Permit id: 670814 | |||||
Electrical permit Date: November 2, 2015 Client: Zhang Chang Lan | Permit status: Completed | Permit id: 639262 | |||||
Alteration permit Date: July 21, 2015 Client: Zhang Chang Lan | Permit status: Completed | Permit id: 612201 | |||||
Use permit Date: February 12, 2015 Client: Zhang Chang Lan | Permit status: Completed | Permit id: 590432 | |||||
SCORE 62 Installation of brick veneer on 1st floor exterior wall Date: February 8, 2016 Contractor: Ming Guang Zheng Client: Zhang Chang Lan | Permit type: Alteration permit | Permit status: Completed | Completion date: May 24, 2016 | Permit id: 668455 | |||||
SCORE 89 Install 60k btu 92% gas fire furnace with a 2. 5 ton a c to the existing duct on 1st fl Date: February 23, 2016 Contractor: Tp Llc Client: Zhang Chang Lan | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 16, 2016 | Permit id: 670814 | |||||
SCORE 93 Infill existing exterior wall door opening with cmu; create new door opening and install pre-cast lintels (entrance to be fully accessible); interior alterations including concrete platform on grade, accessible bathroom, service counter and bench per plans to create self-service laundromat, c o included for change in occupancy with no change in occupancy classification. Separate permits required for all mechanical, electrical and plumbing work. Date: July 21, 2015 Contractor: Hong Da Construction Inc Client: Zhang Chang Lan | Permit type: Alteration permit | Permit status: Completed | Completion date: June 30, 2016 | Permit id: 612201 | |||||
SCORE 97 Interior plumbing alterations on the 1st floor to create a self-service laundramat - note: separate permit required for fuel gas, 1-1 2" backflow prevention containment device and 1-1 2" water distribution piping - the lint interceptor must comply with the minimum requirements of the philadelphia water department industrial waste unit - the installation will comply with the approved plans and the philadelphia plumbing code 2004 Date: January 21, 2016 Contractor: Richard Lawrence Client: Zhang Chang Lan | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 30, 2016 | Permit id: 656496 | |||||
SCORE 100 Upgrading 200a service to 300amp service, install 100a sub panel & 1-2 sub panel, wire laundromat, 13-washer, 7-gas dryer, 12-lights, 8-outlets & 4-switches as per nec 2008 south district Date: November 2, 2015 Contractor: Deng Bing Client: Zhang Chang Lan | Permit type: Electrical permit | Permit status: Completed | Completion date: June 30, 2016 | Permit id: 639262 | |||||
SCORE 97 Install 1 - 1 2" water distribution pipe - pa1# 2015-2593474 - "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: September 18, 2015 Contractor: Richard Lawrence Client: Zhang Chang Lan | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 5, 2015 | Permit id: 639927 | |||||
SCORE 89 Install two 2 ton heat pumps systems with related duct work,one system will be on 2nd fl, one system in the basement Date: March 17, 2016 Contractor: Tp Llc Client: Zhang Chang Lan | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 16, 2016 | Permit id: 676721 |