Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: June 2, 2016 Client: Durant Eve | Permit status: Active | Permit id: 696769 | |||||
Plumbing permit Date: January 14, 2008 Client: Durant Eve | Permit status: Completed | Permit id: 126245 | |||||
Demolition permit Date: September 13, 2016 Client: Durant Eve | Permit status: Active | Permit id: 701689 | |||||
Zoning/use permit Date: September 13, 2016 Client: Durant Eve | Permit status: Completed | Permit id: 701690 | |||||
Permit for the erection of an attached structure ( nte 38 high); roof deck access by a pilot house ; bay windows at 2nd and 3rd floors for a single family household living size and location as shown in the application. Date: August 12, 2016 Client: Durant Eve | Applicant: Landmark Architectural Design | Permit type: Appeal | Permit id: 28552 | |||||
Plumbing permit Date: June 2, 2016 Client: Durant Eve | Permit status: Expired | Permit id: 696769 | |||||
Plumbing permit Date: January 14, 2008 Client: Durant Eve | Permit status: Completed | Permit id: 126245 | |||||
Zoning use permit Date: September 13, 2016 Client: Durant Eve | Permit status: Completed | Permit id: 701690 | |||||
Demolition permit Date: September 13, 2016 Client: Durant Eve | Permit status: Expired | Permit id: 701689 | |||||
Permit for the erection of an attached structure ( nte 38 high); roof deck access by a pilot house ; bay windows at 2nd and 3rd floors for a single family household living size and location as shown in the application. Date: August 12, 2016 Client: Durant Eve | Applicant: Landmark Architectural Design | Permit type: Appeal | Permit status: Continued | Permit id: 28552 | |||||
SCORE 86 Wire one family dwelling as per 2008 nec. Date: August 10, 2017 Contractor: Sigma Electric Group Inc Client: Lily Pemberton Llc | Permit type: Electrical permit | Permit status: Active | Completion date: August 10, 2017 | Permit id: 807309 | |||||
SCORE 100 Install new 1" combo water service and new 5" lat curb trap fai and sewer into house Date: August 14, 2017 Contractor: Cullinan Plumbing And Heating Ll Client: Lily Pemberton Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 25, 2017 | Permit id: 808001 | |||||
SCORE 100 Discontinue and sealing water and sewer 5"lateral-pa1#20161540735-"self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: June 2, 2016 Contractor: Cullinan Plumbing And Heating Ll Client: Lily Pemberton Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 20, 2017 | Permit id: 696769 | |||||
For the complete demolition of an attached two-story structure. Full sidewalk and street closure required as reflected on approved site plan and in accordance with section 3306 of the ibc. Separate street closure permit required prior to start of work. Any deviation will require an amended building permit. 21 day posting period required prior to commencing demolition. Safety zone: 10. 5 ft Date: September 13, 2016 Client: Lily Pemberton Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: May 4, 2017 | Permit id: 701689 | |||||
For the complete demolition of an attached building. Vacant land. Date: September 13, 2016 Client: Lily Pemberton Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: September 13, 2016 | Permit id: 701690 | |||||
For the erection of an attached structure ( nte 38 high); roof deck access by a pilot house ; bay windows at 2nd floor for a single family household living . Size and location as shown in the application. Date: March 2, 2017 Client: Lily Pemberton Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 13, 2017 | Permit id: 708781 | |||||
SCORE 86 Replace water heater Date: January 14, 2008 Contractor: P And L Plumbing Llc Client: Lily Pemberton Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 25, 2008 | Permit id: 126245 | |||||
SCORE 100 For the installation of an automatic sprinkler system with a 1" combined fire & domestic service line for a three (3) story single family dwelling with rooftop structure. System installation in accordance with nfpa 13d. Date: August 4, 2017 Contractor: Shannon Fire Protection Client: Lily Pemberton Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: November 13, 2017 | Permit id: 802094 | |||||
SCORE 92 New construction of a single family dwelling with cellar and roof deck. Date: April 6, 2017 Contractor: Lily Construction Client: Lily Pemberton Llc | Permit type: New construction permit | Permit status: Completed | Completion date: November 13, 2017 | Permit id: 768755 | |||||
SCORE 100 Install drain and water lines for 3 bathrooms kitchen and laundry. 3 toilets 3 vanities 2 bathtub shower 1 stall shower 1 kitchen sink 1 laundry as per the philadelphia 2004 plumbing code. Date: June 13, 2017 Contractor: Cullinan Plumbing And Heating Ll Client: Lily Pemberton Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 13, 2017 | Permit id: 791532 | |||||
SCORE 89 Install (2) hvac systems with ductwork. (sfd) Date: June 23, 2017 Contractor: Alkaun Co Client: Lily Pemberton Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 13, 2017 | Permit id: 794474 | |||||
SCORE 99 Complete wiring of single family dwelling, recptacles, switches, gfcis, lights and 2 amp service as per nec 2008 south district Date: July 6, 2017 Contractor: Fmj Electrical Contracting Inc Client: Lily Pemberton Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: November 13, 2017 | Permit id: 797284 |