Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Revision to building permit b1106467 to show changes to gwu, learning law center. Changes made as per the attached revised dwgs. Including but not limited to lowest parking level, p5 reduced by 31 sq. Ft., p-1 level adm. Office reconfigured, reduction of pavilion length from 68 ft to 43ft. 2in, and height from 23 ft. To 18ft. 3in., deleting the plaza canopy, relocation of plaza roof skylights to new lawn area. One set of the previous approved plans attached as reference. Date: December 20, 2012 Client: G.W. Universtiy | Applicant: G.W. Universtiy; John Giuseppe-Ramco | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1213118 | |||||
Installation of water, sewer, and pepco utilities in public alley 2028 g street, nw. Date: July 12, 2012 Client: George Washington University | Applicant: George Washington University; Erika Fergerson | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200650 | |||||
Installation of water, sewer, and pepco utilities in public alley 2028 g street, n. W. Date: August 7, 2012 Client: George Washington University | Applicant: George Washington University; Erika Fergerson | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200716 | |||||
After hours to hoist material for jobsite sat and sunday 5am to 9pm 4/14/2012 to 4/15/2012 Date: March 29, 2012 Client: George Washington University | Applicant: William Moore | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200320 | |||||
Water main installation Date: October 1, 2012 Client: William B. Hopke | Applicant: William B. Hopke; Erika Fergerson | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300005 | |||||
Phase 1 of 2 phases for gwu law center, phase 1 consisting of grade level entry pavilon below grade lower leve, parking levels, p1,p2,p3,p4 and p5 lower level for classrooms, offices, moot court room seminar rooms as per attached plans, 5 gal fuel oil tank on lower level , 461 total packing spaces being provided. Date: March 26, 2012 Client: George Washington University | Applicant: John Giuseppe | Permit type: New building | Permit status: Permit issued | Permit id: B1106467 | |||||
Install two (2) new g2l 5-4x6-8 with the capacity of 3500lbs Date: December 4, 2012 Client: George Washington | Applicant: Otis Elevator | Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1300373 | |||||
Boiler Date: April 12, 2012 Client: George Washington University | Applicant: David Shapiro | Permit status: Permit issued | Permit id: Fb1200074 | |||||
An after hours permit is respectfully requested from 4am saturday thru 9pm sunday in conjunction with public space permit # pa 10122992 Date: December 5, 2013 Client: Crane Service Company | Applicant: Christine Long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400144 | |||||
Electrical Date: October 25, 2012 Client: George Washington University | Applicant: David C. Williams | Permit status: Permit issued | Permit id: E1300645 | |||||
SCORE 97 Boiler Date: April 12, 2012 Contractor: David Shapiro Client: George Washington University | Permit status: Permit issued | Permit id: Fb1200074 | |||||
SCORE 96 Electrical Date: April 2, 2012 Contractor: Michael F. Dugan Client: George Washington | Permit status: Completed | Permit id: E1204799 | |||||
SCORE 96 Electrical Date: July 18, 2012 Contractor: Francis R Diguiseppe Permit status: Permit issued | Permit id: E1207817 | |||||
Mechanical Date: April 12, 2012 Permit status: Completed | Permit id: M1201502 | |||||
SCORE 96 Plumbing and gas Date: April 18, 2012 Contractor: Daniel M. Narh Client: Gwu | Permit status: Permit issued | Permit id: P1204482 | |||||
SCORE 96 Plumbing and gas Date: June 26, 2012 Contractor: Joe Saffer Permit status: Completed | Permit id: P1206123 | |||||
SCORE 56 Water main installation Date: October 1, 2012 Contractor: William B. Hopke Erika Fergerson Client: William B. Hopke | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300005 | |||||
SCORE 59 Installation of water, sewer, and pepco utilities in public alley 2028 g street, n. W. Date: August 7, 2012 Contractor: George Washington University Erika Fergerson Client: George Washington University | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200716 | |||||
SCORE 59 Installation of water, sewer, and pepco utilities in public alley 2028 g street, nw. Date: July 12, 2012 Contractor: George Washington University Erika Fergerson Client: George Washington University | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200650 | |||||
SCORE 97 Boiler Date: April 12, 2012 Contractor: David Shapiro Client: George Washington University | Permit status: Permit issued | Permit id: Fb1200074 | |||||
Mechanical Date: April 12, 2012 Permit status: Completed | Permit id: M1201502 | |||||
SCORE 56 Revision to building permit b1106467 to show changes to gwu, learning law center. Changes made as per the attached revised dwgs. Including but not limited to lowest parking level, p5 reduced by 31 sq. Ft., p-1 level adm. Office reconfigured, reduction of pavilion length from 68 ft to 43ft. 2in, and height from 23 ft. To 18ft. 3in., deleting the plaza canopy, relocation of plaza roof skylights to new lawn area. One set of the previous approved plans attached as reference. Date: December 20, 2012 Contractor: G.W. Universtiy John Giusepperamco Client: G.W. Universtiy | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1213118 | |||||
SCORE 96 Electrical Date: July 18, 2012 Contractor: Francis R Diguiseppe Permit status: Permit issued | Permit id: E1207817 | |||||
Plumbing and gas Date: April 12, 2012 Permit status: Completed | Permit id: P1204323 | |||||
SCORE 96 Plumbing and gas Date: June 26, 2012 Contractor: Joe Saffer Permit status: Completed | Permit id: P1206123 | |||||
SCORE 96 Plumbing and gas Date: April 18, 2012 Contractor: Daniel M. Narh Client: Gwu | Permit status: Permit issued | Permit id: P1204482 | |||||
SCORE 96 Electrical Date: April 2, 2012 Contractor: Michael F. Dugan Client: George Washington | Permit status: Completed | Permit id: E1204799 | |||||
SCORE 97 Boiler Date: April 12, 2012 Contractor: David Shapiro Client: George Washington University | Permit status: Permit issued | Permit id: Fb1200074 | |||||
SCORE 100 Phase 1 of 2 phases for gwu law center, phase 1 consisting of grade level entry pavilon below grade lower leve, parking levels, p1,p2,p3,p4 and p5 lower level for classrooms, offices, moot court room seminar rooms as per attached plans, 5 gal fuel oil tank on lower level , 461 total packing spaces being provided. Date: March 26, 2012 Contractor: John Giuseppe Client: George Washington University | Permit type: New building | Permit status: Permit issued | Permit id: B1106467 | |||||
SCORE 56 Revision to building permit b1106467 to show changes to gwu, learning law center. Changes made as per the attached revised dwgs. Including but not limited to lowest parking level, p5 reduced by 31 sq. Ft., p-1 level adm. Office reconfigured, reduction of pavilion length from 68 ft to 43ft. 2in, and height from 23 ft. To 18ft. 3in., deleting the plaza canopy, relocation of plaza roof skylights to new lawn area. One set of the previous approved plans attached as reference. Date: December 20, 2012 Contractor: G.W. Universtiy; John Giusepperamco Client: G.W. Universtiy | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1213118 | |||||
SCORE 59 Installation of water, sewer, and pepco utilities in public alley 2028 g street, nw. Date: July 12, 2012 Contractor: George Washington University; Erika Fergerson Client: George Washington University | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200650 | |||||
SCORE 59 Installation of water, sewer, and pepco utilities in public alley 2028 g street, n. W. Date: August 7, 2012 Contractor: George Washington University; Erika Fergerson Client: George Washington University | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200716 | |||||
SCORE 56 Water main installation Date: October 1, 2012 Contractor: William B. Hopke; Erika Fergerson Client: William B. Hopke | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300005 | |||||
SCORE 98 Install two (2) new g2l 5-4x6-8 with the capacity of 3500lbs Date: December 4, 2012 Contractor: Otis Elevator Client: George Washington | Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1300373 | |||||
SCORE 96 Electrical Date: July 18, 2012 Contractor: Francis R Diguiseppe Permit status: Permit issued | Permit id: E1207817 | |||||
SCORE 96 Electrical Date: April 2, 2012 Contractor: Michael F. Dugan Client: George Washington | Permit status: Completed | Permit id: E1204799 | |||||
SCORE 96 Plumbing and gas Date: April 18, 2012 Contractor: Daniel M. Narh Client: Gwu | Permit status: Permit issued | Permit id: P1204482 | |||||
Plumbing and gas Date: April 12, 2012 Permit status: Completed | Permit id: P1204323 | |||||
SCORE 96 Plumbing and gas Date: June 26, 2012 Contractor: Joe Saffer Permit status: Completed | Permit id: P1206123 | |||||
Mechanical Date: April 12, 2012 Permit status: Completed | Permit id: M1201502 | |||||
SCORE 98 After hours to hoist material for jobsite sat and sunday 5am to 9pm 4/14/2012 to 4/15/2012 Date: March 29, 2012 Contractor: William Moore Client: George Washington University | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200320 | |||||
SCORE 96 Electrical Date: October 25, 2012 Contractor: David C. Williams Client: George Washington University | Permit status: Permit issued | Permit id: E1300645 | |||||
SCORE 96 Electrical Date: October 25, 2012 Contractor: David C. Williams Client: George Washington University | Permit status: Permit issued | Permit id: E1300645 | |||||
SCORE 96 Electrical Date: October 25, 2012 Contractor: David C. Williams Client: George Washington University | Permit status: Permit issued | Permit id: E1300645 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilehqeiy2lrtf8shiwjhf54e Date: March 14, 2015 Client: The George Washington Univeristy | Permit type: Electrical | Permit status: Permit issued | Permit id: E52112467 | |||||
SCORE 99 An after hours permit is respectfully requested from 4am saturday thru 9pm sunday in conjunction with public space permit # pa 10122992 Date: December 5, 2013 Contractor: Christine Long Client: Crane Service Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400144 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilehqeiy2lrtf8shiwjhf54e Date: March 14, 2015 Client: The George Washington Univeristy | Permit type: Electrical | Permit status: Permit issued | Permit id: E52112467 |