Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Roof mount residential solar pv for existing sfd and misc elec panel upgrade per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 5, 2013 Contractor: Dennis Epp Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: November 15, 2013 | Permit id: Pds2013-Resalt- | |||||
Roof mount residential solar pv for existing sfd and misc elec panel upgrade per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 5, 2013 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 15, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 82 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: August 3, 2015 Contractor: A Heating Cooling And Electric Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2015-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd and misc elec panel upgrade per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 5, 2013 Contractor: Heritage Solar Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 15, 2013 | Permit id: Pds2013-Resalt- | |||||
Final Date: November 14, 2013 Permit status: Pass | Permit id: Pds2013-Resalt- |