Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit ![]() Permit status: Active | Permit id: 674598 | |||||
Plumbing permit ![]() Permit status: Completed | Permit id: 662062 | |||||
Alteration permit ![]() Permit status: Expired | Permit id: 503198 | |||||
Plumbing permit ![]() Permit status: Active | Permit id: 634747 | |||||
Zoning permit ![]() Permit status: Completed | Permit id: 684236 | |||||
Electrical permit ![]() Permit status: Expired | Permit id: 637399 | |||||
Mechanical permit ![]() Permit status: Active | Permit id: 638225 | |||||
Alteration permit ![]() Permit status: Expired | Permit id: 633069 | |||||
Alteration permit ![]() Permit status: Completed | Permit id: 674598 | |||||
Mechanical permit ![]() Permit status: Completed | Permit id: 638225 | |||||
Alteration permit ![]() Permit status: Expired | Permit id: 633069 | |||||
Plumbing permit ![]() Permit status: Completed | Permit id: 662062 | |||||
Alteration permit ![]() Permit status: Expired | Permit id: 503198 | |||||
Electrical permit ![]() Permit status: Completed | Permit id: 637399 | |||||
Zoning permit ![]() Permit status: Completed | Permit id: 684236 | |||||
Plumbing permit ![]() Permit status: Completed | Permit id: 634747 | |||||
SCORE 100 For the erection of a roof deck accessory to an attached single family dwelling. Size and location as shown on submitted plan. ![]() ![]() Client: Ensign Dale Ensign Amber | Permit type: Zoning permit | Permit status: Completed | Completion date: April 27, 2016 | Permit id: 684236 | |||||
SCORE 88 15 square feet of interior alterations - single family dwelling - applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated feb. 2007. Deviations from this standard will result in the revocation of this permit and imposition of further penalties. Licensed contractor to be listed on permit separate permits required for plumbing, electric and hvac. Call inspector at district office at least 24 hours prior to starting work. The listed general contractor, g&j group llc, has no employees as per notarized letter. All sub-contractors are to be licensed in the city of philadelphia, and listed on permit. A sub-contractors list is to be given to the inspector before any work starts. ![]() ![]() Client: Ensign Dale Ensign Amber | Permit type: Alteration permit | Permit status: Expired | Completion date: February 27, 2015 | Permit id: 503198 | |||||
SCORE 100 Install 3 4 water service from main to house pa20160051138 (sfd)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" ![]() ![]() Client: Ensign Dale Ensign Amber | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 22, 2016 | Permit id: 662062 | |||||
SCORE 100 Interior alteration throughout; rear second story roof deck per submitted plan and submitted engineers report. Separate permits required for electric; plumbing and mechanical. ![]() ![]() Client: Ensign Dale Ensign Amber | Permit type: Alteration permit | Permit status: Completed | Completion date: November 21, 2016 | Permit id: 674598 | |||||
SCORE 84 Ez permit stadard alterations- for alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Work activity includes framing sheetrock painting ceramic floor hardwood floors doors window in existing openings. Post thzis permit post the project information sign ![]() ![]() Client: Ensign Dale Ensign Amber | Permit type: Alteration permit | Permit status: Expired | Completion date: March 15, 2016 | Permit id: 633069 | |||||
SCORE 86 Install outlets, 3 gfci, switches, lights, 3 smokes as per 2008 nec (east district) ![]() ![]() Client: Ensign Dale Ensign Amber | Permit type: Electrical permit | Permit status: Completed | Completion date: November 4, 2016 | Permit id: 637399 | |||||
SCORE 100 Install 72k btu furnace with 90% eff all new duct work with 2 1 2 ton a c ![]() ![]() Client: Ensign Dale Ensign Amber | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 21, 2016 | Permit id: 638225 | |||||
SCORE 100 2 wc,2 lavs,2 tubs and kitchen sink (sfd)the installation will comply with the philadelphia plumbing code 2004 ![]() ![]() Client: Ensign Dale Ensign Amber | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 21, 2016 | Permit id: 634747 |