Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 The installation of a one(1) inch combined servive line for a fire & domestic supply line. Multipurpose residential fire sprinkler system designed in accordance with nfpa 13d. All work shall be accordance with approved plans, hydraulic calculations, and approved building permit. Any deviations will require a separate permit. See ap821237 for approved plan and calculatiion. ![]() ![]() Client: Mrb Investment, Inc. | Permit type: Suppression permit | Permit status: Active | Completion date: November 2, 2017 | Permit id: 823293 | |||||
SCORE 93 Site plan attached to 827839 install water service,curb trap,house drain & fai - pa1#2017-2960417-"self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" ![]() ![]() Client: Mrb Investment, Inc. | Permit type: Plumbing permit | Permit status: Active | Completion date: November 9, 2017 | Permit id: 827842 | |||||
SCORE 94 New 100amp temp service per 2008 nec (construction site) ![]() ![]() Client: Mrb Investment, Inc. | Permit type: Electrical permit | Permit status: Completed | Completion date: November 14, 2017 | Permit id: 826362 | |||||
SCORE 89 The installation of a one(1) inch combined servive line for a fire & domestic supply line. Multipurpose residential fire sprinkler system designed in accordance with nfpa 13d. All work shall be accordance with approved plans, hydraulic calculations, and approved building permit. Any deviations will require a separate permit. See ap#821228 for plans. ![]() ![]() Client: Mrb Investment, Inc. | Permit type: Suppression permit | Permit status: Active | Completion date: November 9, 2017 | Permit id: 825157 | |||||
SCORE 89 The installation of a one(1) inch combined servive line for a fire & domestic supply line. Multipurpose residential fire sprinkler system designed in accordance with nfpa 13d. All work shall be accordance with approved plans, hydraulic calculations, and approved building permit. Any deviations will require a separate permit. ![]() ![]() Client: Mrb Investment, Inc. | Permit type: Suppression permit | Permit status: Active | Completion date: November 9, 2017 | Permit id: 821228 | |||||
For the demolition of existing structure on lot; for the erection of a semi-detached structure on lot (nte 38 high); roof deck accessed by a pilot house ( for stair access only, nte sf area ) for a multi-family household living ( sixteen(16) dwelling units) on hutchinson st side with three(3) bicycle spaces in an accessible route on lot; for the erection of a semidetached structure ( no cellar and roof deck) for a vacant commercial space at first , second and third floor. ( both structures are interconnected). Size and location as shown in the application. ![]() Client: Mrb Investment, Inc. | Permit type: Zoning/use permit | Permit status: Completed | Completion date: February 23, 2017 | Permit id: 759866 | |||||
Construction of three story attached structure containing a total of 16 dwelling units. A two hour fire separation wall shall divide building into eight fire areas, with each area containing two dwellings units per area. Permit to include eight roof decks with access pilot houses containing stairs and landings only. ![]() Client: Mrb Investment, Inc. | Permit type: New construction permit | Permit status: Active | Completion date: October 6, 2017 | Permit id: 757939 | |||||
SCORE 94 New 100amp temp service per 2008 nec (construction site) ![]() ![]() Client: Mrb Investment, Inc. | Permit type: Electrical permit | Permit status: Completed | Completion date: November 14, 2017 | Permit id: 826362 |