Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 71 Remodel of existing office space and warehouse to same use. No added square footage. Includes upgrades to exterior walls, windows, interior finishes, and mechanical and electrical systems. Date: May 9, 2016 Contractor: Living Home Construction Permit status: Inspections | Permit id: Bld2016-01101 | |||||
SCORE 95 New hvac equipment and ductwork Date: June 1, 2016 Contractor: K Lund Mechanical Heating And Air Inc Permit type: Mechanical | Permit status: Inspections | Permit id: Bld2016-05191 | |||||
SCORE 99 Install wiring as shown on plans (bld 2016-01101). Relocate 2 meters from inside building to outside. Increase amps to 3 amps. Date: May 31, 2016 Contractor: Apollo Electric Llc Permit type: Electrical | Permit status: Inspections | Permit id: Bld2016-05122 | |||||
SCORE 100 Addition of 2 bathrooms and a break room Date: May 10, 2016 Contractor: Alldredge And Peters Plumbing And Heating Llc Permit type: Plumbing | Permit status: Inspections | Permit id: Bld2016-04447 | |||||
SCORE 99 Install wiring as shown on plans (bld 2016-01101). Relocate 2 meters from inside building to outside. Increase amps to 3 amps. Date: May 31, 2016 Contractor: Apollo Electric Llc Permit type: Electrical | Permit status: Inspections | Permit id: Bld2016-05122 | |||||
SCORE 71 Remodel of existing office space and warehouse to same use. No added square footage. Includes upgrades to exterior walls, windows, interior finishes, and mechanical and electrical systems. Date: May 9, 2016 Contractor: Living Home Construction Permit status: Inspections | Permit id: Bld2016-01101 | |||||
Requesting an in line addition to accommodate exterior modifications to the front faade of the building at 2019 s. Main street, which is currently located in the front yard setback. Will not be protruding any further into the required front yard. Date: March 22, 2016 Permit type: Planning commission | Permit status: Active | Permit id: Plnpcm2016-0019 |