Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning/use permit Date: October 22, 2015 Client: Fairmount Developers Llc | Permit status: Completed | Permit id: 644089 | |||||
New construction permit Date: July 13, 2016 Client: Fairmount Developers Llc | Permit status: Active | Permit id: 702512 | |||||
Suppression permit Date: October 13, 2016 Client: Fairmount Developers Llc | Permit status: Active | Permit id: 719203 | |||||
Zoning use permit Date: October 22, 2015 Client: Fairmount Developers Llc | Permit status: Completed | Permit id: 644089 | |||||
Electrical permit Date: January 10, 2017 Client: Fairmount Developers Llc | Permit status: Active | Permit id: 748936 | |||||
Mechanical permit Date: January 25, 2017 Client: Fairmount Developers Llc | Permit status: Active | Permit id: 746275 | |||||
Plumbing permit Date: January 27, 2017 Client: Fairmount Developers Llc | Permit status: Active | Permit id: 744030 | |||||
New construction permit Date: July 13, 2016 Client: Fairmount Developers Llc | Permit status: Active | Permit id: 702512 | |||||
SCORE 93 For the installation of a 13r fire supression system for a single family dwelling serviced by a 2 inch fire service line with a back flow preventer assembly. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Fire suppression system to be installed in accordance with nfpa 13r. Date: October 13, 2016 Contractor: Advantage Fire Protection Llc Permit type: Suppression permit | Permit status: Completed | Completion date: October 27, 2017 | Permit id: 719203 | |||||
SCORE 100 This is one of three permits with one set of plans. Install 3 toilet, 3lav, 3tub, 1 kitchen sink, 1 washer, 1 water heater, 5" lateral, 1"water service, house trap, fresh air inlet and house drain-pa1#20163300064-"self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection"the installation will comply with the philadephia plubming code 2004 Date: January 27, 2017 Contractor: Ferko Plumbing Permit type: Plumbing permit | Permit status: Completed | Completion date: October 26, 2017 | Permit id: 744030 | |||||
New construction of a four story attached structure with roof deck and second floor raised deck. Plans approved under permit ap# 664266. Prior to issuance of the certificate of occupancy, fairmount park approval letter (for any required street trees) shall be provided to district inspector. Date: July 13, 2016 Permit type: New construction permit | Permit status: Completed | Completion date: October 27, 2017 | Permit id: 702512 | |||||
SCORE 99 Install (2) hvac systems with ductwork. (sfd) Date: January 25, 2017 Contractor: Airtight Heating And Cooling Inc Permit type: Mechanical permit | Permit status: Completed | Completion date: October 27, 2017 | Permit id: 746275 | |||||
For the erection of an attached structure maximum 38 high and high pilot house (stair access only), roof deck with 42" high railing, 2nd floor rear deck (size and location as shown in the application). For use as a single family dwelling with two (2) interior accessory parking spaces. Refer plans to a p # 644084 Date: October 22, 2015 Permit type: Zoning/use permit | Permit status: Completed | Completion date: October 22, 2015 | Permit id: 644089 | |||||
SCORE 100 Wiring and installing all light fixtures,devices,smoke detetors,gfi outlets,all phone and tv points and 200amp service with grounding per 2008 nec (sfd)cc district Date: January 10, 2017 Contractor: Harte Electrics Permit type: Electrical permit | Permit status: Completed | Completion date: October 26, 2017 | Permit id: 748936 |