Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Removal of existing non conforming ramps and stairs and installation of new hc lift. Installation of one office and one counting room. Installation of fixed store fixtures including 1/2 height hc dressing and 1/2 height dressing cubicles. Install movable store fixtures by tenant. Replace existing light fixtures with new energy compliant fixtures. Incidental adjustment of electrical and mechanical distribution. Date: August 30, 2013 Client: Abdul Sabhan Rehimi | Applicant: Steven Rowland | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1307212 | |||||
Design, fabricate and install two horizontal led internally illuminated light boxes with aluminum frame and plexiglass faces installed to wall. Install two double sided vinyl banners. Date: November 13, 2013 Client: Abdul Rahimi | Applicant: Tanya Hill; None | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1400040 | |||||
Type of elevator: one (1) savaria delta/steel/accessibility inclined platform lift. Date: September 27, 2013 Client: Abdul Sabhan Rehimi | Applicant: Ashley Corporation Of Virginia | Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1302800 | |||||
Electrical Date: September 5, 2013 Client: Abdul Sabhan Rehimi | Applicant: Frederick W. Brokaw | Permit status: Permit issued | Permit id: E1308245 | |||||
SCORE 96 Electrical Date: September 4, 2013 Contractor: Jin Joon Huh Client: Abdul Sabhan Rehimi | Permit status: Permit issued | Permit id: E1308206 | |||||
SCORE 86 Electrical Date: September 5, 2013 Contractor: Frederick W. Brokaw Client: Abdul Sabhan Rehimi | Permit status: Permit issued | Permit id: E1308245 | |||||
SCORE 93 Electrical Date: September 12, 2013 Contractor: Leroy W Cooper Client: Abdul Sabhan Rehimi | Permit status: Permit issued | Permit id: E1308455 | |||||
SCORE 62 Design, fabricate and install two horizontal led internally illuminated light boxes with aluminum frame and plexiglass faces installed to wall. Install two double sided vinyl banners. Date: November 13, 2013 Contractor: Tanya Hill None Client: Abdul Rahimi | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1400040 | |||||
SCORE 96 Electrical Date: September 4, 2013 Contractor: Jin Joon Huh Client: Abdul Sabhan Rehimi | Permit status: Permit issued | Permit id: E1308206 | |||||
SCORE 86 Electrical Date: September 5, 2013 Contractor: Frederick W. Brokaw Client: Abdul Sabhan Rehimi | Permit status: Permit issued | Permit id: E1308245 | |||||
SCORE 93 Electrical Date: September 12, 2013 Contractor: Leroy W Cooper Client: Abdul Sabhan Rehimi | Permit status: Permit issued | Permit id: E1308455 | |||||
SCORE 62 Design, fabricate and install two horizontal led internally illuminated light boxes with aluminum frame and plexiglass faces installed to wall. Install two double sided vinyl banners. Date: November 13, 2013 Contractor: Tanya Hill; None Client: Abdul Rahimi | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1400040 | |||||
SCORE 93 Electrical Date: September 12, 2013 Contractor: Leroy W Cooper Client: Abdul Sabhan Rehimi | Permit status: Permit issued | Permit id: E1308455 | |||||
SCORE 86 Electrical Date: September 5, 2013 Contractor: Frederick W. Brokaw Client: Abdul Sabhan Rehimi | Permit status: Permit issued | Permit id: E1308245 | |||||
SCORE 96 Electrical Date: September 4, 2013 Contractor: Jin Joon Huh Client: Abdul Sabhan Rehimi | Permit status: Permit issued | Permit id: E1308206 | |||||
SCORE 99 Removal of existing non conforming ramps and stairs and installation of new hc lift. Installation of one office and one counting room. Installation of fixed store fixtures including 1/2 height hc dressing and 1/2 height dressing cubicles. Install movable store fixtures by tenant. Replace existing light fixtures with new energy compliant fixtures. Incidental adjustment of electrical and mechanical distribution. Date: August 30, 2013 Contractor: Steven Rowland Client: Abdul Sabhan Rehimi | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1307212 | |||||
SCORE 75 Type of elevator: one (1) savaria delta/steel/accessibility inclined platform lift. Date: September 27, 2013 Contractor: Ashley Corporation Of Virginia Client: Abdul Sabhan Rehimi | Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1302800 |