Building Permits at 2011 Teton Pass St El Cajon Ca 92019


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 2011 Teton Pass St El Cajon Ca 92019 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
29 sq. Ft. Reroof if a re-roof project is proposed, the following specifications apply. Existing roofing material: clay tile proposed roofing material: clay tile manufacturer: boral brand and model: boral clay color (if cool roof required): n a built-up roofing assembly system number per attached listing report (if applicable): esr-1017 specific exemption from cool roof requirements (if applicable): r-38 insulation required building inspector field verification (if applicable): r-38 required cf 2r form
Date:  May 12, 2015

Permit type: Other : 33 - res - m | Permit status: Permit finaled | Completion date: May 15, 2015 | Permit id: Pds2015-Resalt-
2015/05/120952011 Teton Pass St El Cajon Ca 92019
SCORE
92
This project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field.
Date:  April 6, 2015
Contractor: Ashley Harris

Permit type: Mechanical : 8023 - | Permit status: Permit issued | Permit id: Pds2015-Resalt-
2015/04/060922011 Teton Pass St El Cajon Ca 92019Ashley Harris
SCORE
89
The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof.
Date:  May 29, 2014
Contractor: Brian Milholland

Permit type: Electrical : 8002 - | Permit status: Permit issued | Permit id: Pds2014-Resalt-
2014/05/290892011 Teton Pass St El Cajon Ca 92019Brian Milholland
29 sq. Ft. Reroof if a re-roof project is proposed, the following specifications apply. Existing roofing material clay tile proposed roofing material clay tile manufacturer boral brand and model boral clay color (if cool roof required) n/a built-up roofing assembly system number per attached listing report (if applicable) esr-1017 specific exemption from cool roof requirements (if applicable) r-38 insulation required building inspector field verification (if applicable) r-38 required cf 2r form
Date:  May 12, 2015

Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 15, 2015 | Permit id: Pds2015-Resalt-
2015/05/120952011 Teton Pass St El Cajon Ca 92019
SCORE
100
Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field.
Date:  April 6, 2015
Contractor: A S I Hastings Inc

Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2015-Resalt-
2015/04/0601002011 Teton Pass St El Cajon Ca 92019A S I Hastings Inc
SCORE
86
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof.
Date:  October 26, 2015
Contractor: Energy Builders

Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2015-Resalt-
2015/10/260862011 Teton Pass St El Cajon Ca 92019Energy Builders
Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 125a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof.
Date:  May 29, 2014

Permit type: Residential alteration-addn | Permit status: Issued expired | Permit id: Pds2014-Resalt-
2014/05/290952011 Teton Pass St El Cajon Ca 92019
29 sq. Ft. Reroof if a re-roof project is proposed, the following specifications apply. Existing roofing material clay tile proposed roofing material clay tile manufacturer boral brand and model boral clay color (if cool roof required) n a built-up roofing assembly system number per attached listing report (if applicable) esr-1017 specific exemption from cool roof requirements (if applicable) r-38 insulation required building inspector field verification (if applicable) r-38 required cf 2r form
Date:  May 12, 2015

Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 15, 2015 | Permit id: Pds2015-Resalt-
2015/05/120952011 Teton Pass St El Cajon Ca 92019
SCORE
96
Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 125a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof.
Date:  May 29, 2014

Permit type: Residential alteration-addn | Permit status: Issued expired | Permit id: Pds2014-Resalt-
2014/05/290962011 Teton Pass St El Cajon Ca 92019Milholland Electric Inc
SCORE
86
Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 125a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof.
Date:  February 25, 2016
Contractor: Energy Builders

Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 7, 2016 | Permit id: Pds2016-Resalt-
2016/02/250862011 Teton Pass St El Cajon Ca 92019Energy Builders
Final
Date:  March 3, 2016

Permit status: Pass | Permit id: Pds2016-Resalt-
2016/03/030952011 Teton Pass St El Cajon Ca 92019
Final
Date:  May 13, 2015

Permit status: Pass | Permit id: Pds2015-Resalt-
2015/05/130952011 Teton Pass St El Cajon Ca 92019
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.