Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
1098 sqft 1-story sfd and 1768 sqft porches. 2 amp. 2007 fire rebuild, new owner notice to permittee: temp power shall be inspected prior to framing inspection Date: June 26, 2014 Value: $185,731 Permit type: Building : 10 - res | Permit status: Permit issued | Permit id: Pds2014-Respri- | |||||
1098 sqft 1-story sfd and 1768 sqft porches. 2 amp. W/ etop and temp constr sea cargo container 07/06/16 plan change, approve proposed etop indicated on original plot plan. Add proposed container to scope in accela. See "plan change" cofa. -drw 07/06/16 renew permit at 50% - a scheduled construction inspection must be completed within every 1 days from renewal date for permit to remain active thru the approved permit interval. Interval expires on 12/23/2017 -drw notice to permittee temp power shall be inspected prior to framing inspection Date: June 26, 2014 Value: $185,731 Permit type: New primary residential sfd-mh | Permit status: Issued | Permit id: Pds2014-Respri- | |||||
1098 sqft 1-story sfd and 1768 sqft porches. 2 amp. W etop and temp constr sea cargo container 07 06 16 plan change, approve proposed etop indicated on original plot plan. Add proposed container to scope in accela. See "plan change" cofa. -drw 07 06 16 renew permit at 50% - a scheduled construction inspection must be completed within every 1 days from renewal date for permit to remain active thru the approved permit interval. Interval expires on 12 23 2017 -drw notice to permittee temp power shall be inspected prior to framing inspection Date: June 26, 2014 Value: $185,731 Permit type: New primary residential sfd-mh | Permit status: Issued | Permit id: Pds2014-Respri- | |||||
SCORE 93 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 400a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: June 21, 2017 Contractor: Alive Industries Inc Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
1098 sqft 1-story sfd and 1768 sqft porches. 4 amp. W etop and temp constr sea cargo container 7 03 16 plan change, upgrade electircal from 2 to 4 amps, same location ... See c of a for details.. Ly 07 06 16 plan change, approve proposed etop indicated on original plot plan. Add proposed container to scope in accela. See "plan change" cofa. -drw 07 06 16 renew permit at 50% - a scheduled construction inspection must be completed within every 1 days from renewal date for permit to remain active thru the approved permit interval. Interval expires on 12 23 2017 -drw notice to permittee temp power shall be inspected prior to framing inspection Date: June 26, 2014 Value: $185,731 Permit type: Mh | Permit status: Completed | Completion date: September 5, 2017 | Permit id: Pds2014-Respri- | |||||
Fire sprinkler - hydro test Date: December 20, 2016 Permit status: Pass | Permit id: Pds2014-Respri- | |||||
Underground plumbing Date: October 14, 2015 Permit status: Pass | Permit id: Pds2014-Respri- | |||||
Rough frame Date: March 20, 2017 Permit status: Pass | Permit id: Pds2014-Respri- | |||||
Stormwater insp Date: December 31, 2014 Permit status: Monitor | Permit id: Pds2014-Respri- | |||||
Final Date: January 13, 2009 Permit status: Pass | Permit id: Pds2008-1021-20 | |||||
Foundation/steel/holdowns/abs/2nd Date: December 12, 2008 Permit status: Pass | Permit id: Pds2008-1021-20 | |||||
Temporary power/tspb Date: November 14, 2007 Permit status: Pass | Permit id: Pds2007-1005-20 | |||||
Final Date: March 27, 2006 Permit status: Pass | Permit id: Pds2005-1030-20 |