Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Roof mount residential solar pv for existing sfd no. Of modules: 20 no. Of inverters: 1 total system size in kilowatts: 3. 7 kw dc per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 05. 04. 2012: plan change, see conditions of approva;... Lhg 04 30 12 plan change see c of a... Vmd Date: February 28, 2012 Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: May 11, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 79 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 3. 7 kw dc per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 05. 04. 2012 plan change, see conditions of approva;... Lhg 04/30/12 plan change see c of a... Vmd Date: February 28, 2012 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 11, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 95 Existing roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 400a - the scope of work is limited to upgrades of the existing main service panel, relocation of the existing loads, new sub-panels to accomodate solar loads, and relocation of existing panels in compliance with all zoning ordinances only, does not include additional new main service panels. This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 08 16 2017 scope change to match plans with battery backup unit. Span epm Date: August 16, 2017 Contractor: Solarcity Corporation Permit type: Addn | Permit status: Completed | Completion date: September 27, 2017 | Permit id: Pds2017-Resalt- | |||||
Exterior shear Date: September 15, 2005 Permit status: Pass | Permit id: Pds2005-1003-20 | |||||
Final Date: May 8, 2012 Permit status: Pass | Permit id: Pds2012-1031-20 | |||||
Final Date: April 2, 2006 Permit status: Pass | Permit id: Pds2005-1003-20 |