Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Remodel of sfd. New bay window and associated floor joist. ( cantilevered) l. L. Zone; a. H. Date: February 13, 2012 Contractor: New Look Siding Llc Permit status: Closed | Current use: Residential | Permit id: Bld2012-01217 | |||||
The fence is constructed of 25 4x6" pressure treated posts, connected with 12x4x1" horizontal slats with 5 8" gaps between each slat. The posts are concreted 2. 5 ft deep in auger-dug holes that are 12 in in diameter. The rear property line constitutes 95. 3 ft of the entire 138. 185 lineage. The south west corner of the property line, where the fence begins, is constructed of a 4x6 inch post secured to an existing concrete retaining wall and concreted 2. 5 ft into the ground. There are a total of 17 posts along the 95. 3 ft, extending along the rear of the property from south to north, stopping 5 feet before the sidewalk. It meets at a degree angle and continues up the sloped grade, adjacent to the sidewalk, on the north side of our back side yard, extending from west to east. We are on a corner lot. The structure is far more than feet from the intersection of 26th and redondo. The north fence line is 17. 4 ft long and contains 4 4x6 inch posts, also connected by 12x4x1" slats with a 5 8 in Date: September 23, 2016 Permit type: Fencing | Permit status: Inspections | Current use: Residential | Permit id: Bld2016-05409 | |||||
SCORE 100 Date: February 13, 2012 Contractor: Na Permit id: Bld2012-01217 | |||||
SCORE 100 Date: September 23, 2016 Contractor: Na Permit id: Bld2016-05409 |