Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Commercial lateral repair Date: September 18, 2014 Contractor: Mark English Permit type: Sewer connection | Permit status: Complete | Permit id: Swr14-03010 | |||||
SCORE 86 Commercial lateral repair Date: September 18, 2014 Contractor: Mick English Permit type: Sewer connection | Permit status: Complete | Permit id: Swr14-03010 | |||||
Parking improvement- project consists of reconstructing two existing commercial drives and adding ap Date: September 4, 2013 Permit type: Drainage | Permit status: Issued | Permit id: Drn13-01373 | |||||
SCORE 93 Modification/reconstructing two existing commercial drives. Revising the existing concrete curbs at Date: September 4, 2013 Contractor: Joel Fritz Permit type: Driveway | Permit status: Issued | Permit id: Drv13-00553 | |||||
SCORE 72 Modification/reconstructing two existing commercial drives. Revising the existing concrete curbs at Date: September 4, 2013 Contractor: Rick Beaver Permit type: Driveway | Permit status: Issued | Permit id: Drv13-00553 | |||||
SCORE 96 Replace gas furnace condenser and evaporator coil Date: August 1, 2013 Contractor: John Maidlow Permit type: Heating & cooling | Permit status: Issued | Expiration date: February 16, 2014 | Permit id: Htg13-05146 | |||||
SCORE 96 Metes and bounds / add 4 amp 4 volt load center with (1) 1 amp circuit to new equipment / i3s Date: July 29, 2014 Contractor: Curtis Ratliff Permit type: Electrical | Permit status: Issued | Expiration date: January 25, 2015 | Permit id: Ele14-03174 | |||||
SCORE 99 Metes and bounds / add 4 amp 4 volt load center with (1) 1 amp circuit to new equipment / i3s Date: July 29, 2014 Contractor: Michael Taylor Permit type: Electrical | Permit status: Issued | Expiration date: January 25, 2015 | Permit id: Ele14-03174 |