Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Remove existing layers of roofing materials from roof surface down to bare substrate. Installing a 4-ply class "a" fiberglass hot mop built-up system. Date: January 28, 2015 Contractor: Fetters Peter Permit type: Roof | Permit status: Issued | Permit id: B15-0370 | |||||
SCORE 86 Remove existing layers of roofing materials from roof surface down to bare substrate. Installing a 4-ply class "a" fiberglass hot mop built-up system. Permit type: Residential addition-alteration | Permit status: Issued | Current use: Residential | Permit id: B15-0370 | Parcel: 125122010 |