Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 97 Replacement of sliding door in existing opening. Replacement of existing roof membrane and all required fl;ashing. Replacement of 120sq ft of plywood siding with hardie board siding, hardie board to match the existing colour with 7" exposure phhc to review cut sheet of door system and all required flashings. All work shall to be done in accordance with philadelphia historical commissions guidelines Date: September 21, 2016 Contractor: Lang Construction Llc Client: Molinaro Robert | Permit type: Alteration permit | Permit status: Completed | Completion date: November 23, 2016 | Permit id: 723369 | |||||
SCORE 100 Remodel of kitchen all new outlet switches & lighting, remodel of 3rd floor bathroom new outlets switches & lighting as per nec 2008 (sfd) Date: May 30, 2013 Contractor: Tech Electric Services Inc Client: Stetler Brian | Permit type: Electrical permit | Permit status: Expired | Completion date: May 30, 2013 | Permit id: 474316 | |||||
SCORE 100 Removal of cabinets flooring and tops, install new hardwood flooring, new c abinet and granite tops, tile back splash, remove tub, water closet, lavy sink, remove all dry wall, re install 1 2" hardie board and tub walls, install mmr drywall to remaining wall area, install ceramic tile to floor and tub wall areas. Level 1 alteration: shall comply with the provisions of chapter 6 of the international existing building code. To include the removal and replacement or the covering of existing materials, elements, equipment or fixtures using new materials, elements, equipment or fixtures that serve the same purpose. Date: October 18, 2013 Contractor: Tech Electric Services Inc Client: Stetler Brian | Permit type: Alteration permit | Permit status: Expired | Completion date: June 1, 2015 | Permit id: 495821 | |||||
SCORE 89 M permit to remedy violation #376995. Per submitted engineer report to repair wall with cmu Date: April 11, 2017 Contractor: Lev Construction Group Llc Client: Stetler Brian | Permit type: Alteration permit | Permit status: Active | Completion date: November 21, 2017 | Permit id: 766881 | |||||
SCORE 100 Water heater replacement, 1 family dwelling Date: December 28, 2011 Contractor: 1 8 Heaters Inc Client: Molinaro Robert | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 13, 2012 | Permit id: 380791 | |||||
SCORE 94 For the installation of a new exterior accessible ramp to access the structure as shown in approved plans. All work to be performed in accordance with philadelphia historical commissions approval dated 03. 28. 2017. Date: May 5, 2017 Contractor: Trainor Contracting Inc Client: Lee Steven S Kim Mee W | Permit type: Alteration permit | Permit status: Completed | Completion date: November 6, 2017 | Permit id: 770215 | |||||
Plumbing permit Date: December 28, 2011 Client: Molinaro Robert | Permit status: Completed | Permit id: 380791 | |||||
Alteration permit Date: September 21, 2016 Client: Molinaro Robert | Permit status: Completed | Permit id: 723369 | |||||
Electrical permit Date: May 30, 2013 Client: Stetler Brian | Permit status: Expired | Permit id: 474316 | |||||
Alteration permit Date: October 18, 2013 Client: Stetler Brian | Permit status: Expired | Permit id: 495821 |