SCORE 95 All pv system will be re-configured to be a net-metered system. The generation meter will be removed, and the line side grid connection will be transferred to a load side grid connection inside the customers main load center using a 240vac circuit breaker. Date: March 28, 2016 Contractor: Sundance Power Systems Inc Client: Thomas E Reece - Sell-Allnet Meter Swap | Permit type: Res: electrical | Permit status: Finaled | Current use: Residential | Permit id: 16-02704 | Parcel: 207860 | |||||
SCORE 95 Res: electrical Contractor: Sundance Power Systems Inc Permit status: Finaled | Permit id: 16-02704 | Parcel: 207860 | |||||
SCORE 95 Res: electrical Date: March 28, 2016 Contractor: Sundance Power Systems Inc Permit status: Finaled | Permit id: 16-02704 | Parcel: 207860 |