Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 61 Replacement of existing aluminum storefront system and single pane glass with new thermally broken storefront system, double pane electro chromatic glass. ![]() ![]() Permit type: Permit | Permit status: Completed | Completion date: May 27, 2014 | Current use: Commercial | Permit id: Bld2014-02007 | |||||
SCORE 100 1. Demolition existing electrical distribution system in basement mechanical room. 2. Install new distribution panel in the basement mechanical room. 3. Incorporate existing circuit loads into new panel. ![]() ![]() Permit type: Electrical | Permit status: Reviews not require | Completion date: April 4, 2013 | Current use: Commercial | Permit id: Bld2013-01975 | |||||
SCORE 95 Interior non structural demo, stain concrete. ![]() ![]() Permit type: Permit | Permit status: Pass | Completion date: March 15, 2013 | Current use: Commercial | Permit id: Bld2013-01534 | |||||
SCORE 64 Replacement of existing aluminum storefront system and single pane glass with new thermally broken storefront system, double pane electro chromatic glass. ![]() ![]() Permit type: Permit | Permit status: Inspections | Completion date: May 27, 2014 | Current use: Commercial | Permit id: Bld2014-02007 | |||||
SCORE 64 1. Demolition existing electrical distribution system in basement mechanical room. 2. Install new distribution panel in the basement mechanical room. 3. Incorporate existing circuit loads into new panel. ![]() ![]() Permit type: Electrical | Permit status: Inspections | Completion date: April 4, 2013 | Current use: Commercial | Permit id: Bld2013-01975 | |||||
SCORE 64 Interior non structural demo, stain concrete. ![]() Permit type: Permit | Permit status: In progress | Completion date: March 15, 2013 | Current use: Commercial | Permit id: Bld2013-01534 | |||||
SCORE 74 Refinish parking lot and re-strip. Add additional accessible parking stall with vertical signs. Zone - cshbd1 zone, parking lot remodel with new dumpster pad location with enclosure meeting zia. 48. 120, not historic. No change to public way. D. D. A. S. ![]() ![]() Permit type: Permit | Permit status: Pass | Completion date: March 5, 2013 | Current use: Commercial | Permit id: Bld2012-06945 | |||||
SCORE 74 Refinish parking lot and re-strip. Add additional accessible parking stall with vertical signs. Zone - cshbd1 zone, parking lot remodel with new dumpster pad location with enclosure meeting zia. 48. 120, not historic. No change to public way. D. D. A. S. ![]() ![]() Permit type: Parking lot | Permit status: Closed | Completion date: March 5, 2013 | Current use: Commercial | Permit id: Bld2012-06551 | |||||
Re-roof flat roof w/tpo, cshb01, comm/retail mix, re-roof front south bldg j. U. ![]() Permit type: Roofing | Permit status: Pass | Completion date: September 5, 2012 | Current use: Commercial | Permit id: Bld2012-06252 | |||||
SCORE 64 Fixture grand total 4, grand total of fixture untis 9. ![]() ![]() Permit type: Plumbing | Permit status: Closed | Completion date: November 29, 2012 | Current use: Commercial | Permit id: Bld2011-00775 | |||||
Electrical for a remodel. ![]() Permit type: Electrical | Permit status: Pass | Completion date: June 2, 2011 | Current use: Commercial | Permit id: Bld2011-00575 | |||||
SCORE 74 Interior non-structural demolition on first floor. D. D. Zone: cshbd1 zone, work in interior. A. S. ![]() ![]() Permit type: Permit | Permit status: Closed | Completion date: November 29, 2012 | Current use: Commercial | Permit id: Bld2010-08383 | |||||
SCORE 74 Office remodel of 1st floor. Remove walls & door at top of stairs to upper level. G. S. Zone: cshbd1 zone. Office building. K. B. ![]() ![]() Permit type: Permit | Permit status: Closed | Completion date: June 7, 2011 | Current use: Commercial | Permit id: Bld2010-08236 | |||||
SCORE 61 Replacement of existing aluminum storefront system and single pane glass with new thermally broken storefront system, double pane electro chromatic glass. ![]() ![]() Permit status: Inspections | Current use: Commercial | Permit id: Bld2014-02007 | |||||
Electrical for a remodel. ![]() Permit type: Electrical | Permit status: Closed | Completion date: June 2, 2011 | Current use: Commercial | Permit id: Bld2011-00575 | |||||
SCORE 56 Re-roof flat roof w/tpo, cshb01, comm/retail mix, re-roof front south bldg j. U. ![]() Permit type: Roofing | Permit status: Closed | Completion date: September 5, 2012 | Current use: Commercial | Permit id: Bld2012-06252 | |||||
SCORE 96 1 flat sign a. M. ![]() ![]() Permit type: Sign | Permit status: Accepted - standard | Completion date: March 15, 2013 | Current use: Na | Permit id: Bld2013-01541 | |||||
SCORE 64 1 flat sign a. M. ![]() ![]() Permit type: Sign | Permit status: Inspections | Completion date: March 15, 2013 | Permit id: Bld2013-01541 | |||||
SCORE 61 Replacing storefront system in front of main building (west) ![]() ![]() Permit status: Inspections | Current use: Commercial | Permit id: Bld2014-02007 | |||||
SCORE 74 Office remodel of 1st floor. Remove walls & door at top of stairs to upper level. G. S. Zone: cshbd1 zone. Office building. K. B. ![]() ![]() Permit status: Closed | Completion date: June 7, 2011 | Current use: Commercial | Permit id: Bld2010-08236 | |||||
SCORE 74 Interior non-structural demolition on first floor. D. D. Zone: cshbd1 zone, work in interior. A. S. ![]() ![]() Permit status: Closed | Completion date: November 29, 2012 | Current use: Commercial | Permit id: Bld2010-08383 | |||||
SCORE 59 Electrical for a remodel. ![]() ![]() Permit type: Electrical | Permit status: Closed | Completion date: June 2, 2011 | Current use: Commercial | Permit id: Bld2011-00575 | |||||
SCORE 64 Fixture grand total 4, grand total of fixture untis 9. ![]() ![]() Permit type: Plumbing | Permit status: Closed | Completion date: November 29, 2012 | Current use: Commercial | Permit id: Bld2011-00775 | |||||
SCORE 59 Re-roof flat roof w tpo, cshb01, comm retail mix, re-roof front south bldg j. U. ![]() Permit type: Roofing | Permit status: Closed | Completion date: September 5, 2012 | Current use: Commercial | Permit id: Bld2012-06252 | |||||
SCORE 74 Refinish parking lot and re-strip. Add additional accessible parking stall with vertical signs. Zone - cshbd1 zone, parking lot remodel with new dumpster pad location with enclosure meeting zia. 48. 120, not historic. No change to public way. D. D. A. S. ![]() ![]() Permit type: Parking lot | Permit status: Closed | Completion date: March 5, 2013 | Current use: Commercial | Permit id: Bld2012-06551 | |||||
SCORE 74 Refinish parking lot and re-strip. Add additional accessible parking stall with vertical signs. Zone - cshbd1 zone, parking lot remodel with new dumpster pad location with enclosure meeting zia. 48. 120, not historic. No change to public way. D. D. A. S. ![]() ![]() Permit status: Closed | Completion date: March 5, 2013 | Current use: Commercial | Permit id: Bld2012-06945 | |||||
SCORE 64 Interior non structural demo, stain concrete. ![]() Permit status: Inspections | Completion date: March 15, 2013 | Current use: Commercial | Permit id: Bld2013-01534 | |||||
SCORE 64 1. Demolition existing electrical distribution system in basement mechanical room. 2. Install new distribution panel in the basement mechanical room. 3. Incorporate existing circuit loads into new panel. ![]() ![]() Permit type: Electrical | Permit status: Inspections | Completion date: April 4, 2013 | Current use: Commercial | Permit id: Bld2013-01975 | |||||
SCORE 64 Replacement of existing aluminum storefront system and single pane glass with new thermally broken storefront system, double pane electro chromatic glass. ![]() ![]() Permit status: Inspections | Completion date: May 27, 2014 | Current use: Commercial | Permit id: Bld2014-02007 | |||||
SCORE 64 1 flat sign a. M. ![]() ![]() Permit type: Sign | Permit status: Inspections | Completion date: March 15, 2013 | Permit id: Bld2013-01541 |