Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 61 Replacement of existing aluminum storefront system and single pane glass with new thermally broken storefront system, double pane electro chromatic glass. Date: March 30, 2014 Contractor: Etc Sugarhouse Permit type: Permit | Permit status: Completed | Completion date: May 27, 2014 | Current use: Commercial | Permit id: Bld2014-02007 | |||||
SCORE 100 1. Demolition existing electrical distribution system in basement mechanical room. 2. Install new distribution panel in the basement mechanical room. 3. Incorporate existing circuit loads into new panel. Date: April 3, 2013 Contractor: Hunt Electric Permit type: Electrical | Permit status: Reviews not require | Completion date: April 4, 2013 | Current use: Commercial | Permit id: Bld2013-01975 | |||||
SCORE 95 Interior non structural demo, stain concrete. Date: March 15, 2013 Contractor: Hybrid Construction And Development Llc Permit type: Permit | Permit status: Pass | Completion date: March 15, 2013 | Current use: Commercial | Permit id: Bld2013-01534 | |||||
SCORE 64 Replacement of existing aluminum storefront system and single pane glass with new thermally broken storefront system, double pane electro chromatic glass. Date: March 30, 2014 Contractor: Etc Sugarhouseetc Group Window Replacement Permit type: Permit | Permit status: Inspections | Completion date: May 27, 2014 | Current use: Commercial | Permit id: Bld2014-02007 | |||||
SCORE 64 1. Demolition existing electrical distribution system in basement mechanical room. 2. Install new distribution panel in the basement mechanical room. 3. Incorporate existing circuit loads into new panel. Date: April 3, 2013 Contractor: Hunt Electricetc Group Permit type: Electrical | Permit status: Inspections | Completion date: April 4, 2013 | Current use: Commercial | Permit id: Bld2013-01975 | |||||
SCORE 64 Interior non structural demo, stain concrete. Date: March 15, 2013 Permit type: Permit | Permit status: In progress | Completion date: March 15, 2013 | Current use: Commercial | Permit id: Bld2013-01534 | |||||
SCORE 74 Refinish parking lot and re-strip. Add additional accessible parking stall with vertical signs. Zone - cshbd1 zone, parking lot remodel with new dumpster pad location with enclosure meeting zia. 48. 120, not historic. No change to public way. D. D. A. S. Date: September 19, 2012 Contractor: Etc Groupetc Group Parking Lot Permit type: Permit | Permit status: Pass | Completion date: March 5, 2013 | Current use: Commercial | Permit id: Bld2012-06945 | |||||
SCORE 74 Refinish parking lot and re-strip. Add additional accessible parking stall with vertical signs. Zone - cshbd1 zone, parking lot remodel with new dumpster pad location with enclosure meeting zia. 48. 120, not historic. No change to public way. D. D. A. S. Date: August 27, 2012 Contractor: Etc Groupetc Group Parking Lot Permit type: Parking lot | Permit status: Closed | Completion date: March 5, 2013 | Current use: Commercial | Permit id: Bld2012-06551 | |||||
Re-roof flat roof w/tpo, cshb01, comm/retail mix, re-roof front south bldg j. U. Date: August 23, 2012 Permit type: Roofing | Permit status: Pass | Completion date: September 5, 2012 | Current use: Commercial | Permit id: Bld2012-06252 | |||||
SCORE 64 Fixture grand total 4, grand total of fixture untis 9. Date: February 8, 2011 Contractor: Lec Plumbing Incetc Group Permit type: Plumbing | Permit status: Closed | Completion date: November 29, 2012 | Current use: Commercial | Permit id: Bld2011-00775 | |||||
Electrical for a remodel. Date: January 28, 2011 Permit type: Electrical | Permit status: Pass | Completion date: June 2, 2011 | Current use: Commercial | Permit id: Bld2011-00575 | |||||
SCORE 74 Interior non-structural demolition on first floor. D. D. Zone: cshbd1 zone, work in interior. A. S. Date: December 6, 2010 Contractor: Wes Bennett Constructionetc Group Permit type: Permit | Permit status: Closed | Completion date: November 29, 2012 | Current use: Commercial | Permit id: Bld2010-08383 | |||||
SCORE 74 Office remodel of 1st floor. Remove walls & door at top of stairs to upper level. G. S. Zone: cshbd1 zone. Office building. K. B. Date: December 1, 2010 Contractor: Wes Bennett Constructionetc Group Permit type: Permit | Permit status: Closed | Completion date: June 7, 2011 | Current use: Commercial | Permit id: Bld2010-08236 | |||||
SCORE 61 Replacement of existing aluminum storefront system and single pane glass with new thermally broken storefront system, double pane electro chromatic glass. Date: May 27, 2014 Contractor: Etc Group Window Replacementgregory Schlegel Permit status: Inspections | Current use: Commercial | Permit id: Bld2014-02007 | |||||
Electrical for a remodel. Date: January 28, 2011 Permit type: Electrical | Permit status: Closed | Completion date: June 2, 2011 | Current use: Commercial | Permit id: Bld2011-00575 | |||||
SCORE 56 Re-roof flat roof w/tpo, cshb01, comm/retail mix, re-roof front south bldg j. U. Date: August 23, 2012 Permit type: Roofing | Permit status: Closed | Completion date: September 5, 2012 | Current use: Commercial | Permit id: Bld2012-06252 | |||||
SCORE 96 1 flat sign a. M. Date: March 15, 2013 Contractor: Isignz And Awnings Llc Permit type: Sign | Permit status: Accepted - standard | Completion date: March 15, 2013 | Current use: Na | Permit id: Bld2013-01541 | |||||
SCORE 64 1 flat sign a. M. Date: March 15, 2013 Contractor: Isignz And Awnings Llcdetails Permit type: Sign | Permit status: Inspections | Completion date: March 15, 2013 | Permit id: Bld2013-01541 | |||||
SCORE 61 Replacing storefront system in front of main building (west) Date: May 27, 2014 Contractor: Etc Group Window Replacementgregory Schlegel Permit status: Inspections | Current use: Commercial | Permit id: Bld2014-02007 | |||||
SCORE 74 Office remodel of 1st floor. Remove walls & door at top of stairs to upper level. G. S. Zone: cshbd1 zone. Office building. K. B. Date: December 1, 2010 Contractor: Wes Bennett Constructionetc Group Permit status: Closed | Completion date: June 7, 2011 | Current use: Commercial | Permit id: Bld2010-08236 | |||||
SCORE 74 Interior non-structural demolition on first floor. D. D. Zone: cshbd1 zone, work in interior. A. S. Date: December 6, 2010 Contractor: Wes Bennett Constructionetc Group Permit status: Closed | Completion date: November 29, 2012 | Current use: Commercial | Permit id: Bld2010-08383 | |||||
SCORE 59 Electrical for a remodel. Date: January 28, 2011 Contractor: Electricraftsesp Permit type: Electrical | Permit status: Closed | Completion date: June 2, 2011 | Current use: Commercial | Permit id: Bld2011-00575 | |||||
SCORE 64 Fixture grand total 4, grand total of fixture untis 9. Date: February 8, 2011 Contractor: Lec Plumbing Incetc Group Permit type: Plumbing | Permit status: Closed | Completion date: November 29, 2012 | Current use: Commercial | Permit id: Bld2011-00775 | |||||
SCORE 59 Re-roof flat roof w tpo, cshb01, comm retail mix, re-roof front south bldg j. U. Date: August 23, 2012 Permit type: Roofing | Permit status: Closed | Completion date: September 5, 2012 | Current use: Commercial | Permit id: Bld2012-06252 | |||||
SCORE 74 Refinish parking lot and re-strip. Add additional accessible parking stall with vertical signs. Zone - cshbd1 zone, parking lot remodel with new dumpster pad location with enclosure meeting zia. 48. 120, not historic. No change to public way. D. D. A. S. Date: August 27, 2012 Contractor: Etc Groupetc Group Parking Lot Permit type: Parking lot | Permit status: Closed | Completion date: March 5, 2013 | Current use: Commercial | Permit id: Bld2012-06551 | |||||
SCORE 74 Refinish parking lot and re-strip. Add additional accessible parking stall with vertical signs. Zone - cshbd1 zone, parking lot remodel with new dumpster pad location with enclosure meeting zia. 48. 120, not historic. No change to public way. D. D. A. S. Date: September 19, 2012 Contractor: Etc Groupetc Group Parking Lot Permit status: Closed | Completion date: March 5, 2013 | Current use: Commercial | Permit id: Bld2012-06945 | |||||
SCORE 64 Interior non structural demo, stain concrete. Date: March 15, 2013 Permit status: Inspections | Completion date: March 15, 2013 | Current use: Commercial | Permit id: Bld2013-01534 | |||||
SCORE 64 1. Demolition existing electrical distribution system in basement mechanical room. 2. Install new distribution panel in the basement mechanical room. 3. Incorporate existing circuit loads into new panel. Date: April 3, 2013 Contractor: Hunt Electricetc Group Permit type: Electrical | Permit status: Inspections | Completion date: April 4, 2013 | Current use: Commercial | Permit id: Bld2013-01975 | |||||
SCORE 64 Replacement of existing aluminum storefront system and single pane glass with new thermally broken storefront system, double pane electro chromatic glass. Date: March 30, 2014 Contractor: Etc Sugarhouseetc Group Window Replacement Permit status: Inspections | Completion date: May 27, 2014 | Current use: Commercial | Permit id: Bld2014-02007 | |||||
SCORE 64 1 flat sign a. M. Date: March 15, 2013 Contractor: Isignz And Awnings Llcdetails Permit type: Sign | Permit status: Inspections | Completion date: March 15, 2013 | Permit id: Bld2013-01541 |