Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 70 3 steel stairs for parking structure. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 09010-20001-012 | |||||
Electrical Date: November 2, 2010 Permit status: Permit expired | Current use: Commercial | Permit id: 10041-20000-218 | |||||
Electrical Date: March 8, 2012 Permit status: Permit closed | Current use: Special equipment | Permit id: 12041-20000-052 | |||||
SCORE 100 Electrical Date: June 30, 2011 Contractor: Monica Withers Permit status: Permit expired | Current use: Commercial | Permit id: 11041-90000-136 | |||||
SCORE 70 Suppl permit to change of matl from rebars to deform welded wired rei Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 09010-20003-012 | |||||
SCORE 70 (n) site driveway bridge structure this plan check is for structure on Permit type: Nonbldg-new | Permit status: Cofo issued | Current use: Commercial | Permit id: 09020-20000-016 | |||||
SCORE 100 8830" long retaining wall maximum height of 90" supported on piles. Permit type: Nonbldg-new | Permit status: Issued | Current use: Commercial | Permit id: 09020-20000-009 | |||||
SCORE 100 Proposed permeable pavement to be constructed with 5 inches of perviou Permit type: Grading | Permit status: Permit finaled | Current use: Commercial | Permit id: 08030-20001-043 | |||||
SCORE 70 Supplimental to 09010-20000-01265 to incorporate posttensined slab Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 09010-20002-012 | |||||
Temporary shoring for the installation of new retaining wall under pci Date: January 25, 2011 Value: $20,000 Permit type: Nonbldg-new | Permit status: Permit finaled | Current use: Commercial | Permit id: 10020-10000-027 | |||||
SCORE 100 Site preparation and grading for proposed building and parking lot. Cu Permit type: Grading | Permit status: Issued | Current use: Commercial | Permit id: 08030-20000-043 | |||||
SCORE 59 Installation of potable water, waste and medium pressure gas for a chu Date: July 12, 2010 Contractor: Jim Margquez Permit type: Plumbing | Permit status: Issued | Current use: Commercial | Permit id: 09042-10000-006 | |||||
SCORE 56 Plumbing Date: November 3, 2010 Contractor: Sherrill Permit status: Permit finaled | Current use: Commercial | Permit id: 10042-20000-190 | |||||
Electrical Date: June 10, 2011 Permit status: Permit finaled | Current use: Commercial | Permit id: 11041-10000-120 | |||||
SCORE 82 Church sanctuary. Permit type: Bldg-new | Permit status: Permit expired | Current use: Commercial | Permit id: 08010-10000-026 | |||||
SCORE 56 New private fire hydrant (phase 1 parking structure) 8" underground su Date: April 12, 2011 Contractor: Felix Levitas Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 11043-20000-002 | |||||
SCORE 82 Electrical Date: December 2, 2010 Contractor: Jim Marquez Permit status: Permit expired | Current use: Commercial | Permit id: 08041-10000-237 | |||||
SCORE 100 Hvac Date: April 29, 2011 Contractor: Wendy Hernandez Permit status: Permit finaled | Current use: Commercial | Permit id: 11044-20000-047 | |||||
SCORE 70 2 level parking deck (grade + 1 elevated level) this plan check is for Permit type: Bldg-new | Permit status: Cofo issued | Current use: Commercial | Permit id: 09010-20000-012 | |||||
SCORE 59 New hvac system for church. Date: April 27, 2010 Contractor: Jim Margquez Permit type: Hvac | Permit status: Permit expired | Current use: Commercial | Permit id: 08044-10000-107 | |||||
SCORE 82 New 16 a service for a church and feed to a parking structure. Date: October 14, 2010 Contractor: Jim Marquez Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 09041-10000-093 | |||||
SCORE 100 Plumbing Date: March 15, 2011 Contractor: Jeff Riddle Permit status: Permit finaled | Current use: Commercial | Permit id: 11042-90000-043 | |||||
SCORE 66 Use of land for additional parking see comments Permit type: Nonbldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 11026-10000-000 | |||||
SCORE 99 Electrical Date: August 24, 2010 Contractor: Jose Permit status: Permit expired | Current use: Commercial | Permit id: 10041-20000-166 | |||||
SCORE 56 H/c path of travel from new pkg deck to (e) sanctuary (ada plan check Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 11016-20000-096 | |||||
SCORE 100 Plan revisions - new fire door at stairshaft serving praying tower < Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 14010-10004-019 | |||||
Electrical Date: March 10, 2014 Permit status: Permit finaled | Current use: Special equipment | Permit id: 14041-20000-063 | |||||
Electrical Date: June 26, 2013 Permit status: Permit closed | Current use: Commercial | Permit id: 13041-20000-170 | |||||
SCORE 76 Hvac Date: December 15, 2015 Contractor: Ed Heiman Permit status: Issued | Current use: Commercial | Permit id: 15044-20000-132 | |||||
SCORE 99 Electrical Date: February 17, 2016 Contractor: Mark Permit status: Issued | Current use: Commercial | Permit id: 16041-20000-056 | |||||
SCORE 100 Remove and replace asphalt area within the service road to create a tu Permit type: Nonbldg-new | Permit status: Permit finaled | Current use: Commercial | Permit id: 14020-10000-028 | |||||
Site grading for proposed building pad /parking lot (phase ii) constru Date: January 30, 2015 Value: $21,003 Permit type: Grading | Permit status: Issued | Current use: Commercial | Permit id: 14030-10000-062 | |||||
SCORE 100 Supplemental permit for the deffered submittal of steel wall panels Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 14010-10002-019 | |||||
SCORE 68 Install under ground waste system for future connection to building dr Date: September 1, 2015 Contractor: Jason Dansker Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-20000-175 | |||||
SCORE 84 New fire alarm system 1 devices. Date: September 10, 2015 Contractor: Ron Pysher Permit type: Electrical | Permit status: Issued | Current use: Commercial | Permit id: 15041-10000-268 | |||||
Electrical Date: March 23, 2016 Permit status: Issued | Current use: Special equipment | Permit id: 16041-20000-101 | |||||
Proposed site retaining walls for phase (ii) construction. Type "c" c Date: March 1, 2016 Value: $15,000 Permit type: Nonbldg-new | Permit status: Issued | Current use: Commercial | Permit id: 14020-10000-025 | |||||
SCORE 100 Plumbing Date: August 27, 2015 Contractor: Justin Permit status: Issued | Current use: Commercial | Permit id: 15042-10000-173 | |||||
SCORE 86 General hvac and type i hood for a new 1 story + mezzanine worship cen Date: January 5, 2015 Contractor: Courtney Lum Permit type: Hvac | Permit status: Issued | Current use: Commercial | Permit id: 14044-10000-080 | |||||
Electrical Date: March 27, 2015 Permit status: Permit closed | Current use: Commercial | Permit id: 15041-20000-091 | |||||
SCORE 86 Plan check for power and lighting. Total area = 126,234 sq. Ft. Condi Date: January 29, 2015 Contractor: Courtney Lum Permit type: Electrical | Permit status: Issued | Current use: Commercial | Permit id: 14041-10000-171 | |||||
SCORE 85 Electrical Date: December 30, 2014 Contractor: Mike Kiefer Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-10000-358 | |||||
SCORE 100 Garden wall enclosure 7ft high; trash enclosures; fire towers total 12 Permit type: Nonbldg-new | Permit status: Issued | Current use: Commercial | Permit id: 14010-10005-019 | |||||
SCORE 86 New potable water and medium pressure gas system for new worship cent Date: December 8, 2014 Contractor: Courtney Lum Permit type: Plumbing | Permit status: Issued | Current use: Commercial | Permit id: 14042-10000-141 | |||||
SCORE 100 Supplemental permit for the deffered submittal of the pre-engineere Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 14010-10001-019 | |||||
SCORE 68 Supplemental permit for the defferred submittal of the steel stairs Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 14010-10003-019 | |||||
SCORE 86 Plumbing Date: October 27, 2015 Contractor: Courtney Lum Permit status: Issued | Current use: Commercial | Permit id: 14042-20001-141 | |||||
SCORE 100 New 1 story + mezzanine worship center Permit type: Bldg-new | Permit status: Issued | Current use: Commercial | Permit id: 14010-10000-019 | |||||
SCORE 97 Electrical Date: March 20, 2015 Contractor: Mike Permit status: Issued | Current use: Commercial | Permit id: 15041-10000-081 | |||||
SCORE 95 Plumbing Date: May 17, 2016 Contractor: Catherine Permit status: Issued | Current use: Commercial | Permit id: 16042-10000-100 | |||||
SCORE 67 Install new fire sprinkler system for new "shepherd church". (e) 4" fi Date: June 16, 2016 Contractor: Steve Carattini Permit type: Fire sprinkler | Permit status: Issued | Current use: Commercial | Permit id: 15043-10001-030 | |||||
SCORE 79 Revision to previously approved plan: add 18 gas pressure regulators f Date: May 9, 2016 Contractor: Albert Ataian Permit type: Plumbing | Permit status: Issued | Current use: Commercial | Permit id: 14042-10002-141 | |||||
SCORE 59 Installation of one 3 stop hydraulic elevator9dual stage jack). 3-stor Permit type: Elevator | Permit status: Permit finaled | Current use: Commercial | Permit id: 16046-10000-014 | |||||
SCORE 100 Ti: new baptismal basin within church. Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 15047-20000-018 | |||||
SCORE 69 Insatll new vertical wheelchair lift. Date: September 8, 2016 Contractor: Stephnie Porter Permit type: Elevator | Permit status: Permit finaled | Current use: Commercial | Permit id: 16046-10000-014 | |||||
SCORE 95 Electrical Date: December 8, 2016 Contractor: Catherine Permit status: Issued | Current use: Commercial | Permit id: 16041-10001-172 | |||||
SCORE 59 Freestanding trellis (14 x 16) Permit type: Nonbldg-new | Permit status: Issued | Current use: Commercial | Permit id: 16010-10000-046 | |||||
SCORE 67 Proposed site retaining walls for phase (ii) construction. Type "c" c Permit type: Nonbldg-new | Permit status: Issued | Current use: Commercial | Permit id: 14020-10000-025 | |||||
SCORE 67 Site grading for proposed building pad /parking lot (phase ii) constru Permit type: Grading | Permit status: Issued | Current use: Commercial | Permit id: 14030-10000-062 | |||||
SCORE 89 Electrical Date: March 10, 2014 Contractor: Camj Electric Permit status: Permit finaled | Current use: Special equipment | Permit id: 14041-20000-063 | |||||
SCORE 89 Electrical Date: June 26, 2013 Contractor: Camj Electric Permit status: Permit closed | Current use: Commercial | Permit id: 13041-20000-170 | |||||
SCORE 100 New 1 story + mezzanine worship center Permit type: Bldg-new | Permit status: Issued | Current use: Commercial | Permit id: 14010-10000-019 | |||||
SCORE 100 Remove and replace asphalt area within the service road to create a tu Permit type: Nonbldg-new | Permit status: Permit finaled | Current use: Commercial | Permit id: 14020-10000-028 | |||||
SCORE 100 Plan revisions - new fire door at stairshaft serving praying tower < Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 14010-10004-019 | |||||
SCORE 89 Electrical Date: March 27, 2015 Contractor: Camj Electric Permit status: Permit closed | Current use: Commercial | Permit id: 15041-20000-091 | |||||
SCORE 100 Supplemental permit for the deffered submittal of steel wall panels Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 14010-10002-019 | |||||
SCORE 89 Electrical Date: June 30, 2016 Contractor: Camj Electric Permit status: Permit closed | Current use: Special equipment | Permit id: 16041-20000-231 | |||||
SCORE 100 Supplemental permit for the deffered submittal of the pre-engineere Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 14010-10001-019 | |||||
SCORE 67 Add 2 fire hydrants to two existing system (one 8" and one 6" existing Date: July 15, 2015 Contractor: Steve Carattini Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-10000-030 | |||||
SCORE 95 Plan check for power and energy for plance of assembly existing 2 stor Date: February 23, 2017 Contractor: Dennis Sese Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-10000-413 | |||||
SCORE 100 T. I. To add new sprinkler heads Date: August 3, 2017 Contractor: Michele Neumann Permit status: Permit finaled | Current use: Commercial | Permit id: 17043-20000-039 | |||||
SCORE 95 Changes to approved set. All changes clouded with delta 2. New light Date: June 21, 2017 Contractor: Dennis Sese Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-10001-413 | |||||
SCORE 70 Date: May 30, 2017 Contractor: Mark Gujda Permit status: Permit finaled | Current use: Commercial | Permit id: 17041-10000-179 | |||||
SCORE 99 Ti project of existing 2-story building. The scope of work of this pro Date: March 1, 2017 Contractor: Michael Jones Permit status: Permit finaled | Current use: Commercial | Permit id: 16044-10000-134 | |||||
SCORE 100 Date: May 30, 2017 Contractor: Michele Neumann Permit status: Permit finaled | Current use: Commercial | Permit id: 17043-90000-027 | |||||
SCORE 56 Date: May 5, 2017 Contractor: Efren Luu Permit status: Permit finaled | Current use: Commercial | Permit id: 17041-10000-149 | |||||
SCORE 99 Ti project: domestic water and waste & vent systems. Date: March 20, 2017 Contractor: Michael Jones Permit status: Permit finaled | Current use: Commercial | Permit id: 16042-10000-254 | |||||
SCORE 99 Revision to approved plans. Rerouting ducts,adding dampers where requ Date: May 19, 2017 Contractor: Michael Jones Permit status: Permit finaled | Current use: Commercial | Permit id: 16044-10001-134 | |||||
SCORE 76 Date: December 15, 2015 Contractor: Ed Heiman Permit status: Permit finaled | Current use: Commercial | Permit id: 15044-20000-132 | |||||
SCORE 59 Freestanding trellis (14 x 16) Permit status: Cofo issued | Current use: Commercial | Permit id: 16010-10000-046 | |||||
SCORE 86 Date: October 27, 2015 Contractor: Courtney Lum Permit status: Permit finaled | Current use: Commercial | Permit id: 14042-20001-141 | |||||
SCORE 86 Plan check for power and lighting. Total area = 126,234 sq. Ft. Condi Date: January 29, 2015 Contractor: Courtney Lum Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-10000-171 | |||||
SCORE 89 Date: March 27, 2015 Contractor: Camj Electric Permit status: Permit closed | Current use: Commercial | Permit id: 15041-20000-091 | |||||
SCORE 66 Installation of (1) wheelchair lift. Date: August 15, 2017 Contractor: Cathy Hall Permit status: Permit finaled | Current use: Commercial | Permit id: 17046-10000-012 | |||||
SCORE 79 Revision to previously approved plan: add 18 gas pressure regulators f Date: May 9, 2016 Contractor: Albert Ataian Permit status: Permit finaled | Current use: Commercial | Permit id: 14042-10002-141 | |||||
SCORE 100 Onsite illuminated channel letters, wall sign that reads" shepherd chu Permit status: Permit finaled | Current use: Onsite | Permit id: 16048-10000-024 | |||||
SCORE 67 Install new fire sprinkler system for new "shepherd church". (e) 4" fi Date: September 9, 2015 Contractor: Steve Carattini Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-10000-030 | |||||
SCORE 85 Date: December 30, 2014 Contractor: Mike Kiefer Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-10000-358 | |||||
SCORE 95 Date: December 8, 2016 Contractor: Catherine Permit status: Permit finaled | Current use: Commercial | Permit id: 16042-10001-100 | |||||
SCORE 95 Date: May 17, 2016 Contractor: Catherine Permit status: Permit finaled | Current use: Commercial | Permit id: 16042-10000-100 | |||||
SCORE 99 Supplement to permit 16016-30000-27669 to revise floor plan , corrido Permit status: Permit finaled | Current use: Commercial | Permit id: 16016-30002-276 | |||||
SCORE 97 Date: March 20, 2015 Contractor: Mike Permit status: Permit closed | Current use: Commercial | Permit id: 15041-10000-081 | |||||
SCORE 100 One onsite non-illuminated monument sign (120" x 30. 5"). Permit status: Permit finaled | Current use: Onsite | Permit id: 17048-10000-001 | |||||
SCORE 69 Insatll new vertical wheelchair lift. Date: September 8, 2016 Contractor: Stephnie Porter Permit status: Permit finaled | Current use: Commercial | Permit id: 16046-10000-014 | |||||
SCORE 67 Proposed site retaining walls for phase (ii) construction. Type "c" c Permit status: Permit finaled | Current use: Commercial | Permit id: 14020-10000-025 | |||||
SCORE 99 Supplement to permit 16016-30000-27669, revise structural & floor plan Permit status: Permit finaled | Current use: Commercial | Permit id: 16016-20001-276 | |||||
SCORE 100 Plan revisions - new fire door at stairshaft serving praying tower < Permit status: Permit finaled | Current use: Commercial | Permit id: 14010-10004-019 | |||||
SCORE 67 Install new fire sprinkler system for new "shepherd church". (e) 4" fi Date: June 16, 2016 Contractor: Steve Carattini Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-10001-030 | |||||
SCORE 68 Supplemental permit for the defferred submittal of the steel stairs Permit status: Permit finaled | Current use: Commercial | Permit id: 14010-10003-019 | |||||
SCORE 86 New potable water and medium pressure gas system for new worship cent Date: December 8, 2014 Contractor: Courtney Lum Permit status: Permit finaled | Current use: Commercial | Permit id: 14042-10000-141 | |||||
SCORE 89 Date: January 25, 2016 Contractor: Camj Electric Permit status: Permit closed | Current use: Special equipment | Permit id: 16041-20000-026 | |||||
SCORE 89 Date: April 15, 2014 Contractor: Camj Electric Permit status: Permit closed | Current use: Special equipment | Permit id: 14041-20000-098 | |||||
SCORE 86 General hvac and type i hood for a new 1 story + mezzanine worship cen Date: January 5, 2015 Contractor: Courtney Lum Permit status: Permit finaled | Current use: Commercial | Permit id: 14044-10000-080 | |||||
SCORE 89 Date: March 26, 2013 Contractor: Camj Electric Permit status: Permit closed | Current use: Special equipment | Permit id: 13041-20000-077 | |||||
SCORE 99 Interior tenant improvement, & change of use from santuary area to inc Permit status: Issued | Current use: Commercial | Permit id: 16016-30000-276 | |||||
SCORE 100 Ti: new baptismal basin within church. Permit status: Permit finaled | Current use: Commercial | Permit id: 15047-20000-018 | |||||
SCORE 100 Supplemental permit for the deffered submittal of steel wall panels Permit status: Permit finaled | Current use: Commercial | Permit id: 14010-10002-019 | |||||
SCORE 100 Onsite non illuminated wall sign painted that reads " shepherdchurch. C Permit status: Permit finaled | Current use: Onsite | Permit id: 16048-10000-022 | |||||
SCORE 100 (2) new painted exterior wall signs; "shepherdchurch. Com" (71-6" x 6 Permit status: Permit finaled | Current use: Onsite | Permit id: 16048-10000-024 | |||||
SCORE 100 Supplemental permit for the deffered submittal of the pre-engineere Permit status: Permit finaled | Current use: Commercial | Permit id: 14010-10001-019 | |||||
SCORE 56 Re-roof with class a or b roof covering material weighing less than 6 Permit status: Permit finaled | Current use: Commercial | Permit id: 17016-20000-227 | |||||
SCORE 100 Remove and replace asphalt area within the service road to create a tu Permit status: Permit finaled | Current use: Commercial | Permit id: 14020-10000-028 | |||||
SCORE 100 Date: August 27, 2015 Contractor: Justin Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-10000-173 | |||||
SCORE 84 New fire alarm system 1 devices. Date: September 10, 2015 Contractor: Ron Pysher Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-268 | |||||
SCORE 67 Site grading for proposed building pad parking lot (phase ii) constru Permit status: Permit finaled | Current use: Commercial | Permit id: 14030-10000-062 | |||||
SCORE 68 Install under ground waste system for future connection to building dr Date: September 1, 2015 Contractor: Jason Dansker Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-20000-175 | |||||
SCORE 99 Date: February 17, 2016 Contractor: Mark Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-20000-056 | |||||
SCORE 59 Installation of one 3 stop hydraulic elevator9dual stage jack). 3-stor Permit status: Permit finaled | Current use: Commercial | Permit id: 16046-10000-014 | |||||
SCORE 100 New 1 story + mezzanine worship center Permit status: Cofo issued | Current use: Commercial | Permit id: 14010-10000-019 | |||||
SCORE 100 Garden wall enclosure 7ft high; trash enclosures; fire towers total 12 Permit status: Permit finaled | Current use: Commercial | Permit id: 14010-10005-019 |