Content |
---|
SCORE 95 Installation of a flush mount 6. 9 kw photovoltaic system. Array to be parallel to roof plane, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. No structural modifications approved under this permit. Contractor to maintain min. 12inch of space between the ridge and panels parallel to ridge along the length of the ridge and on either side of the ridge. A 30inch min. Pathway must be provided at the edge of the roof, perpendicular to the ridge on one side only. Scope of work to also include reinforcement of exiting roof structure. ![]() ![]() Client: Barry Satlow | Permit type: Building, photovoltaic | Permit status: Cmp | Completion date: December 3, 2015 | Current use: Single family detached dwelling, repair | Permit id: Pmt2015-04264 |
Contractor Rank | Contractor Details | Number of Projects | Avg. Project Cost | Years in Business | Photos |
---|---|---|---|---|---|
SCORE 100 | John Mclaughlin | 6,734 Projects | $132,014 Avg. Project Cost | 10 Years in Business | ![]() |
SCORE 100 | Renewal By Andersen | 2,766 Projects | $7,573 Avg. Project Cost | 12 Years in Business | ![]() |
SCORE 99 | Richard Taylor | 238 Projects | $51,490 Avg. Project Cost | 18 Years in Business | ![]() |
SCORE 99 | Brian Field | 161 Projects | $73,354 Avg. Project Cost | 16 Years in Business | ![]() |
SCORE 99 | John Ryan | 1,271 Projects | $37,669 Avg. Project Cost | 21 Years in Business | ![]() |