Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Provide single fuel drop with prime and start #2 fuel fill tank. Please report any problems immediately to esb fuel unit. (212)863-8781 Date: December 29, 2010 Permit type: Util | Permit id: Eb18645 | |||||
SCORE 89 Fence Date: November 3, 2006 Contractor: Ferry Point Industries Corp Permit type: Equipment | Permit status: Permit issued | Permit id: 20108468201 | |||||
SCORE 89 Full demolition Date: November 3, 2006 Contractor: Ferry Point Industries Corp Permit status: Permit issued | Permit id: 20108468201 | |||||
Entire building & rear/south yard stucco seal all accesses to the 1st story of the building. Total openings = (1) door & (18) window frame Date: February 23, 2012 Permit type: Gc | Permit id: Ec21092 | |||||
SCORE 100 Date: November 3, 2006 Contractor: Cliff Ferrandi Client: Frank Zefi | Client Address: 138 Phillip Place Hawthorne Ny 10532 | Client Phone: (914) 497-9750 | Client Company: Metro Development Group | Permit status: Initial | Permit id: 201084682 | |||||
Entire building & rear south yard stucco seal all accesses to the 1st story of the building. Total openings = (1) door & (18) window frame Date: February 23, 2012 Permit type: Gc | Permit id: Ec21092 | |||||
Con ed provide gas to boiler/hot water heater Date: July 19, 2010 Permit type: Util | Permit id: Eb04665 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater Date: July 20, 2010 Permit type: Util | Permit id: Eb04836 | |||||
(apt. #1) at room east-4: demolish and repair ceiling, approx. 16 sq. Ft. With fire retardant sheetrock. Tape, compound, sand to finish,prime and p Date: July 26, 2010 Permit type: Gc | Permit id: Eb04913 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: July 20, 2010 Permit type: Util | Permit id: Eb04836 | |||||
Con ed provide gas to boiler hot water heater Date: July 19, 2010 Permit type: Util | Permit id: Eb04665 |