Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Permit will not be issued until a solar permit is applied for and approved. Home owner is purchasing a 5. 4kw system that he will be installing on roof. He has submitted roof drawings for necessary permitting. Beacon will be installing conduit, disconnect switches/ meter requirements and signage Date: May 20, 2016 Permit type: Electrical | Permit status: Need info | Permit id: Bld2016-04856 | |||||
SCORE 99 Remove the existing roof extend all eves and gables 12" connect the south side of the roof to the patio roof making it one surface reinforce the beam on the patio and add two new pilars connect the east pilar to the garage wall install a metal shingle on the roof with a ridge vent system apollo ii solar shingles will be installed on the south surface with the new roof permit #bld2016-04856 solar portion is not included in the valuation of the re-roof permit. Date: June 29, 2016 Contractor: Aspen Roofing Permit status: Inspections | Permit id: Bld2016-05226 | |||||
Permit will not be issued until a solar permit is applied for and approved. Home owner is purchasing a 5. 4kw system that he will be installing on roof. He has submitted roof drawings for necessary permitting. Beacon will be installing conduit, disconnect switches meter requirements and signage Date: May 20, 2016 Permit type: Electrical | Permit status: Need info | Permit id: Bld2016-04856 | |||||
SCORE 99 Roof mounted solar Date: July 1, 2016 Contractor: Beacon Engineering And Electric Inc Permit type: Solarpv | Permit status: Inspections | Permit id: Bld2016-06289 |