Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: May 5, 2016 Permit status: Active | Permit id: 681980 | |||||
Zoning/use permit Date: March 29, 2016 Permit status: Completed | Permit id: 529775 | |||||
New construction permit Date: March 29, 2016 Permit status: Active | Permit id: 638995 | |||||
Suppression permit Date: July 25, 2016 Permit status: Active | Permit id: 707806 | |||||
Electrical permit Date: August 2, 2016 Permit status: Active | Permit id: 704028 | |||||
Permit for the erection of an attached structure. Size and location as shown on application. For use as vacant commercial space (use registration permit on the 1st floor) and multi-family household living (three (3) dwelling units) above. No signs on application Date: June 6, 2014 Applicant: Zhen H. Jin, Esq | Permit type: Appeal | Permit status: Granted/prov | Completion date: October 27, 2014 | Permit id: 23018 | |||||
On 11/11/2015, the department of licenses and inspections issued a notice of refusal for applications #638995. Date: January 12, 2016 Applicant: 88 Group Llc | Permit type: Appeal | Permit status: Approved | Completion date: July 25, 2016 | Permit id: 26816 | |||||
Suppression permit Date: July 25, 2016 Permit status: Completed | Permit id: 707806 | |||||
Plumbing permit Date: May 5, 2016 Permit status: Completed | Permit id: 681980 | |||||
Electrical permit Date: August 2, 2016 Permit status: Completed | Permit id: 704028 | |||||
New construction permit Date: March 29, 2016 Permit status: Completed | Permit id: 638995 | |||||
Zoning use permit Date: March 29, 2016 Permit status: Completed | Permit id: 529775 | |||||
Permit for the erection of an attached structure. Size and location as shown on application. For use as vacant commercial space (use registration permit on the 1st floor) and multi-family household living (three (3) dwelling units) above. No signs on application Date: June 6, 2014 Applicant: Zhen H. Jin, Esq | Permit type: Appeal | Permit status: Granted/prov | Completion date: October 27, 2014 | Permit id: 23018 | |||||
On 11 11 2015, the department of licenses and inspections issued a notice of refusal for applications #638995. Date: January 12, 2016 Applicant: 88 Group Llc | Permit type: Appeal | Permit status: Approved | Completion date: July 25, 2016 | Permit id: 26816 | |||||
For the erection of an attached structure. Size and location as shown on application. For use as vacant commercial space (use registration permit on the 1st floor) and multi-family household living (three (3) dwelling units) above. No signs on application. Date: March 29, 2016 Permit type: Zoning/use permit | Permit status: Completed | Completion date: December 9, 2016 | Permit id: 529775 | |||||
SCORE 93 New construction: inerior plumbing for a 4 story building with 3 dwelling units and 1 commercial space on the first floor. The installation will comply with the philadelphia plumbing code 2004 Date: May 5, 2016 Contractor: Oleg Kapkanov Permit type: Plumbing permit | Permit status: Completed | Completion date: December 16, 2016 | Permit id: 681980 | |||||
SCORE 100 Install 1-fire panel, 4-horn, strobes, 1- strobe, 9-horn in apartment, 2- pull station, 1- smoke, tie in panel to sprinkler as per nfpa72 (north district) Date: May 11, 2016 Contractor: B H Holding Company Permit type: Electrical permit | Permit status: Completed | Completion date: December 16, 2016 | Permit id: 684872 | |||||
SCORE 98 For the erection of a four-story attached structure with vacant commercial space on first floor and three (3) dwelling units above. Building shall be fully sprinklered throughout in accordance with nfpa 13 standards (see proviso). Separate permits required for mechanical, electrical, plumbing, and fire suppression systems. Permit to comply with bbs variance and provisos (case no. 26816). Date: March 29, 2016 Contractor: Iac Contractors Inc Permit type: New construction permit | Permit status: Completed | Completion date: December 16, 2016 | Permit id: 638995 | |||||
SCORE 100 Installing 1. 5 water service,curb trap,fai,lateral and main drain (mixed use)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: July 26, 2016 Contractor: Tommys Plumbing Permit type: Plumbing permit | Permit status: Completed | Completion date: December 16, 2016 | Permit id: 710302 | |||||
SCORE 89 Install new fire suppression system with 2" fire service and 2" wilkins 350xl backflow prevention assembly in accordance with nfpa 13 throughout the entire building. All work shall comply with the approved plans. All work shall be performed by a fire suppression contractor licensed by the city of philadelphia. Date: July 25, 2016 Contractor: Aqueduct Fire Protection Permit type: Suppression permit | Permit status: Completed | Completion date: December 16, 2016 | Permit id: 707806 | |||||
SCORE 89 Electrical construction for a new (4)story mixed-use structure (vacant commercial & 3-family) - 4 amp main system new wiring by 2008 nec include outlets switches lights smoke detectors per the approved plans - note: fire alarm and telecom data "by others" (separate permits required) Date: August 2, 2016 Contractor: Affinity Technologies Inc Permit type: Electrical permit | Permit status: Completed | Completion date: December 16, 2016 | Permit id: 704028 |