Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning/use permit ![]() Client: Ngo Hieu | Permit status: Completed | Permit id: 614061 | |||||
Addition permit ![]() Client: Ngo Hieu | Permit status: Active | Permit id: 631971 | |||||
Zoning/use permit ![]() Client: Ngo Hieu | Permit status: Completed | Permit id: 707991 | |||||
Alteration permit ![]() Client: Ngo Hieu | Permit status: Active | Permit id: 707994 | |||||
Zoning use permit ![]() Client: Ngo Hieu | Permit status: Completed | Permit id: 707991 | |||||
Zoning use permit ![]() Client: Ngo Hieu | Permit status: Completed | Permit id: 614061 | |||||
Suppression permit ![]() Client: Ngo Hieu | Permit status: Active | Permit id: 732503 | |||||
Mechanical permit ![]() Client: Ngo Hieu | Permit status: Active | Permit id: 737496 | |||||
Addition permit ![]() Client: Ngo Hieu | Permit status: Active | Permit id: 631971 | |||||
Alteration permit ![]() Client: Ngo Hieu | Permit status: Active | Permit id: 707994 | |||||
Plumbing permit ![]() Client: Ngo Hieu | Permit status: Active | Permit id: 745656 | |||||
SCORE 80 For the erection of a two story addition and pilot house on an existing one story attached structure. Structure for use as a vacant commercial space on the first floor level (separate use permit and c. O required prior to occupancy) with a two family dwelling above. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Separate permits required for mechanical, electrical, plumbing and fire suppression work. ![]() ![]() Client: Ngo Hieu | Permit type: Addition permit | Permit status: Active | Completion date: November 10, 2017 | Permit id: 631971 | |||||
SCORE 93 Interior plumbing construction throughout for a new (2)story addition for use as a (2)family dwelling above a vacant commercial space on the 1st floor - note: vent terminals at the roof deck(s) must comply with section p-1103. 4. 1 of the philadelphia plumbing code 2004 - secondary roof drainage must comply with section 1107 of the 2009 international plumbing code - the flushing mechanism for the water closet in the 1st floor commercial space accessible toilet room must be located on the right-hand side of the toilet tank to comply with section 604. 6 of the icc ansi a117. 1-2009 accessibility code ![]() ![]() Client: Ngo Hieu | Permit type: Plumbing permit | Permit status: Active | Completion date: November 17, 2017 | Permit id: 745656 | |||||
SCORE 100 Install (3) hvac systems with ductwork. (mixed-use) ![]() ![]() Client: Ngo Hieu | Permit type: Mechanical permit | Permit status: Active | Completion date: November 17, 2017 | Permit id: 737496 | |||||
SCORE 89 Install new fire suppression system complying with nfpa 13 in the first floor & basement and nfpa 13r above to include 2" main fire service line and 2" wilkins 350xl backflow prevention assembly as per approved plans. All work shall be performed by a fire suppression contractor licensed by the city of philadelphia. ![]() ![]() Client: Ngo Hieu | Permit type: Suppression permit | Permit status: Active | Completion date: November 17, 2017 | Permit id: 732503 | |||||
SCORE 80 New partitions at second and third floor levels to create addition bathroom within each dwelling unit. Construction of rear decks of pressure treated wood on min. 18" round x 30" deep concrete piers and 42" guard rails per engineers plans. Decks to have a 4-0" projection and be anchored into previously approved wood frame addition with resistance to pull-out. Separate permits required for all mechanical, electrical and plumbing work. ![]() ![]() Client: Ngo Hieu | Permit type: Alteration permit | Permit status: Active | Completion date: November 17, 2017 | Permit id: 707994 | |||||
SCORE 80 Erection of rear decks at the second and third floor levels to serve previously approved dwelling units ![]() ![]() Client: Ngo Hieu | Permit type: Zoning/use permit | Permit status: Completed | Completion date: September 7, 2016 | Permit id: 707991 |