Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Dccr proposes to drill one geotechnical boring (pragi-14a) located in the northbound parking lane of 35th street nw, east of the listed property (1524 35th st nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attache Date: January 26, 2016 Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Cancel/withdrawn | Expiration date: June 30, 2016 | |||||
SCORE 100 Dccr proposes to drill one geotechnical boring (pragi-14a) located in the northbound parking lane of 35th street nw, east of the listed property (1524 35th st nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attache Date: January 26, 2016 Contractor: E2cr Inc Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Cancel/withdrawn | Expiration date: June 30, 2016 | |||||
SCORE 100 Excavation; monitoring well (single) Contractor: E2cr Inc Permit status: 3 | Expiration date: June 30, 2016 | Permit id: 0 | |||||
SCORE 69 Moving truck Contractor: Tyler Tilghman Permit status: Notpaid | Expiration date: July 31, 2016 | Permit id: 0 | |||||
SCORE 69 Moving truck Contractor: Tyler Tilghman Permit status: Not paid | Expiration date: July 31, 2016 | Permit id: 0 | |||||
SCORE 100 Excavation; monitoring well (single) Contractor: E2cr Inc Permit status: 3 | Expiration date: June 30, 2016 | Permit id: 0 | |||||
SCORE 69 Moving truck Contractor: Tyler Tilghman Permit status: Notpaid | Expiration date: July 31, 2016 | Permit id: 0 | |||||
SCORE 59 Moving truck Date: July 27, 2015 Contractor: Colin Geoghegan Permit status: Permit expired | Expiration date: August 2, 2015 | Permit id: Pa10202177 | |||||
SCORE 69 Moving truck Contractor: Tyler Tilghman Permit status: Not paid | Expiration date: July 31, 2016 | Permit id: 0 |