SCORE 84 Intstall s. F. Temporary grand opening banner for open studios. Approved for 9 18 2004 - 10 18 2004. Date: September 9, 2004 Contractor: Fit Properties Llc Client: Building Colorado | Applicant: Fit Properties Llc | Permit type: Sign | Permit status: Cmp | Completion date: July 12, 2007 | Current use: Commercial/reta | |||||
SCORE 95 Fire sprinkler system - 1st floor (820-822) Date: February 13, 2004 Contractor: Wyco Fire Protection Inc Client: Building Colorado | Applicant: Wyco Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: March 24, 2004 | Current use: Commercial/reta | |||||
SCORE 95 Construct new metal awnings in accordance with plans and approved revocable permit. Signs are not included in this permit. Client: Building Colorado | Applicant: Wyatt Construction Company | Permit type: Building | Permit status: N&v | Current use: Office - profes | |||||
SCORE 95 Fire sprinkler system - ste 225 Date: August 12, 2003 Contractor: Wyco Fire Protection Inc Client: Building Colorado | Applicant: Wyco Fire Protection Inc | Permit type: Fire | Permit status: N&v | Current use: Office - profes | |||||
SCORE 98 Fire alarm system - elevator upgrade Date: February 25, 2003 Contractor: Riviera Electric Llc Client: Building Colorado | Applicant: Riviera Electric, Llc | Permit type: Fire | Permit status: Cmp | Current use: Office - profes | |||||
SCORE 89 Electrical permit to connect existing power supplies to new elevator equipment for suite 615. Date: February 12, 2003 Contractor: Encompass Electrical Tech Client: Building Colorado | Applicant: Encompass Electrical Tech. | Permit type: Electrical | Permit status: N&v | Current use: Office - profes | |||||
SCORE 95 Change elevator control system in two existing passenger elevators. Signal fixture, governors, and unit door operator. Existing building has 8 stories. Date: October 14, 2002 Contractor: Thyssenkrupp Elevator Client: Building Colorado | Applicant: Thyssenkrupp Elevator | Permit type: Elevator | Permit status: Cmp | Completion date: July 19, 2005 | Current use: Office - profes | |||||
SCORE 95 Reroof upper middle section of roof. Move ballast, install new 60mil epdm, move balast back. Roof will have 2 layers total. 26 squares to be installed. Date: June 6, 2001 Contractor: Black Roofing Inc Client: Building Colorado | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: June 12, 2001 | Current use: Commercial/reta | |||||
SCORE 86 Repair damaged conduit Date: July 16, 2003 Contractor: Utilx Corporation Client: Building Colorado | Applicant: Utilx Corporation | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 91 Adding battery backup cabinet and relocate an existing power cabinet to the lower level. Client: Colorado Building Group | Applicant: Spectrum Const. Contracting | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 4, 2001 | Current use: Office - admini | |||||
SCORE 56 Temp tent for festival on 8-5-00 Client: Building Colorado | Applicant: Building Colorado | Permit type: Temporary event | Permit status: N&v | Current use: Shed, new | |||||
SCORE 95 Fire spinkler system tenant finish Date: March 22, 2000 Contractor: Diamond Fire Protecton Co Inc Client: Building Colorado | Applicant: Diamond Fire Protecton Co Inc | Permit type: Fire | Permit status: Cmp | Completion date: May 26, 2000 | Current use: Office - admini | |||||
SCORE 56 Tenant remodel suite 300. No structural or plumbing changes. 1345 sf Client: Wittemyer John | Applicant: Aurora Building Company, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 24, 2007 | Current use: Office - profes | |||||
SCORE 93 Tenant remodel of office space to reconfigure interior non-structural walls. Client: Street 1919.0 | Applicant: Layne Mitchell | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 1, 2007 | Current use: Office - profes | |||||
SCORE 100 Scope of work letter add and relocate 6 sprinkler of new tennant Date: October 31, 2007 Contractor: Fire Defense Inc Client: Street 1919.0 | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: December 14, 2007 | Current use: Office - profes | |||||
SCORE 56 Removal of two existing antennas on structure, installation of two replacement antennas -- same dimensions, same location -- replacement antennas to be painted to match existing. Installatioon of one fiber optic rack & fiber optic cabinet in interior room -- install 2 (two) 4inch conduit runs from 1st floor to 7th floor. No electrical work allowed under the scope of this permit. Client: Street 1919.0 | Applicant: Tyler Nicholls | Permit type: Building | Permit status: Cmp | Completion date: January 21, 2010 | Current use: Telecommunicati | |||||
SCORE 95 Replacement rooftop unit (200-ton cooling tower). Replacement to be a direct swap-out, same size, same location. Date: February 5, 2009 Contractor: Control Service Center Inc Client: Street 1919.0 | Applicant: Control Service Center Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: July 20, 2009 | Current use: Commercial/reta | |||||
SCORE 95 Remodel of suite #211 to remove interior, non-bearing partition walls. Client: Street 1919.0 | Applicant: Rincon Development, Inc. | Permit type: Building | Permit status: Cmp | Completion date: January 8, 2015 | Current use: Office - profes | |||||
SCORE 100 Scope of work letter suite 609 Date: May 22, 2009 Contractor: Freedom Fire Protection Llc Client: Street 1919.0 | Applicant: Freedom Fire Protection, Llc | Permit type: Fire | Permit status: Iss | Current use: Office - profes | |||||
SCORE 95 Total tear-off & reroof of an office building -- squares on a 1 4inch per foot slope mil epdm ballasted roof. Includes installation of tapered isocyanurate and 1 2inch high density board. Date: September 24, 2009 Contractor: Superior Roofing Inc Client: Street 1919.0 | Applicant: Superior Roofing, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: December 6, 2013 | Current use: Office - admini | |||||
SCORE 95 Demo permit - for interior non-structural demo of partition walls. Includes removal of one bathroom, one kitchen sink, two hand sinks, and a drinking fountain. Date: February 19, 2010 Contractor: Rincon Development Inc Client: Street 1919.0 | Applicant: Rincon Development, Inc. | Permit type: Demolition | Permit status: Cmp | Completion date: October 12, 2012 | Current use: Office - profes | |||||
SCORE 95 Tenant remodel of 4,794 square foot tentant space, for professional office. Client: Street 1919.0 | Applicant: Rincon Development, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 13, 2010 | Current use: Office - profes | |||||
SCORE 100 Tennant finish sprinkler for navigant Date: March 26, 2010 Contractor: Flow Fire Protection Inc Client: Street 1919.0 | Applicant: Flow Fire Protection, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: October 13, 2010 | Current use: Office - profes | |||||
SCORE 100 New backflow preventor Date: March 31, 2010 Contractor: Safety Systems Llc Client: Street 1919.0 | Applicant: Safety Systems, Llc | Permit type: Fire | Permit status: Iss | Current use: Office - profes | |||||
SCORE 98 Tenant expansion of 591 sf to the current suite for guaranty bank -- modification to lobby area & ada counter, reconfiguration of office walls, create new conference room & an office. Client: Street 1919.0 | Applicant: Alex Cassidy | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 14, 2010 | Current use: Financial insti | |||||
SCORE 56 Installation of clearwire cellular telecommunications facility per adr2010-00144 Client: Street 1919.0 | Applicant: Derik Pedersen | Permit type: Building, electrical | Permit status: N&v | Current use: Telecommunicati | |||||
SCORE 95 Tenant remodel in suite 803 including removal of non-bearing walls, remove and replace sink and base, update hardware and finishes. Client: Street 1919.0 | Applicant: Rincon Development, Inc. | Permit type: Building, electrical | Permit status: N&v | Current use: Office - techni | |||||
SCORE 98 Remodel in suite 1 including demising wall soffit installation, minor ceiling changes associated trim. No mechanical, electrical or plumbing. Client: Street 1919.0 | Applicant: Alex Cassidy | Permit type: Building | Permit status: Cmp | Completion date: January 30, 2012 | Current use: Tenant remodel | |||||
SCORE 100 Tennant finish sprinkler reverting system back to core and shell protection Date: May 11, 2011 Contractor: Flow Fire Protection Inc Client: Street 1919.0 | Applicant: Flow Fire Protection, Inc | Permit type: Fire | Permit status: Iss | Current use: Office - profes | |||||
SCORE 95 Interior non-structural demolition of unit to open up space for future leasing. No proposed use at this time, not approved for occupancy. Date: August 23, 2011 Contractor: Rincon Development Inc Client: Street 1919.0 | Applicant: Rincon Development, Inc. | Permit type: Demolition | Permit status: Cmp | Completion date: January 8, 2015 | Current use: Amusement/recre | |||||
SCORE 95 Set a dumster for days on 14th n of walnut in paid parking spaces. Date: October 7, 2011 Contractor: Rincon Development Inc Client: Street 1919.0 | Applicant: Rincon Development, Inc. | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Installation of two replacement low-pressure boilers -- 850,0 btu each, 92% efficiency. Date: December 7, 2011 Contractor: Control Service Center Inc Client: Street 1919.0 | Applicant: Control Service Center Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 2, 2012 | Current use: Office - admini | |||||
SCORE 98 Suite # -- tenant remodel of basement level -- 9,6 sf to create offices, accessible restrooms and shower area. Includes associated electrical, mechanical (new vav boxes, controls, convert current ahu to a variable frequency motor) and plumbing. Elevator being installed under separate state permit cp11-002139. Client: Street 1919.0 | Applicant: Alex Cassidy | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 3, 2014 | Current use: Office - admini | |||||
SCORE 95 Interior non-structural demolition to remove glass ceiling elements and associated frame in atrium space off walnut. Date: May 14, 2012 Contractor: Rincon Development Inc Client: Street 1919.0 | Applicant: Rincon Development, Inc. | Permit type: Demolition | Permit status: Cmp | Completion date: January 8, 2015 | Current use: Existing | |||||
SCORE 95 Remodel of existing atrium and addition of a new smoke evacuation system in the colorado building. 117 square feet of level one to be removed. New fire alarm panel and smoke evacuation sub-panel to be permitted seperately. 9 20 12 revisions include removing 752 square feet of floor area, while adding only 672 square feet, no floor area expansion requested. Client: Street 1919.0 | Applicant: Rincon Development, Inc. | Permit type: Building, electrical | Permit status: Iss | Current use: Office - profes | |||||
SCORE 100 Tenant remodel of suite 1 for newton running co. Offices including installation of interior, non-bearing walls for offices and conference room, reception area, and employee break area. Includes assoicated electrical, mechanical and plumbing, no new fixures (relocate only). Client: Street 1919.0 | Applicant: Wyatt Construction Co, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Office - profes | |||||
SCORE 100 Tennant finish sprinkler for newton running Date: July 11, 2012 Contractor: Flow Fire Protection Inc Client: Street 1919.0 | Applicant: Flow Fire Protection, Inc | Permit type: Fire | Permit status: Iss | Current use: Office - profes | |||||
SCORE 98 Remodel permit to reconfiguration of south stair tower exit and installation of new exterior exit door. No new floor area proposed, only reconfiguration of existing. Scope of work includes associated electrical work. Client: Street 1919.0 | Applicant: Alex Cassidy | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 11, 2014 | Current use: Office - profes | |||||
SCORE 95 Interior component demolition to remove inchbird-houseinch area on second floor, and associated spiral stair case. Date: August 24, 2012 Contractor: Rincon Development Inc Client: Street 1919.0 | Applicant: Rincon Development, Inc. | Permit type: Demolition | Permit status: Cmp | Completion date: October 12, 2012 | Current use: Office - profes | |||||
SCORE 97 Interior non-structural demolition in preparation for future tenant remodel. Date: September 5, 2012 Contractor: Lvi Environmental Services Inc Client: Street 1919.0 | Applicant: Lvi Environmental Services Inc | Permit type: Demolition | Permit status: Cmp | Completion date: October 12, 2012 | Current use: Office - profes | |||||
SCORE 95 Revise structure at front exterior entry at suite 1 including demo and replacement of lid and storefront at se corner entry along with minor structural updates. Includes associated electrical and mechanical. Client: Street 1919.0 | Applicant: Rincon Development, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 13, 2013 | Current use: Alteration | |||||
SCORE 98 Fa - new system. Basement through third only. Date: November 5, 2012 Contractor: Carlton Electric Inc Client: Street 1919.0 | Applicant: Carlton Electric , Inc. | Permit type: Fire | Permit status: Cmp | Completion date: September 10, 2013 | Current use: Office - admini | |||||
SCORE 100 Interior tenant remodel of 11,112 square feet for offices and business headquarters of inchaurora organic dairyinch. Mep as deferred submittal. Client: Street 1919.0 | Applicant: A & B Builders, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 18, 2013 | Current use: Office - profes | |||||
SCORE 95 Interior non-structural demolition in preparation for tenant remodel associated with pmt2012-05350. Date: November 5, 2012 Contractor: Rincon Development Inc Client: Street 1919.0 | Applicant: Rincon Development, Inc. | Permit type: Demolition | Permit status: Cmp | Completion date: September 18, 2013 | Current use: Office - profes | |||||
SCORE 95 Remove roofing on 3rd floor deck and re-roof with epdm. 8 squares, 1 4 :1 pitch. Date: November 13, 2012 Contractor: Grabau Roofing Inc Client: Street 1919.0 | Applicant: Grabau Roofing Inc | Permit type: Roofing | Permit status: Iss | Current use: Existing | |||||
SCORE 95 Fs - tenant finish on 3rd floor. Date: December 28, 2012 Contractor: American Sprinkler Inc Client: Street 1919.0 | Applicant: American Sprinkler Inc | Permit type: Fire | Permit status: Act | Current use: Office - admini | |||||
SCORE 95 Fs - tenant finish Date: January 2, 2013 Contractor: American Sprinkler Inc Client: Street 1919.0 | Applicant: American Sprinkler Inc | Permit type: Fire | Permit status: Cmp | Completion date: March 15, 2013 | Current use: Office - admini | |||||
SCORE 100 Temporary plywood enclosure to protect store-front during modifications per pmt2012-02571. Material equipment occupying row only. Date: January 15, 2013 Contractor: Wyatt Construction Co Inc Client: Street 1919.0 | Applicant: Wyatt Construction Co, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Fs - waterc Date: February 20, 2013 Contractor: Fire Defense Inc Client: Street 1919.0 | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: July 29, 2013 | Current use: Office - admini | |||||
SCORE 99 Replacement in kind of four existing antennae for verizon wireless. Client: Street 1919.0 | Applicant: Western Telcom Inc | Permit type: Building | Permit status: Cmp | Completion date: January 30, 2014 | Current use: Telecommunicati | |||||
SCORE 100 Fs - sowl - inchadd 1 new pendent sprinkler to the new closet in the light hazard space. Inch Date: August 28, 2013 Contractor: Freedom Fire Protection Llc Client: Street 1919.0 | Applicant: Freedom Fire Protection, Llc | Permit type: Fire | Permit status: Iss | Current use: Office - admini | |||||
SCORE 95 Antenna upgrades utilizing existing structural components on the colorado building. Please refer to adr2013-00047 for administrative approval. Client: Street 1919.0 | Applicant: Mastec Network Solutions | Permit type: Electrical, antenna | Permit status: N&v | Current use: Financial insti | |||||
SCORE 100 Remove replace existing sidewalk Date: September 19, 2013 Contractor: Wyatt Construction Co Inc Client: Street 1919.0 | Applicant: Wyatt Construction Co, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 98 Reworking of existing 15a circuit from exiting power cabinet to test equipment upgrades. Date: November 18, 2013 Contractor: Allstar Electrical Services Client: Street 1919.0 | Applicant: Allstar Electrical Services | Permit type: Electrical | Permit status: Iss | Current use: Office - profes | |||||
SCORE 95 Installation of two new mini-split ductless systems (1 ton and 3 ton) on lower roof. Date: August 29, 2014 Contractor: Control Service Center Inc Client: Street 1919.0 | Applicant: Control Service Center Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: December 29, 2014 | Current use: Office - admini | |||||
SCORE 89 Antenna modification at an existing sprint telecommunications facility on the colorado building. The proposed work will consist of removing and replacing 3 panel antennas and mounts, installing 3 new rtufoots, and installing 1 new bbu kit inside the mmbs cabinet. Client: Street 1919.0 | Applicant: Centerline Solutions, Llc | Permit type: Antenna | Permit status: Cmp | Completion date: July 15, 2015 | Current use: Office - profes | |||||
SCORE 100 Upgrade of existing electrical service to a commercial building (colorado building). Date: February 23, 2015 Contractor: Wyatt Construction Co Inc Client: Street 1919.0 | Applicant: Wyatt Construction Co, Inc | Permit type: Electrical | Permit status: Iss | Current use: Office - profes | |||||
SCORE 95 Replace two 8 mbh boilers in sub-basement mechanical room with 92% units, same size and location. Interior work only. Date: March 17, 2015 Contractor: Control Service Center Inc Client: Street 1919.0 | Applicant: Control Service Center Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: June 4, 2015 | Current use: Existing | |||||
SCORE 100 Interior non-structural demolition of finishes in the colorado building for floors four through nine. Work to runconcurrently with asbestos mitigation already in process. Work is to return interior to inchgray shellinch for future tenant finish. Date: March 26, 2015 Contractor: Wyatt Construction Co Inc Client: Street 1919.0 | Applicant: Wyatt Construction Co, Inc | Permit type: Demolition | Permit status: Iss | Current use: Office - profes | |||||
SCORE 100 Interior remodel to create a future [verizon] equipment room on the ninth floor of the colorado building (144 sq. Ft.). No meps included Client: Street 1919.0 | Applicant: Wyatt Construction Co, Inc | Permit type: Building | Permit status: Iss | Current use: Office - profes | |||||
SCORE 100 Renovation of restroom, lobby, and elevator core on floors 4 through 9 in the colorado building. Exterior modifcations include replacement of glazing system. Includes associated mep. Client: Street 1919.0 | Applicant: Wyatt Construction Co, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Office - profes | |||||
SCORE 65 Installation of 2 amp load center and associated equipment and lighting for verizon wireless equipment room. Electrical only. See pmt2015-01474 for associated tenant remodel. Date: July 20, 2015 Contractor: Thoridon Electric Inc Client: Street 1919.0 | Applicant: Thoridon Electric, Inc. | Permit type: Electrical | Permit status: Iss | Current use: Commercial/reta | |||||
SCORE 74 Mechanical permit for new rtu for office building. Please refer to structural engineerfoots letter, and reference his2015-00187 Date: July 20, 2015 Contractor: Knerl Sheet Metal Inc Client: Street 1919.0 | Applicant: Knerl Sheet Metal, Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: August 10, 2015 | Current use: Office - profes | |||||
SCORE 100 Replace a damaged cable box. Job #25936 Date: July 31, 2015 Contractor: Comcast Client: Street 1919.0 | Applicant: Comcast | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 88 Fs - tf for office space (9th floor) Client: Street | Permit type: Fire | Permit status: Cmp | Completion date: March 9, 2016 | Current use: Office - administrative, existing | Permit id: Pmt2016-00554 | |||||
SCORE 95 Place small lift on sidewalk to replace metal trim on window system. Includes 1375 walnut. Date: March 2, 2016 Contractor: Wyatt Construction Co, Inc Client: Street | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-00819 | |||||
SCORE 98 Fa - es - add four new h s to office space Client: Street | Permit type: Fire | Permit status: Cmp | Completion date: July 29, 2016 | Current use: Office - administrative, existing | Permit id: Pmt2016-01351 | |||||
SCORE 95 Fs - es - tf for office space (7th floor) Client: Street | Permit type: Fire | Permit status: Cmp | Completion date: May 12, 2016 | Current use: Office - administrative, existing | Permit id: Pmt2016-01454 | |||||
SCORE 95 Fa - radio system Client: Street | Permit type: Fire | Permit status: Cmp | Completion date: July 29, 2016 | Current use: Office - professional, existing | Permit id: Pmt2016-01675 | |||||
SCORE 95 Tenant remodel of suite #8 for inchenvision energyinch including interior work consisting of non-bearing walls, associated finishes, mechanical, plumbing and electrical work. Client: Street | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: September 8, 2016 | Current use: Office - professional, tenant remodel | Permit id: Pmt2016-01702 | |||||
SCORE 88 Es - fa - 8th floor tf Client: Street | Permit type: Fire | Permit status: Cmp | Completion date: September 2, 2016 | Current use: Office - professional, existing | Permit id: Pmt2016-02646 | |||||
SCORE 95 Place small lift on sidewalk adjacent to the building to replace metal trim on window system. Marc 720-346-1084 Date: July 22, 2016 Contractor: Wyatt Construction Co, Inc Client: Street | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-03237 | |||||
SCORE 95 Total tear off and reroof of exisitng standing seam roof portion on the south and east faces of an existing office building, as detailed on lac - see his2016-00234 approval. Mid-roof inspection is required. Client: Street | Permit type: Roofing | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2016-03685 | |||||
Removal of two existing antennas on structure, installation of two replacement antennas -- same dimensions, same location -- replacement antennas to be painted to match existing. Installatioon of one fiber optic rack & fiber optic cabinet in interior room -- install 2 (two) 4inch conduit runs from 1st floor to 7th floor. No electrical work allowed under the scope of this permit. Date: February 4, 2009 Value: $5,000 Client: Street | Permit type: Building | Permit status: Cmp | Completion date: January 21, 2010 | Current use: Telecommunications, alteration | Permit id: Pmt2009-00302 | |||||
SCORE 95 Replacement rooftop unit (200-ton cooling tower). Replacement to be a direct swap-out, same size, same location. Client: Street | Permit type: Mechanical | Permit status: Cmp | Completion date: July 20, 2009 | Current use: Commercial/retail, existing | Permit id: Pmt2009-00381 | |||||
SCORE 95 Remodel of suite #211 to remove interior, non-bearing partition walls. Client: Street | Permit type: Building | Permit status: Cmp | Completion date: January 8, 2015 | Current use: Office - professional, tenant remodel | Permit id: Pmt2009-01075 | |||||
SCORE 95 Scope of work letter suite 609 Client: Street | Permit type: Fire | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2009-01786 | |||||
SCORE 79 Total tear-off & reroof of an office building -- squares on a 1 4inch per foot slope mil epdm ballasted roof. Includes installation of tapered isocyanurate and 1 2inch high density board. Client: Street | Permit type: Roofing | Permit status: Cmp | Completion date: December 6, 2013 | Current use: Office - administrative, existing | Permit id: Pmt2009-03837 | |||||
SCORE 95 Temporary plywood enclosure to protect store-front during modifications per pmt2012-02571. Material equipment occupying row only. Date: January 15, 2013 Contractor: Wyatt Construction Co, Inc Client: Street | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2013-00188 | |||||
SCORE 95 Fs - waterc Client: Street | Permit type: Fire | Permit status: Cmp | Completion date: July 29, 2013 | Current use: Office - administrative, existing | Permit id: Pmt2013-00733 | |||||
SCORE 95 Fs - sowl - inchadd 1 new pendent sprinkler to the new closet in the light hazard space. Inch Client: Street | Permit type: Fire | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2013-04297 | |||||
SCORE 95 Remove replace existing sidewalk Date: September 19, 2013 Contractor: Wyatt Construction Co, Inc Client: Street | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2013-04612 | |||||
SCORE 98 Reworking of existing 15a circuit from exiting power cabinet to test equipment upgrades. Client: Street | Permit type: Electrical | Permit status: N&v | Current use: Office - professional, existing | Permit id: Pmt2013-06508 | |||||
Temp tent for festival on 8-5-00 Date: August 3, 2000 Value: $300 Client: Building Colorado | Permit type: Temporary event | Permit status: N&v | Current use: Shed, new | Permit id: Pmt2000-03220 | |||||
SCORE 95 Reroof upper middle section of roof. Move ballast, install new 60mil epdm, move balast back. Roof will have 2 layers total. 26 squares to be installed. Client: Building Colorado | Permit type: Roofing | Permit status: Cmp | Completion date: June 12, 2001 | Current use: Commercial/retail, existing | Permit id: Pmt2001-02335 | |||||
SCORE 95 Installation of two new mini-split ductless systems (1 ton and 3 ton) on lower roof. Client: Street | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: December 29, 2014 | Current use: Office - administrative, existing | Permit id: Pmt2014-04058 | |||||
SCORE 95 Suite # -- tenant remodel of basement level -- 9,6 sf to create offices, accessible restrooms and shower area. Includes associated electrical, mechanical (new vav boxes, controls, convert current ahu to a variable frequency motor) and plumbing. Elevator being installed under separate state permit cp11-002139. Client: Street | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: July 3, 2014 | Current use: Office - administrative, tenant remodel | Permit id: Pmt2012-00433 | |||||
SCORE 95 Interior non-structural demolition to remove glass ceiling elements and associated frame in atrium space off walnut. Date: May 16, 2012 Contractor: Rincon Development, Inc Client: Street | Permit type: Demolition | Permit status: Cmp | Completion date: January 8, 2015 | Current use: Existing | Permit id: Pmt2012-02323 | |||||
SCORE 95 Remodel of existing atrium and addition of a new smoke evacuation system in the colorado building. 117 square feet of level one to be removed. New fire alarm panel and smoke evacuation sub-panel to be permitted seperately. 9 20 12 revisions include removing 752 square feet of floor area, while adding only 672 square feet, no floor area expansion requested. Client: Street | Permit type: Building, electrical, mechanical | Permit status: Iss | Current use: Office - professional, remodel | Permit id: Pmt2012-02571 | |||||
SCORE 95 Tenant remodel of suite 1 for newton running co. Offices including installation of interior, non-bearing walls for offices and conference room, reception area, and employee break area. Includes assoicated electrical, mechanical and plumbing, no new fixures (relocate only). Client: Street | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Office - professional, tenant remodel | Permit id: Pmt2012-02942 | |||||
SCORE 95 Tennant finish sprinkler for newton running Client: Street | Permit type: Fire | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2012-03316 | |||||
SCORE 95 Remodel permit to reconfiguration of south stair tower exit and installation of new exterior exit door. No new floor area proposed, only reconfiguration of existing. Scope of work includes associated electrical work. Client: Street | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 11, 2014 | Current use: Office - professional, tenant remodel | Permit id: Pmt2012-03658 | |||||
SCORE 95 Interior component demolition to remove inchbird-houseinch area on second floor, and associated spiral stair case. Date: August 28, 2012 Contractor: Rincon Development, Inc Client: Street | Permit type: Demolition | Permit status: Cmp | Completion date: October 12, 2012 | Current use: Office - professional, existing | Permit id: Pmt2012-04154 | |||||
SCORE 95 Revise structure at front exterior entry at suite 1 including demo and replacement of lid and storefront at se corner entry along with minor structural updates. Includes associated electrical and mechanical. Client: Street | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: August 13, 2013 | Current use: Alteration | Permit id: Pmt2012-05238 | |||||
SCORE 98 Fa - new system. Basement through third only. Client: Street | Permit type: Fire | Permit status: Cmp | Completion date: September 10, 2013 | Current use: Office - administrative, existing | Permit id: Pmt2012-05314 | |||||
SCORE 95 Interior tenant remodel of 11,112 square feet for offices and business headquarters of inchaurora organic dairyinch. Mep as deferred submittal. Client: Street | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: March 18, 2013 | Current use: Office - professional, tenant remodel | Permit id: Pmt2012-05350 | |||||
SCORE 95 Interior non-structural demolition in preparation for tenant remodel associated with pmt2012-05350. Date: November 5, 2012 Contractor: Rincon Development, Inc Client: Street | Permit type: Demolition | Permit status: Cmp | Completion date: September 18, 2013 | Current use: Office - professional, existing | Permit id: Pmt2012-05354 | |||||
SCORE 95 Remove roofing on 3rd floor deck and re-roof with epdm. 8 squares, 1 4 :1 pitch. Client: Street | Permit type: Roofing | Permit status: Iss | Current use: Existing | Permit id: Pmt2012-05459 | |||||
SCORE 95 Fs - tenant finish Client: Street | Permit type: Fire | Permit status: Cmp | Completion date: March 15, 2013 | Current use: Office - administrative, existing | Permit id: Pmt2012-06132 | |||||
SCORE 95 Fire sprinkler system - 1st floor (820-822) Client: Building Colorado | Permit type: Fire | Permit status: Cmp | Completion date: March 24, 2004 | Current use: Commercial/retail, existing | Permit id: Pmt2004-00461 | |||||
SCORE 84 Intstall s. F. Temporary grand opening banner for open studios. Approved for 9 18 2004 - 10 18 2004. Client: Building Colorado | Permit type: Sign | Permit status: Cmp | Completion date: July 12, 2007 | Current use: Commercial/retail, existing | Permit id: Pmt2004-03536 | |||||
SCORE 95 Demo permit - for interior non-structural demo of partition walls. Includes removal of one bathroom, one kitchen sink, two hand sinks, and a drinking fountain. Date: February 19, 2010 Contractor: Rincon Development, Inc Client: Street | Permit type: Demolition | Permit status: Cmp | Completion date: October 12, 2012 | Current use: Office - professional, existing | Permit id: Pmt2010-00623 | |||||
SCORE 95 Tenant remodel of 4,794 square foot tentant space, for professional office. Client: Street | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: October 13, 2010 | Current use: Office - professional, tenant remodel | Permit id: Pmt2010-00737 | |||||
SCORE 95 Tennant finish sprinkler for navigant Client: Street | Permit type: Fire | Permit status: Cmp | Completion date: October 13, 2010 | Current use: Office - professional, existing | Permit id: Pmt2010-01094 | |||||
SCORE 99 New backflow preventor Client: Street | Permit type: Fire | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2010-01118 | |||||
SCORE 95 Tenant expansion of 591 sf to the current suite for guaranty bank -- modification to lobby area & ada counter, reconfiguration of office walls, create new conference room & an office. Client: Street | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 14, 2010 | Current use: Financial institution, tenant remodel | Permit id: Pmt2010-01746 | |||||
Installation of clearwire cellular telecommunications facility per adr2010-00144 Value: $2,000 Client: Street | Permit type: Building, electrical | Permit status: N&v | Current use: Telecommunications, remodel | Permit id: Pmt2010-04628 | |||||
SCORE 95 Fire sprinkler system - ste 225 Client: Building Colorado | Permit type: Fire | Permit status: N&v | Current use: Office - professional, existing | Permit id: Pmt2003-03372 | |||||
SCORE 95 Construct new metal awnings in accordance with plans and approved revocable permit. Signs are not included in this permit. Client: Building Colorado | Permit type: Building | Permit status: N&v | Current use: Office - professional, alteration | Permit id: Pmt2003-04300 | |||||
SCORE 95 Scope of work letter add and relocate 6 sprinkler of new tennant Client: Street | Permit type: Fire | Permit status: Cmp | Completion date: December 14, 2007 | Current use: Office - professional, existing | Permit id: Pmt2007-04870 | |||||
SCORE 95 Remodel in suite 1 including demising wall soffit installation, minor ceiling changes associated trim. No mechanical, electrical or plumbing. Client: Street | Permit type: Building | Permit status: Cmp | Completion date: January 30, 2012 | Current use: Tenant remodel | Permit id: Pmt2011-01706 | |||||
SCORE 95 Tennant finish sprinkler reverting system back to core and shell protection Client: Street | Permit type: Fire | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2011-01861 | |||||
SCORE 95 Interior non-structural demolition of unit to open up space for future leasing. No proposed use at this time, not approved for occupancy. Date: August 26, 2011 Contractor: Rincon Development, Inc Client: Street | Permit type: Demolition | Permit status: Cmp | Completion date: January 8, 2015 | Current use: Amusement/recreational - indoor, existin | Permit id: Pmt2011-03594 | |||||
SCORE 95 Set a dumster for days on 14th n of walnut in paid parking spaces. Date: October 7, 2011 Contractor: Rincon Development, Inc Client: Street | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2011-04311 | |||||
SCORE 95 Installation of two replacement low-pressure boilers -- 850,0 btu each, 92%+ efficiency. Client: Street | Permit type: Mechanical | Permit status: Cmp | Completion date: March 2, 2012 | Current use: Office - administrative, existing | Permit id: Pmt2011-05300 | |||||
SCORE 84 Antenna modification at an existing sprint telecommunications facility on the colorado building. The proposed work will consist of removing and replacing 3 panel antennas and mounts, installing 3 new rtufoots, and installing 1 new bbu kit inside the mmbs cabinet. Client: Street | Permit type: Antenna | Permit status: Cmp | Completion date: July 15, 2015 | Current use: Office - professional, existing | Permit id: Pmt2015-00363 | |||||
SCORE 95 Upgrade of existing electrical service to a commercial building (colorado building). Client: Street | Permit type: Electrical | Permit status: Cmp | Completion date: September 28, 2015 | Current use: Office - professional, existing | Permit id: Pmt2015-00488 | |||||
SCORE 95 Replace two 8 mbh boilers in sub-basement mechanical room with 92% units, same size and location. Interior work only. Client: Street | Permit type: Mechanical | Permit status: Cmp | Completion date: June 4, 2015 | Current use: Existing | Permit id: Pmt2015-00905 | |||||
SCORE 95 Interior non-structural demolition of finishes in the colorado building for floors four through nine. Work to runconcurrently with asbestos mitigation already in process. Work is to return interior to inchgray shellinch for future tenant finish. Date: March 26, 2015 Contractor: Wyatt Construction Co, Inc Client: Street | Permit type: Demolition | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2015-01075 | |||||
SCORE 95 Interior remodel to create a future [verizon] equipment room on the ninth floor of the colorado building (144 sq. Ft.). No meps included Client: Street | Permit type: Building | Permit status: Iss | Current use: Office - professional, remodel | Permit id: Pmt2015-01474 | |||||
SCORE 95 Renovation of restroom, lobby, and elevator core on floors 4 through 9 in the colorado building. Exterior modifcations include replacement of glazing system. Includes associated mep. Client: Street | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Office - professional, tenant remodel | Permit id: Pmt2015-01533 | |||||
SCORE 65 Installation of 2 amp load center and associated equipment and lighting for verizon wireless equipment room. Electrical only. See pmt2015-01474 for associated tenant remodel. Client: Street | Permit type: Electrical | Permit status: Cmp | Completion date: September 10, 2015 | Current use: Commercial/retail, existing | Permit id: Pmt2015-02645 | |||||
SCORE 74 Mechanical permit for new rtu for office building. Please refer to structural engineerfoots letter, and reference his2015-00187 Client: Street | Permit type: Mechanical | Permit status: Cmp | Completion date: August 10, 2015 | Current use: Office - professional, existing | Permit id: Pmt2015-02988 | |||||
Replace a damaged cable box. Job #25936 Date: July 31, 2015 Client: Street | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2015-03036 | |||||
SCORE 95 Renovate the 9th floor of the colorado building for the offices of woodbourne. Work to include new non structural partitions, mep and finishes. Client: Street | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: March 4, 2016 | Current use: Office - professional, tenant finish | Permit id: Pmt2015-03975 | |||||
SCORE 95 Remove and replace window system Date: September 18, 2015 Contractor: Wyatt Construction Co, Inc Client: Street | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2015-04009 | |||||
SCORE 95 Interior remodel of the 7th floor (6194 sq. Ft.). Scope of work includes associated electrical and mechanical work, to include new chilled beam units. Client: Street | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: June 16, 2016 | Current use: Office - professional, remodel | Permit id: Pmt2015-04766 | |||||
SCORE 95 5th and 6th floor inchvanilla shellinch remodel for future tenant. Scope of work includes associated meps, to include water piping for chill beam system and mechanical duct work for chill beam system. Client: Street | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Completion date: May 11, 2017 | Current use: Office - professional, remodel | Permit id: Pmt2016-05056 | |||||
SCORE 95 Fs - 5th floor (sowl) Client: Street | Permit type: Fire | Permit status: Cmp | Completion date: April 7, 2017 | Current use: Office - administrative, existing | Permit id: Pmt2017-00599 | |||||
SCORE 95 Fs - 6th floor (sowl) Client: Street | Permit type: Fire | Permit status: Cmp | Completion date: April 7, 2017 | Current use: Office - administrative, existing | Permit id: Pmt2017-00600 | |||||
SCORE 88 Fa - 6th floor Client: Street | Permit type: Fire | Permit status: Cmp | Completion date: April 7, 2017 | Current use: Office - administrative, existing | Permit id: Pmt2017-00595 | |||||
SCORE 88 Fa- 5th floor Client: Street | Permit type: Fire | Permit status: Cmp | Completion date: April 7, 2017 | Current use: Office - administrative, existing | Permit id: Pmt2017-00597 | |||||
Installation of clearwire cellular telecommunications facility per adr2010-00144 Value: $2,000 Client: Street | Permit type: Building, electrical | Permit status: N&v | Current use: Telecommunications, remodel | Permit id: Pmt2010-04628 | |||||
SCORE 95 Fire spinkler system tenant finish Client: Building Colorado | Permit type: Fire | Permit status: Cmp | Completion date: May 26, 2000 | Current use: Office - administrative, tenant finish | Permit id: Pmt2000-01119 | |||||
SCORE 91 Adding battery backup cabinet and relocate an existing power cabinet to the lower level. Client: Colorado Building Group | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 4, 2001 | Current use: Office - administrative, existing | Permit id: Pmt2000-03508 | |||||
SCORE 95 Change elevator control system in two existing passenger elevators. Signal fixture, governors, and unit door operator. Existing building has 8 stories. Client: Building Colorado | Permit type: Elevator | Permit status: Cmp | Completion date: July 19, 2005 | Current use: Office - professional, existing | Permit id: Pmt2002-04334 | |||||
SCORE 89 Electrical permit to connect existing power supplies to new elevator equipment for suite 615. Client: Building Colorado | Permit type: Electrical | Permit status: N&v | Current use: Office - professional, existing | Permit id: Pmt2003-00533 | |||||
SCORE 96 Fire alarm system - elevator upgrade Client: Building Colorado | Permit type: Fire | Permit status: Cmp | Current use: Office - professional, existing | Permit id: Pmt2003-00732 | |||||
SCORE 56 Tenant remodel suite 300. No structural or plumbing changes. 1345 sf Client: Wittemyer John | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 24, 2007 | Current use: Office - professional, tenant remodel | Permit id: Pmt2007-02647 | |||||
SCORE 95 Tenant remodel of office space to reconfigure interior non-structural walls. Client: Street | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: November 1, 2007 | Current use: Office - professional, tenant remodel | Permit id: Pmt2007-04030 | |||||
Installation of clearwire cellular telecommunications facility per adr2010-00144 Value: $2,000 Client: Street | Permit type: Building, electrical | Permit status: N&v | Current use: Telecommunications, remodel | Permit id: Pmt2010-04628 | |||||
SCORE 95 Tenant remodel in suite 803 including removal of non-bearing walls, remove and replace sink and base, update hardware and finishes. Value: $2,000 Contractor: Rincon Development, Inc Client: Street | Permit type: Building, electrical, plumbing | Permit status: N&v | Current use: Office - technical, tenant remodel | Permit id: Pmt2011-00557 | |||||
SCORE 95 Fs - tenant finish on 3rd floor. Value: $10,300 Contractor: American Sprinkler Inc Client: Street | Permit type: Fire | Permit status: Act | Current use: Office - administrative, existing | Permit id: Pmt2012-06128 | |||||
SCORE 95 Antenna upgrades utilizing existing structural components on the colorado building. Please refer to adr2013-00047 for administrative approval. Value: $5,000 Contractor: Mastec Network Solutions Client: Street | Permit type: Electrical, antenna | Permit status: N&v | Current use: Financial institution, existing | Permit id: Pmt2013-04537 | |||||
SCORE 95 Tenant remodel - demo of existing walls and doors and installation of window and frame in one existing wall. No mechanical, plumbing or electrical. Client: Street 1919.0 | Applicant: Rincon Development, Inc. | Permit type: Building | Permit status: Cmp | Completion date: October 12, 2012 | Current use: Office - profes | |||||
SCORE 100 Tennant finish fire alarm addtion of smoke detection and new pannel for elevator recall Date: January 4, 2012 Contractor: Safe Systems Inc Client: Street 1919.0 | Applicant: Safe Systems, Inc | Permit type: Fire | Permit status: Iss | Current use: Office - profes | |||||
SCORE 100 New sprinkler system for basement level of w. W. Reynoldfoots company Date: April 4, 2012 Contractor: Flow Fire Protection Inc Client: Street 1919.0 | Applicant: Flow Fire Protection, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: October 10, 2012 | Current use: Office - profes | |||||
SCORE 100 Fs - sowl - all work to be performed shall be in suite 525 and consist of turning 4 ssp sprinklers to ssu sprinklers for the removal of the ceiling grid and also adding 2 ssp sprinklers to the clouds over the works stationsinch Date: June 24, 2013 Contractor: Freedom Fire Protection Llc Client: Street 1919.0 | Applicant: Freedom Fire Protection, Llc | Permit type: Fire | Permit status: Iss | Current use: Office - admini | |||||
SCORE 95 Arches,llc-899 sq. Ft. Inerior remodel. Removal of non-structural walls and add new closet for it components. Existing lighting to remain, some light fixtures to be moved, whips to remain connected. New wiring to run from new closet to workstations. Air supply and return diffusers to be remove for cleaning and repainting. Old acoustic tiles to be removed and replaced with new. Patch existing carpet and repaint walls. 20% ada not required for this project. Client: Street 1919.0 | Applicant: Treeline Homes Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Office - profes | |||||
SCORE 95 Tenant remodel - demo of existing walls and doors and installation of window and frame in one existing wall. No mechanical, plumbing or electrical. Client: Street | Permit type: Building | Permit status: Cmp | Completion date: October 12, 2012 | Current use: Office - professional, alteration | Permit id: Pmt2009-03027 | |||||
SCORE 95 Fs - sowl - all work to be performed shall be in suite 525 and consist of turning 4 ssp sprinklers to ssu sprinklers for the removal of the ceiling grid and also adding 2 ssp sprinklers to the ? Clouds? Over the works stationsinch Client: Street | Permit type: Fire | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2013-02931 | |||||
SCORE 95 Arches,llc-899 sq. Ft. Inerior remodel. Removal of non-structural walls and add new closet for it components. Existing lighting to remain, some light fixtures to be moved, whips to remain connected. New wiring to run from new closet to workstations. Air supply and return diffusers to be remove for cleaning and repainting. Old acoustic tiles to be removed and replaced with new. Patch existing carpet and repaint walls. 20% ada not required for this project. Client: Street | Permit type: Building, electrical, mechanical | Permit status: Iss | Current use: Office - professional, remodel | Permit id: Pmt2013-03535 | |||||
SCORE 95 Tennant finish fire alarm addtion of smoke detection and new pannel for elevator recall Client: Street | Permit type: Fire | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2012-00026 | |||||
SCORE 95 New sprinkler system for basement level of w. W. Reynoldfoots company Client: Street | Permit type: Fire | Permit status: Cmp | Completion date: October 10, 2012 | Current use: Office - professional, existing | Permit id: Pmt2012-01507 |