Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Suppression permit Date: November 7, 2012 Client: Tbm Group Inc | Permit status: Completed | Permit id: 433732 | |||||
Plumbing permit Date: June 21, 2012 Client: Tbm Group Inc | Permit status: Completed | Permit id: 412622 | |||||
Zoning/use permit Date: March 5, 2012 Client: Tbm Group Inc | Permit status: Completed | Permit id: 371285 | |||||
Electrical permit Date: September 7, 2012 Client: Tbm Group Inc | Permit status: Completed | Permit id: 426186 | |||||
Mechanical permit Date: July 27, 2012 Client: Tbm Group Inc | Permit status: Completed | Permit id: 418876 | |||||
New construction permit Date: May 9, 2012 Client: Tbm Group Inc | Permit status: Completed | Permit id: 396230 | |||||
Permit for the erection of a three (3) story attached structure (not to exceed thirty-five feet (35-0") in height) with partial roof top deck accessed by a pilot house at the roof level (pilot house footprint not to exceed forty-eight square feet (48 sf); height not to exceed ten feet (100")). Proposed structure for use as a two (2) family dwelling throughout. For the erection of six foot (6-0") high fencing with access gate at poplar street frontage. For the elimination of a sixteen foot (16-0") wide rear driveway easement previously established on zoning permit # 347369 and use permit # 347478. Date: January 3, 2012 Client: Tbm Group Inc | Applicant: Joseph Beller, Esq. | Permit type: Appeal | Permit status: Granted/prov | Completion date: February 28, 2012 | Permit id: 16949 | |||||
Mechanical permit Date: July 27, 2012 Client: Tbm Group Inc | Permit status: Completed | Permit id: 418876 | |||||
Suppression permit Date: November 7, 2012 Client: Tbm Group Inc | Permit status: Completed | Permit id: 433732 | |||||
Electrical permit Date: September 7, 2012 Client: Tbm Group Inc | Permit status: Completed | Permit id: 426186 | |||||
Plumbing permit Date: July 18, 2012 Client: Tbm Group Inc | Permit status: Completed | Permit id: 417031 | |||||
New construction permit Date: May 9, 2012 Client: Tbm Group Inc | Permit status: Completed | Permit id: 396230 | |||||
Zoning use permit Date: March 5, 2012 Client: Tbm Group Inc | Permit status: Completed | Permit id: 371285 | |||||
Permit for the erection of a three (3) story attached structure (not to exceed thirty-five feet (35-0") in height) with partial roof top deck accessed by a pilot house at the roof level (pilot house footprint not to exceed forty-eight square feet (48 sf); height not to exceed ten feet (100")). Proposed structure for use as a two (2) family dwelling throughout. For the erection of six foot (6-0") high fencing with access gate at poplar street frontage. For the elimination of a sixteen foot (16-0") wide rear driveway easement previously established on zoning permit # 347369 and use permit # 347478. Date: January 3, 2012 Client: Tbm Group Inc | Applicant: Joseph Beller, Esq. | Permit type: Appeal | Permit status: Granted/prov | Completion date: February 28, 2012 | Permit id: 16949 | |||||
SCORE 97 2 toilets, 2 lavs, 2 tubs, 2 ks, 2 laundry tub waste pipes and 2 hwh(2fd) Date: June 21, 2012 Contractor: Richard Lawrence Client: Tbm Group Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 30, 2013 | Permit id: 412622 | |||||
SCORE 100 300amp service 3 gang meter 150,150, amp meter device 2-1 panel and 1- amp panel wiring throughout as per 2008 nec (two family) Date: September 7, 2012 Contractor: Anthony S. Rachuba Jr Client: Tbm Group Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: June 6, 2013 | Permit id: 426186 | |||||
SCORE 100 Install sewer laterl from main to bldg(2fd) Date: July 18, 2012 Contractor: Benjamin Magness Client: Tbm Group Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 30, 2013 | Permit id: 417031 | |||||
SCORE 91 Install two 2. 5 ton heat pump units including ductwork (2-family dwelling) Date: July 27, 2012 Contractor: Igor Sourotkine Client: Tbm Group Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: April 30, 2013 | Permit id: 418876 | |||||
For the erection of a three (3) story attached structure with cellar (not to exceed thirty-five feet (35-0") in height) and partial roof deck accessed by a pilot house at the roof level (pilot house footprint not to exceed forty-eight square feet (48 sf); height not to exceed ten feet (10-0")). For the erection of six foot (6-0") high fencing in the rear yard. Size and location as shown in plan approved by zoning board of adjustment on 2 21 12. For the elimination of a sixteen foot (16-0") wide driveway easement previously established on zoning permit # 347369 and use permit # 347478. For use as a two (2) family dwelling throughout. Date: March 5, 2012 Client: Tbm Group Inc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: October 26, 2012 | Permit id: 371285 | |||||
See a p # 396228 for the approved plans. Construction of a new 3 story, 2 family dwelling with a cellar and a roof top deck as per the submited sealed documentation. Plumbing, electrical, mechanical, and fire suppression work requires additional permits. Call the inspector prior to starting work. Date: May 9, 2012 Client: Tbm Group Inc | Permit type: New construction permit | Permit status: Completed | Completion date: April 30, 2013 | Permit id: 396230 | |||||
SCORE 100 For the installation of a two (2) inch fire service line w. Backflow preventor (bfp) assembly for a three (3) story residential building; automatic sprinkler system installation in accordance with nfpa 13r. Date: November 7, 2012 Contractor: B. M. Consulting Services Inc Client: Tbm Group Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: April 30, 2013 | Permit id: 433732 |