Administrative permit Date: January 17, 2013 Client: Smik Robert | Permit status: Completed | Permit id: 434199 | |||||
Plumbing permit Date: February 11, 2013 Client: Smik Robert | Permit status: Completed | Permit id: 452943 | |||||
Zoning/use permit Date: August 15, 2012 Client: Smik Robert | Permit status: Completed | Permit id: 412278 | |||||
Plumbing permit Date: October 9, 2012 Client: Smik Robert | Permit status: Completed | Permit id: 431477 | |||||
Zoning admin review Date: December 20, 2012 Client: Smik Robert | Permit status: Completed | Permit id: 435223 | |||||
Suppression permit Date: October 2, 2012 Client: Smik Robert | Permit status: Completed | Permit id: 420028 | |||||
Electrical permit Date: February 11, 2013 Client: Smik Robert | Permit status: Expired | Permit id: 453002 | |||||
Mechanical permit Date: April 8, 2013 Client: Smik Robert | Permit status: Completed | Permit id: 463768 | |||||
New construction permit Date: September 19, 2012 Client: Smik Robert | Permit status: Completed | Permit id: 424767 | |||||
Permit/certificate for the erection of a three (3) story attached structure (41 to top of the pilot house) to include a cellar, a recessed first floor front, an open rear deck at the second floor level (with 42" high guardrails), a 9 high pilot house at the fourth floor level (107. 5 s. F.) to access the two (2) roof decks located above the third floor roof, and an interior parking garage, for use as a single family dwelling; and for the erection of a 6 high fence in the rear yard. Date: July 11, 2012 Client: Smik Robert | Applicant: Richard Demarco, Esq. | Permit type: Appeal | Permit status: Granted/prov | Completion date: August 14, 2012 | Permit id: 18451 | |||||
Suppression permit Date: October 2, 2012 Client: Smik Robert | Permit status: Completed | Permit id: 420028 | |||||
Plumbing permit Date: October 9, 2012 Client: Smik Robert | Permit status: Completed | Permit id: 431477 | |||||
Zoning admin review Date: December 20, 2012 Client: Smik Robert | Permit status: Completed | Permit id: 435223 | |||||
Administrative permit Date: January 18, 2013 Client: Smik Robert | Permit status: Completed | Permit id: 449047 | |||||
Electrical permit Date: February 11, 2013 Client: Smik Robert | Permit status: Expired | Permit id: 453002 | |||||
New construction permit Date: September 19, 2012 Client: Smik Robert | Permit status: Completed | Permit id: 424767 | |||||
Plumbing permit Date: February 11, 2013 Client: Smik Robert | Permit status: Completed | Permit id: 452943 | |||||
Zoning use permit Date: August 15, 2012 Client: Smik Robert | Permit status: Completed | Permit id: 412278 | |||||
Mechanical permit Date: April 8, 2013 Client: Smik Robert | Permit status: Completed | Permit id: 463768 | |||||
Permit certificate for the erection of a three (3) story attached structure (41 to top of the pilot house) to include a cellar, a recessed first floor front, an open rear deck at the second floor level (with 42" high guardrails), a 9 high pilot house at the fourth floor level (107. 5 s. F.) to access the two (2) roof decks located above the third floor roof, and an interior parking garage, for use as a single family dwelling; and for the erection of a 6 high fence in the rear yard. Date: July 11, 2012 Client: Smik Robert | Applicant: Richard Demarco, Esq. | Permit type: Appeal | Permit status: Granted/prov | Completion date: August 14, 2012 | Permit id: 18451 | |||||
SCORE 96 Install new 1" copper dual domestic water service sprinkler, new 5" lateral & new 4" main drain (sfd) pa1 call#20130371422 Date: February 11, 2013 Contractor: Frankie D And Benny G Plumbing And Client: Smik Robert | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 7, 2013 | Permit id: 452943 | |||||
SCORE 96 Complete wiring of house, install lights & devices, 200amp service as per 2008 nec (sfd) Date: February 11, 2013 Contractor: Allwire Electric Llc Client: Smik Robert | Permit type: Electrical permit | Permit status: Expired | Completion date: September 27, 2013 | Permit id: 453002 | |||||
SCORE 96 Install 90% 70,000. Btu gas furnace Date: April 8, 2013 Contractor: Balance Point Heating And Air Client: Smik Robert | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 30, 2013 | Permit id: 463768 | |||||
Erect a three (3) story structure with cellar, interior parking stall, recessed entry at first floor front, 6 foot high fence at rear yard, rear deck at 2nd floor, fourth story pilot house to access a rooftop deck above 3rd floor roof and to be used as a single family dwelling as per plans. Date: August 15, 2012 Client: Smik Robert | Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 15, 2012 | Permit id: 412278 | |||||
SCORE 100 Installation of fire suppression system Date: October 2, 2012 Contractor: B. M. Consulting Services Inc Client: Smik Robert | Permit type: Suppression permit | Permit status: Completed | Completion date: September 2, 2013 | Permit id: 420028 | |||||
SCORE 96 3-toilets, 3-lavs, 2-showers, 1-kit sink, 1-washer box, pwx & pvc throughout (sfd) Date: October 9, 2012 Contractor: Frankie D And Benny G Plumbing And Client: Smik Robert | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 30, 2013 | Permit id: 431477 | |||||
New constructionof a new 3 story sfd with cellar, interior parking stall, pilot house and roof deck as per plans. Date: September 19, 2012 Client: Smik Robert | Permit type: New construction permit | Permit status: Completed | Completion date: September 2, 2013 | Permit id: 424767 | |||||
Amend building permit#424767 to reflect the correct size of the building as per zba administrative approval. Date: January 17, 2013 Client: Smik Robert | Permit type: Administrative permit | Permit status: Completed | Completion date: March 25, 2013 | Permit id: 434199 | |||||
Request administrative review of zoning permit# 412278 due to erroneous lot depth dimension within the prior approved drawings. Previously approved drawings showed a 48 ft. 4 1 4 inch lot depth; the confirmed legal lot depth is 46 ft. In. The proposed building depth has been reduced by 2 ft. 4 1 4 in., the depth of the descrepancey. The proposed rear yard depth remains 7 ft 1 4 in. And open area has increased to 15. 3 % from the previously granted 14. 5 %. Date: December 20, 2012 Client: Smik Robert | Permit type: Zoning admin review | Permit status: Completed | Completion date: August 30, 2013 | Permit id: 435223 | |||||
SCORE 100 Amend permit #422028 to read "install new fire suppression system and 1" service in accordance with nfpa 13d throughout the entire building. All work shall comply with the approved plans. All work shall be performed by a fire suppression contractor licensed by the city of philadelphia." Date: January 18, 2013 Contractor: B. M. Consulting Services Inc Client: Smik Robert | Permit type: Administrative permit | Permit status: Completed | Completion date: April 26, 2013 | Permit id: 449047 |