Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: August 25, 2015 Client: Huang Qiao Zhen | Permit status: Completed | Permit id: 634454 | |||||
Administrative permit Date: October 1, 2015 Client: Huang Qiao Zhen | Permit status: Completed | Permit id: 636100 | |||||
Mechanical permit Date: September 30, 2015 Client: Huang Qiao Zhen | Permit status: Completed | Permit id: 642006 | |||||
Electrical permit Date: August 6, 2015 Client: Huang Qiao Zhen | Permit status: Completed | Permit id: 630080 | |||||
Zoning/use permit Date: March 24, 2015 Client: Huang Qiao Zhen | Permit status: Completed | Permit id: 560541 | |||||
New construction permit Date: April 29, 2015 Client: Huang Qiao Zhen | Permit status: Completed | Permit id: 598214 | |||||
Suppression permit Date: August 5, 2015 Client: Huang Qiao Zhen | Permit status: Completed | Permit id: 622535 | |||||
Zoning/use permit Date: May 10, 2007 Client: Huang Qiao Zhen | Permit status: Completed | Permit id: 70874 | |||||
Electrical permit Date: August 6, 2015 Client: Huang Qiao Zhen | Permit status: Completed | Permit id: 630080 | |||||
Zoning use permit Date: May 10, 2007 Client: Huang Qiao Zhen | Permit status: Completed | Permit id: 70874 | |||||
Plumbing permit Date: August 12, 2015 Client: Huang Qiao Zhen | Permit status: Completed | Permit id: 631688 | |||||
Mechanical permit Date: September 30, 2015 Client: Huang Qiao Zhen | Permit status: Completed | Permit id: 642006 | |||||
Administrative permit Date: October 1, 2015 Client: Huang Qiao Zhen | Permit status: Completed | Permit id: 636100 | |||||
Suppression permit Date: August 5, 2015 Client: Huang Qiao Zhen | Permit status: Completed | Permit id: 622535 | |||||
Zoning use permit Date: March 24, 2015 Client: Huang Qiao Zhen | Permit status: Completed | Permit id: 560541 | |||||
New construction permit Date: April 29, 2015 Client: Huang Qiao Zhen | Permit status: Completed | Permit id: 598214 | |||||
SCORE 89 Installation of nfpa 13d sprinkler system for single family residence. 1. 25" combined feed main. Permit holder design professional must ensure feed main including size of feed main is approved by pwd for the intended installation. Work to be inaccordance with engineer certified plans, hydraulic calculation and plan review form. Code design prof: james clancy, pe Date: August 5, 2015 Contractor: Aqueduct Fire Protection Client: Amato Anne Marie Coary Sean | Permit type: Suppression permit | Permit status: Completed | Completion date: August 1, 2016 | Permit id: 622535 | |||||
SCORE 97 Install 2 amp service and rewire single family dwelling as per 2008 nec (south district) Date: August 6, 2015 Contractor: Anthony Franklin Client: Amato Anne Marie Coary Sean | Permit type: Electrical permit | Permit status: Completed | Completion date: June 28, 2016 | Permit id: 630080 | |||||
SCORE 100 1 kitchen sink,1 washer,1 lav,1 wc,1 tub in basement and 2nd floor (sfd)the installation will comply with the philadelphia plumbing code 2004 Date: August 12, 2015 Contractor: Shegda Construction Corp Client: Amato Anne Marie Coary Sean | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 29, 2016 | Permit id: 631688 | |||||
SCORE 100 5" lateral. 1- 5x4 hlouse trap, 1-4" f. A. I. And 1 2 distribution pipe-pa1#2015-2370848-"self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: August 25, 2015 Contractor: Luzerne Mcallister Client: Amato Anne Marie Coary Sean | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 14, 2015 | Permit id: 634454 | |||||
To amend permit #598214 to alter the size of floor joists (now sized 2x12)and increase the building height to 37-6" as shown in revised plans. Date: October 1, 2015 Client: Amato Anne Marie Coary Sean | Permit type: Administrative permit | Permit status: Completed | Completion date: April 11, 2016 | Permit id: 636100 | |||||
SCORE 89 Installation of (1) hvac unit (including ductwork associated accessories). Sfd Date: September 30, 2015 Contractor: Lcd Heating And Air Conditioning Client: Amato Anne Marie Coary Sean | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 28, 2016 | Permit id: 642006 | |||||
SCORE 86 Construction of new sfd Date: May 10, 2007 Contractor: Vicencio Danilo Arch Client: Amato Anne Marie Coary Sean | Permit type: Zoning/use permit | Permit status: Completed | Completion date: May 10, 2007 | Permit id: 70874 | |||||
New attached structure with roof access stair enclsure and roof deck as shown in the submitted plan application. For use as single family household living. Date: March 24, 2015 Client: Amato Anne Marie Coary Sean | Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 24, 2015 | Permit id: 560541 | |||||
SCORE 99 New construction of a three story , single family dwelling, with roof deck and pilot house; as per plans. Building shall be fully sprinklered. Date: April 29, 2015 Contractor: Danny Vo Client: Amato Anne Marie Coary Sean | Permit type: New construction permit | Permit status: Completed | Completion date: June 28, 2016 | Permit id: 598214 |