Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 94 Replace steam boiler september school. Date: December 12, 2007 Contractor: Dynamic Repair Service Client: Schools September | Applicant: Dynamic Repair Service | Permit type: Mechanical | Permit status: N&v | Current use: Schools/educati | |||||
SCORE 100 Upgrade overhead secondary line & install 2 guy wires Date: February 13, 2008 Contractor: Xcel Energy Client: Schools September | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Tear-off reroof of september school, 26 squares on a pitch represented as 2 12 to 6 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Date: November 7, 2008 Contractor: Van Lier Roofing Inc Client: Schools September | Applicant: Van Lier Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Schools/educati | |||||
SCORE 95 Repair replace sewer service from structure to main Date: May 21, 2010 Contractor: Drain O Rooter Client: Schools September | Applicant: Drain O Rooter | Permit type: Wastewater, right-of | Permit status: Iss | |||||
SCORE 100 Bore from pole on 19th to 190s building. Date: November 1, 2011 Contractor: Comcast Client: Schools September | Applicant: Comcast | Permit type: Right-of-way | Permit status: Iss | |||||
Upgrade overhead secondary line & install 2 guy wires Date: February 13, 2008 Client: Schools September | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2008-00418 | |||||
Bore from pole on 19th to 190s building. Date: November 1, 2011 Client: Schools September | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2011-04654 | |||||
SCORE 94 Replace steam boiler september school. Client: Schools September | Permit type: Mechanical | Permit status: N&v | Current use: Schools/educational, existing | Permit id: Pmt2007-05477 | |||||
SCORE 100 Tear-off reroof of september school, 26 squares on a pitch represented as 2 12 to 6 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Client: Schools September | Permit type: Roofing | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Schools/educational, existing | Permit id: Pmt2008-04935 |