Dccr proposes two environmental borings, nebbd-13e and nebbd-14e, west of 1901 first street nw between the sidewalk and the southbound parking lane. The borings will each be 2 inches in diameter and feet deep. The boring will be completed using direct push methods. Date: January 9, 2013 Client: Ddot | Applicant: Chris Willett - Dc Clean Rivers | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300098 | |||||
Dccr proposes one geotechnical boring, nebbc-50, located west of 1901 1st street nw, one block north of rhode island ave. The boring will be 6 inches in diameter and 135 feet deep. The boring will be completed using conventional mud rotary drilling methods. A monitoring well will be installed 83 feet below ground surface upon completion. Date: January 16, 2013 Client: Ddot | Applicant: Chris Willett Dc Clean Rivers Project | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300108 | |||||
SCORE 76 Dccr proposes two environmental borings, nebbd-13e and nebbd-14e, west of 1901 first street nw between the sidewalk and the southbound parking lane. The borings will each be 2 inches in diameter and feet deep. The boring will be completed using direct push methods. Date: January 9, 2013 Contractor: Chris Willett Dc Clean Rivers Client: Ddot | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300098 | |||||
SCORE 72 Dccr proposes one geotechnical boring, nebbc-50, located west of 1901 1st street nw, one block north of rhode island ave. The boring will be 6 inches in diameter and 135 feet deep. The boring will be completed using conventional mud rotary drilling methods. A monitoring well will be installed 83 feet below ground surface upon completion. Date: January 16, 2013 Contractor: Chris Willett Dc Clean Rivers Project Client: Ddot | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300108 | |||||
SCORE 59 On behalf of the district of columbia water and sewer authority -dc water-, the dc clean rivers -dccr- project requests the approval to abandon a monitoring well -nebpi-01a- located in the church parking lot, west of 1901 1st st nw. This monitoring well was installed by dccr during the investigation and design phase to provide information regarding subsurface conditions. Construction of the tunnel and near surface structures under division p are now complete. Therefore, the well installed as part of this division is no longer needed and will be abandoned. The monitoring well will be abandoned by either removing the well casing or perforating the well casing in the screened interval and filling the well with a cement bentonite slurry. Monitoring wells will be abandoned following doee regulations. See attached work plan for more details. Date: June 6, 2017 Contractor: Dc Water; Homaira Sharif Aecom Client: Dc Water | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700305 |