Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 Building renovations single-family dwelling renovations work to incl:electrical and plumbing,hvac,bath,kitchen and enlarging closets. No increase in square footage. Date: January 29, 2002 Contractor: Paul C.Sider Client: Sider, Paul C | Permit id: B02000473 | |||||
SCORE 62 Building addition equal to 50% & over single-family dwelling an addition to an existing 1-sty single family to inc: a second sty (480sf) and an addition of the 1st sty (330sf) as per sketch. Date: April 22, 2002 Contractor: Paul C. Sider Client: Sider, Paul C | Permit id: B02001890 | |||||
SCORE 62 Change of use double residence convert existing 2-sty single into a double family dwelling per sketch, work to include: adding kitchen & plumb. Date: March 18, 2003 Contractor: Paul C. Sider Client: Sider, Paul C | Permit id: B03001487 | |||||
SCORE 70 Change of use daycare center change of use to expand the daycare center into the residential portion of the building as per plans. Date: October 29, 2003 Contractor: Shawnell Reed Client: Sider, Paul C | Permit id: B03004629 | |||||
SCORE 93 Electrical construction loop single-family dwelling anthony richard rough-in Date: February 7, 2002 Contractor: Anthony Richard Client: Sider, Paul C | Permit id: E02001056 | |||||
SCORE 56 Install mechanical equipment daycare center install elec air furnace and 3-ton condenser . Pete creppel - 347-1791 Date: November 12, 2003 Contractor: Marreor Ac Client: Sider, Paul C | Permit id: M03006915 | |||||
SCORE 56 Install mechanical equipment daycare center install elec air furnace and 3-ton condenser . Pete creppel - 347-1791 Date: November 12, 2003 Contractor: Marreor A C Client: Sider, Paul C | Permit id: M03006915 |