Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 "fico" addition & remodel to first floor of existing lodge as follows adding 434 sqft; removing 132 lf of interior partitions to create one large room, demo bathrooms & closets; adding 41 lf of interior partitions to create 4 bathrooms; adding a c; misc electrical & plumbing. Also, adding new fans in 2 bathrooms on 2nd floor. 05 22 12 plan check extension til 10 29 12... Vmd (this is a replacement of 1017-20090055) note to building the plans specify the occupancy as a r-1, but the facility is being used as a drug rehabilitation facility and should be classified as a r-4. 1j1p 6 7 12 Permit type: Addn/alt hotel, motel, comml bldgs | Permit status: Completed | Permit id: Pds2011-1017-20 | Parcel: 6500600400 | |||||
SCORE 100 "fico" addition & remodel to first floor of existing lodge adding 434 sqft, removing 132 lf of interior partitions to create one large room, demo bathrooms & closets; adding 41 lf of interior partitions to create 4 bathrooms; adding a c; misc epm also, adding new fans in 2 bathrooms on 2nd floor. 4 9 15 permit extended for 1 month per vince nicoletti... Vmt 10 14 14 permit renewal for one year 10-14-2015 at 25%. Must have valid inspections every 1 days to keep permit active. Maz 6 04 14 plan change changed location of handicap parking. See c of a vam. 5 20 13 courtesy renewal for one (1) year per cdw... Must have valid inspection within each 1 days to keep permit active... Cag 6 7 12 note to building the plans specify the occupancy as a r-1, but the facility is being used as a drug rehabilitation facility and should be classified as a r-4. 1j1p Permit type: Addn/alt hotel, motel, comml bldgs | Permit status: Completed | Permit id: Pds2012-1019-20 | Parcel: 6500600400 |