Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 79 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: June 12, 2017 Contractor: Pro Air Heating And Air Conditioning Permit type: Addn | Permit status: Completed | Completion date: August 10, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 21, 2017 Contractor: Solare Energy Inc Permit type: Addn | Permit status: Completed | Completion date: October 4, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 21, 2017 Contractor: Solare Energy Inc Permit type: Online | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 79 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: June 12, 2017 Contractor: Pro Air Heating And Air Conditioning Permit type: Hvac change out | Permit status: Completed | Permit id: Pds2017-Resalt- |