Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Addition permit Date: January 9, 2017 Client: Levy Jane Levy Micah | Permit status: Active | Permit id: 743139 | |||||
Zoning permit Date: December 1, 2016 Client: Levy Jane Levy Micah | Permit status: Completed | Permit id: 730313 | |||||
Demolition permit Date: December 15, 2016 Client: Levy Jane Levy Micah | Permit status: Active | Permit id: 743837 | |||||
SCORE 100 Rewire existing,install 65 outlets, recess lights, switches,with new complete 200amp service with all new circuits and proper grounding and smokes throughout per 2008 nec (sfd) Date: March 14, 2017 Contractor: Greg Terinoni Client: Levy Jane Levy Micah | Permit type: Electrical permit | Permit status: Completed | Completion date: September 13, 2017 | Permit id: 766576 | |||||
SCORE 100 Run water and drain line for 2nd floor bathroom, kitchen, laundry room,1st floor podwer room, and master bed room. Install fixtures when ready Date: March 27, 2017 Contractor: Nguyen Plumbing Inc Client: Levy Jane Levy Micah | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 8, 2017 | Permit id: 769607 | |||||
SCORE 82 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: December 15, 2016 Contractor: Bottos Construction Inc Client: Levy Jane Levy Micah | Permit type: Demolition permit | Permit status: Completed | Completion date: May 30, 2017 | Permit id: 743837 | |||||
SCORE 82 For the erection of a on story addition and decks. For interior level 3 alterations as per plans. Separate permits required for all mechanical, electrical, plumbing and fire suppression work. Date: January 9, 2017 Contractor: Bottos Construction Inc Client: Levy Jane Levy Micah | Permit type: Addition permit | Permit status: Completed | Completion date: September 8, 2017 | Permit id: 743139 | |||||
SCORE 100 (8) all wood sash replacements in existing openings as per attached drawing. Approved by the phc. (sfd) Date: May 4, 2017 Contractor: Emerald Windows Inc Client: Levy Jane Levy Micah | Permit type: Alteration permit | Permit status: Completed | Completion date: November 21, 2017 | Permit id: 780838 | |||||
SCORE 79 Install (1) heat pump with ductwork. Condenser located in rear yard as per attached drawing. Aprroved by the phc. (sfd) Date: April 10, 2017 Contractor: Climate Tech Inc Client: Levy Jane Levy Micah | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 8, 2017 | Permit id: 773981 | |||||
Full renovation of existing 3 story townhouse includig partial demolition and addition to rear (south) elevations as follows:south rear elevation: demolitionof existing 1st floor addition. Construction of new 1st floor addition. South rear elevation: demolition of existing 2nd floor deck. Construction of new 2nd floor addition & deck. South rear elevation: reconfiguration of existing 3rd floor exterior wall door & windows. Construction of new 3rd floor deck. North front elevation: replacement of existing front door and window sashes. Date: December 1, 2016 Client: Levy Jane Levy Micah | Permit type: Zoning permit | Permit status: Completed | Completion date: December 1, 2016 | Permit id: 730313 |