Demolition permit Date: November 5, 2013 Client: Lewis Gilbert | Permit status: Completed | Permit id: 504345 | |||||
Plumbing permit Date: July 12, 2011 Client: Lewis Gilbert | Permit status: Completed | Permit id: 352437 | |||||
Plumbing permit Date: July 12, 2011 Client: Lewis Gilbert | Permit status: Completed | Permit id: 352437 | |||||
Demolition permit Date: November 5, 2013 Client: Lewis Gilbert | Permit status: Completed | Permit id: 504345 | |||||
SCORE 100 Soil stack,remove and replace toilet Date: July 12, 2011 Contractor: Edward Hughes And Sons Inc Permit type: Plumbing permit | Permit status: Completed | Completion date: August 11, 2011 | Permit id: 352437 | |||||
SCORE 98 Interior demolition, non-load bearing partitions only(sfd) Date: November 5, 2013 Contractor: Sinni Removal Services Llc Permit type: Demolition permit | Permit status: Completed | Completion date: May 9, 2014 | Permit id: 504345 | |||||
SCORE 89 Interior demo of non-load bearing walls only. No structural work on this permit. Date: February 6, 2017 Contractor: Espana Brothers Permit type: Demolition permit | Permit status: Completed | Completion date: August 23, 2017 | Permit id: 757165 | |||||
SCORE 93 Application is for underpinning of foundation to lower the basement floor in an existing structure as per attached plan of a single family household living. Contractor shall provide shoring to safeguard adjacent properties prior to excavation and engineer shall be at site at the time of excavation Date: April 19, 2017 Contractor: Hybar Construction Llc Permit type: Alteration permit | Permit status: Active | Completion date: November 9, 2017 | Permit id: 765592 | |||||
Partial demolition of three story structure and construct three story addition at rear. Date: June 1, 2017 Permit type: Zoning/use permit | Permit status: Completed | Completion date: June 1, 2017 | Permit id: 773994 | |||||
SCORE 93 For the partial demolition of an existing 3 story attached structure, and the complete renovation of the existing structure, with a partial third story addition to existing two story (at rear). New roof deck accessed by pilot house, size and location as per plans. All demolition activity to be performed utilizing hand tools only, no power driven, gas, electric or other equipment is permitted. No new footing or foundation work is permitted. Date: June 1, 2017 Contractor: Hybar Construction Llc Permit type: Addition permit | Permit status: Active | Completion date: November 8, 2017 | Permit id: 773998 | |||||
SCORE 82 Upgraded to 200amp service with panel & rewire throughout with all required circuits protected by arc fault circuit breakers as per nec 2008 south district Date: June 14, 2017 Contractor: Rtk Solutions Llc Permit type: Electrical permit | Permit status: Completed | Completion date: November 2, 2017 | Permit id: 791861 | |||||
SCORE 89 Install (1) hvac system with ductwork. (sfd) Date: July 22, 2017 Contractor: Alkaun Co Permit type: Mechanical permit | Permit status: Completed | Completion date: November 8, 2017 | Permit id: 802195 | |||||
SCORE 100 Install 2 toilets 2 lavs,2 tubs,1 kitchen,1 washer,1"water service,house trap,house trap and fresh air inlet-pa1#20172300370-"self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: August 18, 2017 Contractor: Ferko Plumbing Permit type: Plumbing permit | Permit status: Active | Completion date: August 21, 2017 | Permit id: 809781 |