Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 2, 2015 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 17, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 86 Hvac change out - package system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: July 21, 2015 Contractor: George Plumbing Company Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 25, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 2, 2015 Contractor: Solar Watt Solutions Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 17, 2015 | Permit id: Pds2015-Resalt- | |||||
Final Date: September 24, 2015 Permit status: Pass | Permit id: Pds2015-Resalt- |