Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Roofing permit for total tear-off and overlay of 1 squares of metal and dimensional shingles at vertical and 12:12 slope. Roofing on 1975 addition and not historic section of building. ![]() ![]() Client: Presbyteri First | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: N&v | Current use: Religious assem | |||||
SCORE 95 Roofing permit for 6 squares of flat membrane roofing. ![]() ![]() Client: Presbyteri First | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: April 17, 2009 | Current use: Religious assem | |||||
SCORE 95 Re-roof small tower roof on first presbyterian church with mil fibertite, 5 squares. ![]() ![]() Client: Presbyteri First | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: N&v | Current use: Religious assem | |||||
SCORE 96 Remove old fuse box, replace with breaker panel. ![]() ![]() Client: First Presbyterian Church | Applicant: Teco Electric | Permit type: Electrical | Permit status: Cmp | Completion date: February 23, 2001 | Current use: Religious assem | |||||
SCORE 98 Remodel of church meeting room - includes building for new walls, drop-ceiling, mechanical for new duct work, electrical. Client: First Presbyterian Church | Applicant: Martin Homes Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 6, 2000 | Current use: Religious assem | |||||
SCORE 95 Fire suppression system - 1st pres. Church ![]() ![]() Client: Presbyteri First | Applicant: Cintas Corporation Dba | Permit type: Fire | Permit status: Cmp | Completion date: December 1, 2004 | Current use: Religious assem | |||||
SCORE 99 Replace water heater and gallon storage tank. In basement. ![]() ![]() Client: Presbyteri First | Applicant: Noah Plumbing And Heating | Permit type: Mechanical | Permit status: Cmp | Current use: Religious assem | |||||
SCORE 100 Fire alarm first presby church remodel ![]() ![]() Client: Presbyteri First | Applicant: Alta Milla Electric Corp | Permit type: Fire | Permit status: Cmp | Completion date: April 4, 2008 | Current use: Religious assem | |||||
SCORE 75 Interior tenant remodel of kitchen area used for church functions & outreach programs. Old equipment ot be removed (except refrigeration equip.), relocation of equipment, new grease trap, two new class i hoods, one new class ii hood, build out by contractor. Church to finish area with sinks, kitchen equipment (range, oven etc.) at a later date. Client: Presbyteri First | Applicant: J H L Constructors Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 9, 2007 | Current use: Religious assem | |||||
SCORE 75 Tenant remodel of church meeting rooms and administrative offices to add elevator and repair mechanical. Includes sump pit, no other plumbing. Client: Presbyteri First | Applicant: J H L Constructors Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 27, 2008 | Current use: Religious assem | |||||
SCORE 75 Interior non-structural demolition in preparation of tenant remodel work associated with pmt2007-02463 and pmt2007-02796 ![]() ![]() Client: Presbyteri First | Applicant: J H L Constructors Inc | Permit type: Demolition | Permit status: Cmp | Current use: Religious assem | |||||
SCORE 95 1st pres. Sprinkler tennant finish "geneva wing" ![]() ![]() Client: Presbyteri First | Applicant: American Sprinkler Inc | Permit type: Fire | Permit status: Cmp | Completion date: April 4, 2008 | Current use: Religious assem | |||||
SCORE 95 1st pres church sprinkler tennant finish kitchen ![]() ![]() Client: Presbyteri First | Applicant: American Sprinkler Inc | Permit type: Fire | Permit status: Cmp | Completion date: December 29, 2007 | Current use: Religious assem | |||||
SCORE 95 1st prres sprinkler tennant finish westminster ![]() ![]() Client: Presbyteri First | Applicant: American Sprinkler Inc | Permit type: Fire | Permit status: Cmp | Completion date: April 4, 2008 | Current use: Religious assem | |||||
SCORE 95 Roofing permit for total tear off and overlay of 104 squares of 30-7ear asphalt shingles at a 5:12 slope. ![]() ![]() Client: Presbyteri First | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: N&v | Current use: Religious assem | |||||
SCORE 95 Hood suppression system first presbeyterian church ![]() ![]() Client: Presbyteri First | Applicant: Sentry Fire And Safety | Permit type: Fire | Permit status: N&v | Current use: Religious assem | |||||
SCORE 98 Installation of a type i and a type ii hood. ![]() ![]() Client: Presbyteri First | Applicant: Fryco Systems, Inc. | Permit type: Mechanical | Permit status: Cmp | Completion date: November 2, 2009 | Current use: Religious assem | |||||
SCORE 97 Demolition permit to remove concrete slab in order to repair waterproofing of rooftop deck. Received lac ![]() ![]() Client: Presbyteri First | Applicant: Lvi Environmental Services Inc | Permit type: Demolition | Permit status: Cmp | Current use: Religious assem | |||||
SCORE 95 Remove existing roofing and re-roof with fibertite 45-mil xt, 21 squares, 1 4:1 pitch. ![]() ![]() Client: Presbyteri First | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: N&v | Current use: Religious assem | |||||
SCORE 98 Set crane on 16th st to set a c uniton 1st presbyterian church on 10 17 ![]() ![]() Client: Presbyteri First | Applicant: Sterling Crane Llc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 New 3 stop elevator ![]() ![]() Client: Presbyteri First | Applicant: Thyssenkrupp Elevator | Permit type: Elevator | Permit status: N&v | Current use: Religious assem | |||||
SCORE 95 Installation of free standing full color led sign for first presbyterian church. Sign to be located on corner of 15th and canyon. Sign not to change messages more than once per minute. Lumen rating for led model (watchfire 32x96 w series 19mm) is 361, which is well within 9 lumen limit for an unshielded light fixture. ![]() ![]() Client: Presbyteri First | Applicant: Davinci Sign Systems Inc | Permit type: Sign | Permit status: N&v | Current use: Religious assem | |||||
SCORE 71 Repair of concrete steps at first presbyterian church including replacement of handrails. Client: Presbyteri First | Applicant: Building Restoration Specialties | Permit type: Building | Permit status: Cmp | Completion date: February 1, 2011 | Current use: Religious assem | |||||
SCORE 71 Relocation of an existing sign on the sw corner inchfirst presbyterian churchinch to the nw corner of the parcel. Concurrent submittal with his2010-00271 ![]() ![]() Client: Presbyteri First | Applicant: Building Restoration Specialties | Permit type: Sign | Permit status: Cmp | Completion date: April 19, 2011 | Current use: Religious assem | |||||
SCORE 95 Removal of squares of deteriorated shingles on an 8 12 pitch and removal of 4 squares of deteriorated epdm and install replacement shingles and replacement epdm over densedeck or equivalent. Mid-roof inspection required. See his2012-00253 for supplemental information. ![]() ![]() Client: Presbyteri First | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: March 11, 2013 | Current use: Religious assem | |||||
SCORE 56 Installation of a replacement rtu -- like for like -- as detailed under his2013-00223. ![]() ![]() Client: Presbyteri First | Applicant: Presbyteri First | Permit type: Mechanical | Permit status: Cmp | Completion date: October 22, 2013 | Current use: Religious assem | |||||
SCORE 95 Overlay only for existing commercial roof. Scope of work involves swapping of membrane - leaving existing insulation in place, installing coverboard, and installinga new 90-mil, fully adhered epdm membrane roof. 2 squares, 1 4:12 pitch ; refer to attached cutsheet for material details. ![]() ![]() Client: Presbyteri First | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: March 24, 2014 | Current use: Religious assem | |||||
SCORE 95 Installation of a replacement rtu -- like for like -- as detailed under his2013-00223. Client: Presbyteri First | Permit type: Mechanical | Permit status: Cmp | Completion date: October 22, 2013 | Current use: Religious assembly, existing | Permit id: Pmt2013-04421 | |||||
SCORE 95 Overlay only for existing commercial roof. Scope of work involves swapping of membrane - leaving existing insulation in place, installing coverboard, and installinga new 90-mil, fully adhered epdm membrane roof. 2 squares, 1 4:12 pitch ; refer to attached cutsheet for material details. Client: Presbyteri First | Permit type: Roofing | Permit status: Cmp | Completion date: March 24, 2014 | Current use: Religious assembly, existing | Permit id: Pmt2013-05293 | |||||
SCORE 96 Remove old fuse box, replace with breaker panel. Client: First Presbyterian Church | Permit type: Electrical | Permit status: Cmp | Completion date: February 23, 2001 | Current use: Religious assembly, existing | Permit id: Pmt2001-00377 | |||||
SCORE 95 Removal of squares of deteriorated shingles on an 8 12 pitch and removal of 4 squares of deteriorated epdm and install replacement shingles and replacement epdm over densedeck or equivalent. Mid-roof inspection required. See his2012-00253 for supplemental information. Client: Presbyteri First | Permit type: Roofing | Permit status: Cmp | Completion date: March 11, 2013 | Current use: Religious assembly, existing | Permit id: Pmt2012-05501 | |||||
SCORE 95 Installation of free standing full color led sign for first presbyterian church. Sign to be located on corner of 15th and canyon. Sign not to change messages more than once per minute. Lumen rating for led model (watchfire 32x96 w series 19mm) is 361, which is well within 9 lumen limit for an unshielded light fixture. Client: Presbyteri First | Permit type: Sign | Permit status: N&v | Current use: Religious assembly, existing | Permit id: Pmt2010-02585 | |||||
SCORE 71 Relocation of an existing sign on the sw corner inchfirst presbyterian churchinch to the nw corner of the parcel. Concurrent submittal with his2010-00271 Client: Presbyteri First | Permit type: Sign | Permit status: Cmp | Completion date: April 19, 2011 | Current use: Religious assembly, existing | Permit id: Pmt2010-05706 | |||||
SCORE 98 Remodel of church meeting room - includes building for new walls, drop-ceiling, mechanical for new duct work, electrical. Client: First Presbyterian Church | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: December 6, 2000 | Current use: Religious assembly, remodel | Permit id: Pmt2000-01138 | |||||
SCORE 95 Re-roof small tower roof on first presbyterian church with mil fibertite, 5 squares. Client: Presbyteri First | Permit type: Roofing | Permit status: N&v | Current use: Religious assembly, existing | Permit id: Pmt2003-05053 | |||||
SCORE 95 Fire suppression system - 1st pres. Church Client: Presbyteri First | Permit type: Fire | Permit status: Cmp | Completion date: December 1, 2004 | Current use: Religious assembly, existing | Permit id: Pmt2004-04336 | |||||
SCORE 95 Roofing permit for 6 squares of flat membrane roofing. Client: Presbyteri First | Permit type: Roofing | Permit status: Cmp | Completion date: April 17, 2009 | Current use: Religious assembly, existing | Permit id: Pmt2006-01189 | |||||
SCORE 95 Roofing permit for total tear-off and overlay of 1 squares of metal and dimensional shingles at vertical and 12:12 slope. Roofing on 1975 addition and not historic section of building. Client: Presbyteri First | Permit type: Roofing | Permit status: N&v | Current use: Religious assembly, existing | Permit id: Pmt2006-01540 | |||||
SCORE 99 Replace water heater and gallon storage tank. In basement. Client: Presbyteri First | Permit type: Mechanical | Permit status: Cmp | Current use: Religious assembly, existing | Permit id: Pmt2007-00927 | |||||
SCORE 100 Fire alarm first presby church remodel Client: Presbyteri First | Permit type: Fire | Permit status: Cmp | Completion date: April 4, 2008 | Current use: Religious assembly, existing | Permit id: Pmt2007-02213 | |||||
SCORE 75 Interior tenant remodel of kitchen area used for church functions & outreach programs. Old equipment ot be removed (except refrigeration equip.), relocation of equipment, new grease trap, two new class i hoods, one new class ii hood, build out by contractor. Church to finish area with sinks, kitchen equipment (range, oven etc.) at a later date. Client: Presbyteri First | Permit type: Building, electrical, mechanical, plumbing, wastewater | Permit status: Cmp | Completion date: November 9, 2007 | Current use: Religious assembly, remodel | Permit id: Pmt2007-02463 | |||||
SCORE 75 Tenant remodel of church meeting rooms and administrative offices to add elevator and repair mechanical. Includes sump pit, no other plumbing. Client: Presbyteri First | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: February 27, 2008 | Current use: Religious assembly, tenant remodel | Permit id: Pmt2007-02796 | |||||
SCORE 95 1st pres. Sprinkler tennant finish inchgeneva winginch Client: Presbyteri First | Permit type: Fire | Permit status: Cmp | Completion date: April 4, 2008 | Current use: Religious assembly, existing | Permit id: Pmt2007-02900 | |||||
SCORE 95 1st pres church sprinkler tennant finish kitchen Client: Presbyteri First | Permit type: Fire | Permit status: Cmp | Completion date: December 29, 2007 | Current use: Religious assembly, existing | Permit id: Pmt2007-02902 | |||||
SCORE 95 1st prres sprinkler tennant finish westminster Client: Presbyteri First | Permit type: Fire | Permit status: Cmp | Completion date: April 4, 2008 | Current use: Religious assembly, existing | Permit id: Pmt2007-02903 | |||||
SCORE 95 Roofing permit for total tear off and overlay of 104 squares of 30-7ear asphalt shingles at a 5:12 slope. Client: Presbyteri First | Permit type: Roofing | Permit status: N&v | Current use: Religious assembly, existing | Permit id: Pmt2007-02977 | |||||
SCORE 95 Hood suppression system first presbeyterian church Client: Presbyteri First | Permit type: Fire | Permit status: N&v | Current use: Religious assembly, existing | Permit id: Pmt2007-03504 | |||||
SCORE 98 Installation of a type i and a type ii hood. Client: Presbyteri First | Permit type: Mechanical | Permit status: Cmp | Completion date: November 2, 2009 | Current use: Religious assembly, tenant remodel | Permit id: Pmt2007-03728 | |||||
SCORE 95 Remove existing roofing and re-roof with fibertite 45-mil xt, 21 squares, 1 4:1 pitch. Client: Presbyteri First | Permit type: Roofing | Permit status: N&v | Current use: Religious assembly, existing | Permit id: Pmt2007-04135 | |||||
SCORE 95 Replace 3 stop passenger elevator. Client: Presbyteri First | Permit type: Elevator | Permit status: N&v | Current use: Religious assembly, existing | Permit id: Pmt2007-04566 |